Professional Documents
Culture Documents
D14-D16/DD-EL +136.921
D14-D16/DD-EL +137.043
D14-D16/DD-EL +137.100
D14-D16/DD-EL +137.156
KERAJAAN MALAYSIA
PROJECT TITLE:
PROJECT PACKAGE:
SUPERVISING AGENCY :
H01 6035
A
1040 2480 40 2440 35
KEMENTERIAN PENGANGKUTAN
2* D 14 2* D 16 MALAYSIA
2* D 14
No. 26, JALAN TUN HUSSEIN, PRESINT 4,
Z1M234 YCP-2520 62100 W.P PUTRAJAYA
TEL : +603 8000 8000 / FAX : +603 8888 0158
66
66
PROJECT OWNER :
125
50
50
MALAYSIA RAPID TRANSIT SYSTEM SDN BHD
201901044132 (1353462-M)
TINGKAT 5, MENARA I&P 1,
No. 46, JALAN DUNGUN, BUKIT DAMANSARA,
50490 KUALA LUMPUR.
TEL : +603 2081 3000 / FAX : +603 2095 2121
134
134
125
CONSULTANT :
ARCHITECT :
FRONT VIEW Tel: +603 5650 5156 Fax: +603 5650 5157
PACKAGE SUB-CONTRACTOR :
A - A
Designed By : -
Drawn By : CMA
Checked By : BSKhoo
Approved By : -
CAD file no : Z1-PU1_H01
Scale : 1:3
Date : 23.02.2024
Drawing Title :
4 No(s) PURLIN REQUIRED AS DRAWN MKD' Z1-PU1
GENERAL NOTES: PACKAGE 6 - DEPOT & POWER SUPPLY
1 . ALL DIMENSIONS ARE IN mm (U.N.O). 4. FOR WELDING STANDARD REFER DRAWING NO.: DETAIL OF PURLIN
RTS-H-APSB-PKG6-WAHD-CNS-STR-100001 ~ 100005
2 . ALL HOLES ARE 22 mm (U.N.O).
Tekla Structures
Mark Size Grade Length (mm) No. Area m2 Kg/Unit Net Weight BOLT LIST FOR ASSEMBLY Z1-PU1 No. 4
Z1M234 YCP-2520 S275 6035.00 1 6.00 41.12 41.12 Diam Grade Type Length No Member SHOP DRAWING Drawing No :
Z1-PU1
Rev
H01
Grand Total 6.00 41.12 12 8.8XOX Site 35 4 Z1-PU1 TO Z1-TR35