You are on page 1of 7

DASCO# 27

Date
Driller
S.T.P
Trip in/out check list Result pass (Y/N)
Item No Describtion Operation Safety
1 Stopper in catwalk installed
2 V-door covered with wood ( S 13%cr)
3 Pipe rack to be covered with plastic ( S13%cr)
4 Mouse hole to be covered with plastic ( S 13%cr)
5 Sufficient amount of plastic protector ( trip out)
6 Tbg dope available on site ( trip in)
7 Red zone area specified in rig floor
8 Kick plate installed in rig floor handrail
9 Air horse air shut off installed
10 Martin decker calibration
11 Red zone below rig floor restricted
12 Trip tank running , and trip sheet used
13 Pipe ram size matched to pipe size
14 HCR valve and chock manifold adjusted for hard shut off
15 Strip tank bottle in isolation mode
16 Master panel reading same like koomy unit reading
17 Sufficient amount of brine and chemical on site
18 Check thread of pin and box of the tbg

Check of handling equipment :-


A-Single Joint Elevator.
Check lifting sling certification - use 4 part Shackle
19 Check when latch safety pin is in, latch can not be
opened
Check latch safety pin correct wire retention
22 Check cotter pins used
B-Elevators
Check elevator Body certification including lifting ears.
Check secondary retention for Bolts - castle nut?
Check latch is functioning properly and safety catch

20

C-Hydraulic Power tong


certification
Check lifting frame handle for lock-nut or safety pin
Power tong height adjusting cylinder
Check certification
Check 4 parts shackles are used c/w cotter pin.
Secondary retention wire-sling is required over cylinder
21
D- slip
certification
Correct size of slips ( non marking in case of cr tbg.

22
23 E-check setting values of the torque in jam unit.
24 F- Teflon drift with correct size ( ID-0.125).
25 F.M away from the catwalk while pick up the pipe on V-DOOR
26 F.M Hand and leg away from the bottom of the tbg while receiving the drift
27 No interference between the air horse wire and the drilling line during trip
Clear vision between the air winch man and rest about man while handling the pipe from
28 pipe rack.
29 Suitable basket to collect the protector , another one for the garbage .
Temporary Derrick Equipment Register

TUBING DETAILED REFERENCE BOOK


REF Detailed Picture/diagram Remarks
B1 Single Joint Elevator
Check that the elevator is the CORRECT size

Check lifting sling certication - use 4 part Shackle


Check elevator Body certification including lifting ears.
Check lifting swivel certification.
Check latch safety pin correct wire retention
Check when latch safety pin is in, latch can not be opened
Check cotter pins used - No welding rods or safety clips

B2 YT Elevators
Check retention wire is in place and not broken of Top Plates
Check elevator Body certification including lifting ears.
Check secondary retention for Bolts - castle nut?

Check latch is functioning properly and safety catch

Check slip inserts are right size?


Check slips dies are in good condition.

B3 Hydraulic Power tong


Check lifting frame handle for lock-nut or safety pin
Check lifting frame
Check power tong lifting point for:
1. certifcation
2. All nuts have spring washers
3. R clip?? Is in Prefer cotterpin!
SWL Shackle = 1.5 Ton

B4 Powertong height adjusting cylinder


Check certification
Check 4 parts shackles are used c/w cotterpin.
Check secondary retention systems for nuts being used.
Secondary retention wire-sling is required over cylinder
SWL Shackle = 1.5 Ton

B5 Powertong Spring Cylinder


Check certification
Check 4 parts shackles are used c/w cotterpin
Secondary retention wire-sling is required over cylinder
SWL Shackle = 1.5 Ton

B6 Swivels used for Power tong & TOP spider


Check certifcation of swivel itself + lifting sling
Ensure 4 part shackles are used
Only cotterpins are allowed
SWL = 1.5 MT
Date Signature
Result

ORRECT size

kle

n of Top Plates

t?

catch

size?

ty pin
eing used.
r cylinder

r cylinder