PROJECT TITLE:
S U R U H A N J A Y A
P E N G A N G K U T A N AW A M D A R A T
Winch Trolley LA N D PUBLIC TRA NSPORT
Main Girder (CE) SPAD C O M M I S S I O N
45 tonne
Counterweight SURUHANJAYA PENGANGKUTAN AWAM DARAT
Front
Support CORP
(FS)
Mass Rapid Transit Corporation Sdn Bhd
(902884-V)
6.200 3.200 1.000
9.400 5th FLOOR MENARA I&P 1,
JALAN DUNGUN, DAMANSARA HEIGHTS,
50490 KUALA LUMPUR
PROJECT DELIVERY PARTNER :
39.800 39.800
Operations STEP 6:
SYMBOLS LEGEND: BLOCK A, LEVEL 7,
MENARA MUSTAPHA KAMAL,
1. Position Winch Trolley with counterweight on AS. PJ TRADE CENTER
2. With Main Girder still anchor to RS, connect AS anchoring device to main girder.
MAIN GIRDER ANCHORING TO SUPPORT NO.8, JALAN PJU 8/8A,
BANDAR DAMANSARA PERDANA,
3. Lower AS jack on deck. Install AS anchoring beams and stress bars that connect AS to deck 47820 PETALING JAYA, SELANGOR.
(200kN for bottom bars, 145kN for upper bars).
LEAD CONSULTANT:
4. Disconnect movement device to AS and connect movement device to RS. SUPPORT MOVEMENT DEVICE CONNECTED PRODUKTIF SEPAKAT
5. Remove RS anchoring device to Main Girder. CONSULTING ENGINEERS SDN BHD
NO. 73A, JALAN SS6/10, KELANA JAYA
6. Disengage RS anchoring beams and bars connecting RS to deck. 47301 PETALING JAYA, SELANGOR D.E.
7. Lift RS jacks. Tel : 603-78802601 Fax : 603-78806477
E-mail : psce@streamyx.com
TROLLEY ANCHORING TO SUPPORT IN ASSOCIATION WITH :
0.013
CL of SBG
ACRE WORKS
M-3-10 Plaza Damas
No. 60 Jalan Sri Hartamas 1
50480 Kuala Lumpur
Telephone : (60-3) 620 33819
Facsimile : (60-3) 620 33809
FS
H00 11/9/14 FIRST ISSUE JO KAR
0.296
AS RS
JO
JO
KAR
11/9/2014
KVMRT-MCB-SBK-PKG3-VIA-ST-SBG-CSQ-002471 H00