Professional Documents
Culture Documents
Date
Driller
S.T.P
Trip in/out check list Result pass (Y/N)
Item No Describtion Operation Safety
1 Stopper in catwalk installed
2 V-door covered with wood ( S 13%cr)
3 Pipe rack to be covered with plastic ( S13%cr)
4 Mouse hole to be covered with plastic ( S 13%cr)
5 Sufficient amount of plastic protector ( trip out)
6 Tbg dope available on site ( trip in)
7 Red zone area specified in rig floor
8 Kick plate installed in rig floor handrail
9 Air horse air shut off installed
10 Martin decker calibration
11 Red zone below rig floor restricted
12 Trip tank running , and trip sheet used
13 Pipe ram size matched to pipe size
14 HCR valve and chock manifold adjusted for hard shut off
15 Strip tank bottle in isolation mode
16 Master panel reading same like koomy unit reading
17 Sufficient amount of brine and chemical on site
18 Check thread of pin and box of the tbg
20
22
23 E-check setting values of the torque in jam unit.
24 F- Teflon drift with correct size ( ID-0.125).
25 F.M away from the catwalk while pick up the pipe on V-DOOR
26 F.M Hand and leg away from the bottom of the tbg while receiving the drift
27 No interference between the air horse wire and the drilling line during trip
Clear vision between the air winch man and rest about man while handling the pipe from
28 pipe rack.
29 Suitable basket to collect the protector , another one for the garbage .
Temporary Derrick Equipment Register
B2 YT Elevators
Check retention wire is in place and not broken of Top Plates
Check elevator Body certification including lifting ears.
Check secondary retention for Bolts - castle nut?
ORRECT size
kle
n of Top Plates
t?
catch
size?
ty pin
eing used.
r cylinder
r cylinder