Logotype: ZEM-EHERHOBUD

• Conducts activity since 2006

• Two main branches of activity:


- Execution of EPCI-contracts of energy construction
«E2E»

- Delivery of energy construction


More than 40 successfully completed
EPCI-contracts on our stock of orders
And more than 50 projects for energy
construction delivery
Execution of EPCI-contracts of
energy construction “E2E” includes:

- project works;
- selection and delivery of equipment;
- installation and construction works;
- startup and commissioning of equipment;
- staff training;
- placing in operation.
To execute project works we
cooperate with leading project
energy organizations:
Delivery of equipment is made in
cooperation with:
Delivery of equipment is made in
cooperation with:
The execution of installation and
construction works is conducted in
compliance with all state estimate norms and
safety measures
All delivered equipment is tested,
readjusted and approbated.
Project ends up with putting the object
into operation
For 12 years of company existence :
• 46 successfully and timely completed EPCI-projects

• 3 projects are currently in the process of being completed

for

• 18 satisfied clients-Customers

• The total amount of assimilated funds amounts to 1 billion UAH


For 12 years of company existence :

32 projects completed in capacity of 12 projects made within new


prime contractor construction conditions

0 9
13 12
Новые
Newобъекты
objects
Реконструкции
Reconstructions
Модернизации
Modernization
32
19 projects included 24
equipment delivery

19

27
SIGNIFICANT PROJECTS
1

Second construction stage of the


station «Pozniaky» Kyiv:
November 2016 - November 2017
SIGNIFICANT PROJECTS
1

EXECUTED:
• Installation of foundations of boiler room, pumproom, smoke-induced room and foundations of two gas boilers;
• Delivery and installation of metal constructions frame, boiler room, pumproom, smoke-induced room , enclosure structures made from sandwich panels,
membrane roof construction;
• Delivery and installation of heating conduit, diameter up to 1020 mm included as well as pipes of auxiliary equipment of the substation;
• Delivery and installation of water boiler КВ-Г-116,3-150 with a capacity of 100 Hkal/hour, blower ВДН-18 with frequency regulated and complex of technical
process auto control (АСУ ТП);
• Delivery and installation of smoke flue elements with the hookup point into exsting reinforced concrete smoke pipe 80 m high;
• Delivery and installation of complex station-service switchboard 6 kV (КРУСН-6kV), complex switchboard 0,4 kV (КРУ-0,4kV), two dry type transformers
6/0,4 kV 1000 kVA, with cabal lines 6 kV made from crossed linked polyethylene;
• Delivery and installation of two cubicles 6 kV for ПС 110/6 kV «Yuzhnaya» with the complex of installation and pre-commissioning works;
• Delivery and installation and adjusting of technical process auto control АСУ ТП realized at Honeywell construction;
• Pre-commissioning works of all thermotechnical and electrical equipment of АСУ ТП system;
• Delivery and installation of additional ventilation systems and climate control, gas suppression system, clock system, phone line;
• Execution of works on installation of external engineer nets and installation of technological gas pipe of 700mm diameter;
• Execution of land improvements, including in-site asphaltic roads;
• Pre-commissioning works on station equipment with the combined testing;
• Putting the object into operation.
Works were executed within the conditions of new construction.
SIGNIFICANT PROJECTS
2

Reconstruction of substation 110/10/6


kV «Vyshgorod»
Providing power of Кyiv HEP in Ukrainian energy system
December 2013 – May 2014
SIGNIFICANT PROJECTS
2

EXECUTED:

• 6 oil switches of МКП-110 kV type with foundation have been dismantled;

• 6 SF 6 circuit-breaker of 110kV of 120-SFM-32B type have been installed, six sets of current transformer 110kV of ТФЗМ-110-Б-IVУ1 type, 1
set of voltage transformer 110 kV of НКФ-110-II-У1 type with foundation;

• Installation earthing ring and new cable trays;

• Modification of entrances and bus arrangement 110 kV, re-laying of two ВЛ-110 kV for electric substation;

• Delivery of installed binders of ЯПВ, ЯОВ, ЯЗВ, ЯЗ types, relay boards;

• All commissioning works have been executed;

• Outdated net bar of substation was replaced with reinforced concrete fence

All works were executed within the conditions of operating substation 110 kV
SIGNIFICANT PROJECTS
3

PK «Power Engineering Plant» urban


village Malynivka:
Reconstruction of existing industrial building
2009-2011
SIGNIFICANT PROJECTS
3

EXECUTED:
• Complex of construction and installation works on reconstruction of existing industrial plants and additional buildings with
the total area of 35000 sq.m. and building area 20 ha and putting into operation the object built along with the works:

• Reconstruction of building part of industrial and administration and amenity rooms.

• Delivery and installation of all technological equipment in full.

• Delivery and installation of 6 two transformer ТП 10/0,4 kV.

• Reconstruction of cubicles10 kV , delivery of equipment for ПС 110/10 кВ «Malynivka».

• Filler piece КЛ-10 and 0,4 kV.

• Installation of networks, outside lighting, water delivery, canalization, showerly and faecal in-site utility networks a full scale.

• Construction and installation of pumping system with the water tower.

• Delivery and installation of boiling room including 2 boilers ДКВР and the complex of gas engine generator.

• Execution of land improvements, including in-site asphaltic roads;


• Putting the object into operation.
We highly appreciate partnership and we
believe it is the most significant
component of company success in terms
of achieving goals and follow its mission:
Creation of modern energy objects that make a
new level for power industry, and correspond
to the highest world standards of
effectiveness, ecology, quality and safety.