Job No:
Page 2 of 3
15 Electronic enclosure gasket installed correctly
16 Door locking arm washer installed
17 Door opening from right side [ ], left side [ ]
18 HMI insulation fitting
19 Install Display window into Bezel with RTV Silicone
20 Place display with M3 nuts secured with 4-M3 SS holding
clamps
21 Install 4-M3x10 spacer finger tight
22 Install cables on display with secure cable trunk
23 Connect Power cable to Display PWR (ensure Red connected
to “+” bottom of HMI unit)
24 Verify overpressure test of enclosure is performed at
9.75 bar by supplier