- project works;
- selection and delivery of equipment;
- installation and construction works;
- startup and commissioning of equipment;
- staff training;
- placing in operation.
To execute project works we
cooperate with leading project
energy organizations:
Delivery of equipment is made in
cooperation with:
Delivery of equipment is made in
cooperation with:
The execution of installation and
construction works is conducted in
compliance with all state estimate norms and
safety measures
All delivered equipment is tested,
readjusted and approbated.
Project ends up with putting the object
into operation
For 12 years of company existence :
• 46 successfully and timely completed EPCI-projects
for
• 18 satisfied clients-Customers
0 9
13 12
Новые
Newобъекты
objects
Реконструкции
Reconstructions
Модернизации
Modernization
32
19 projects included 24
equipment delivery
19
27
SIGNIFICANT PROJECTS
1
EXECUTED:
• Installation of foundations of boiler room, pumproom, smoke-induced room and foundations of two gas boilers;
• Delivery and installation of metal constructions frame, boiler room, pumproom, smoke-induced room , enclosure structures made from sandwich panels,
membrane roof construction;
• Delivery and installation of heating conduit, diameter up to 1020 mm included as well as pipes of auxiliary equipment of the substation;
• Delivery and installation of water boiler КВ-Г-116,3-150 with a capacity of 100 Hkal/hour, blower ВДН-18 with frequency regulated and complex of technical
process auto control (АСУ ТП);
• Delivery and installation of smoke flue elements with the hookup point into exsting reinforced concrete smoke pipe 80 m high;
• Delivery and installation of complex station-service switchboard 6 kV (КРУСН-6kV), complex switchboard 0,4 kV (КРУ-0,4kV), two dry type transformers
6/0,4 kV 1000 kVA, with cabal lines 6 kV made from crossed linked polyethylene;
• Delivery and installation of two cubicles 6 kV for ПС 110/6 kV «Yuzhnaya» with the complex of installation and pre-commissioning works;
• Delivery and installation and adjusting of technical process auto control АСУ ТП realized at Honeywell construction;
• Pre-commissioning works of all thermotechnical and electrical equipment of АСУ ТП system;
• Delivery and installation of additional ventilation systems and climate control, gas suppression system, clock system, phone line;
• Execution of works on installation of external engineer nets and installation of technological gas pipe of 700mm diameter;
• Execution of land improvements, including in-site asphaltic roads;
• Pre-commissioning works on station equipment with the combined testing;
• Putting the object into operation.
Works were executed within the conditions of new construction.
SIGNIFICANT PROJECTS
2
EXECUTED:
• 6 SF 6 circuit-breaker of 110kV of 120-SFM-32B type have been installed, six sets of current transformer 110kV of ТФЗМ-110-Б-IVУ1 type, 1
set of voltage transformer 110 kV of НКФ-110-II-У1 type with foundation;
• Modification of entrances and bus arrangement 110 kV, re-laying of two ВЛ-110 kV for electric substation;
• Outdated net bar of substation was replaced with reinforced concrete fence
All works were executed within the conditions of operating substation 110 kV
SIGNIFICANT PROJECTS
3
EXECUTED:
• Complex of construction and installation works on reconstruction of existing industrial plants and additional buildings with
the total area of 35000 sq.m. and building area 20 ha and putting into operation the object built along with the works:
• Installation of networks, outside lighting, water delivery, canalization, showerly and faecal in-site utility networks a full scale.
• Delivery and installation of boiling room including 2 boilers ДКВР and the complex of gas engine generator.