INSPECTION TOOLS AND PPE RESULT JANUARI 2019

PROJECT #REF!
DATE 11-Jan-19
COMPANY PT. MMB
INSPECTION BY :ALOYSIUS
WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT EXPIRE
No
CABLE HOSE GRINDERS TORCH CABLE CABLE HARNES DATE DATE
1 MMB-001 MMB-001 MMB-001 MMB-001 11-Jan-19 11-Feb-19
2 MMB-002 MMB-002 MMB-002 MMB-002 11-Jan-19 11-Feb-19
3 MMB-003 MMB-003 MMB-003 11-Jan-19 11-Feb-19
4 MMB-004 MMB-004 11-Jan-19 11-Feb-19
5 MMB-005 11-Jan-19 11-Feb-19
6 MMB-006 11-Jan-19 11-Feb-19
7 MMB-007 11-Jan-19 11-Feb-19
8 MMB-008 11-Jan-19 11-Feb-19
9 MMB-009 11-Jan-19 11-Feb-19
10 MMB-010 11-Jan-19 11-Feb-19
11 MMB-011 11-Jan-19 11-Feb-19
12 MMB-012 11-Jan-19 11-Feb-19

Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -
diberikan logo atau sticker inspeksi…!!!

INSPECTION TOOLS AND PPE RESULT FEBRUARI 2019

PROJECT #REF!
DATE
COMPANY
INSPECTION BY :
WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT EXPIRE
No
No
CABLE HOSE GRINDERS TORCH CABLE CABLE HARNES DATE DATE

DIDN’T INSPECT
REMARKS

REMARKS
REMARKS
INSPECTION TOOLS AND PPE RESULT SEPTEMBER 2020

PROJECT REPAIR
DATE 16-Sep-20
COMPANY PT. BMP
INSPECTION BY MAHMUDIN & PETRUS
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BBP-WC-01 BBP-GH-01 BBP-CT-01 BBP-EPC-01
2 BBP-WC-02 BBP-GH-02 BBP-EPC-02
3 BBP-WC-03 BBP-GH-03 BBP-EPC-03
4 BBP-WC-04 BBP-GH-04 BBP-EPC-04
5 BBP-WC-05 BBP-GH-05 BBP-EPC-05
6 BBP-EPC-06

INSPECTION TOOLS AND PPE RESULT OKTOBER 2020

PROJECT REPAIR
DATE 16-Sep-20
COMPANY PT. BBP
INSPECTION BY MAHMUDIN & PETRUS
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BBP-WC-01 BBP-GH-01 BBP-CT-01 BBP-EPC-01
2 BBP-WC-02 BBP-GH-02 BBP-CT-02 BBP-EPC-02
3 BBP-WC-03 BBP-GH-03 BBP-CT-03 BBP-EPC-03
4 BBP-WC-04 BBP-GH-04
5 BBP-WC-05 BBP-GH-05
6 BBP-WC-06
7 BBP-WC-07
8 BBP-WC-08
9 BBP-WC-09
10 BBP-WC-10

PROJECT REPAIR
DATE 16-Sep-20
COMPANY PT. BBP
INSPECTION BY ALOISIUS
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BBP-WC-01 BBP-GH-01 BBP.PG.01 BBP-CT-01 BBP-EPC-01
2 BBP-WC-02 BBP-GH-02 BBP-CT-02 BBP-EPC-02
PROJECT REPAIR
DATE 16-Mar-21
COMPANY PT. BBP
INSPECTION BY ALOISIUS
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BBP-WC-01 BBP-GH-01 BBP.PG.01 BBP-CT-01 BBP-EPC-01 - -
2 BBP-WC-02 BBP-GH-02 - BBP-CT-02 BBP-EPC-02 - -
EPTEMBER 2020

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
16-Sep-20 16-Oct-20
16-Sep-20 16-Oct-20
16-Sep-20 16-Oct-20
OK
16-Sep-20 16-Oct-20
16-Sep-20 16-Oct-20
16-Sep-20 16-Oct-20

OKTOBER 2020

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
OK
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20
16-Oct-20 16-Nov-20

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
1-Dec-20 1-Jan-21
OK
1-Dec-20 1-Jan-21
BODY INSPECT EXPIRE
REMARKS
HARNES DATE DATE
- 16-Mar-21 16-Mar-21
OK
- 16-Mar-21 16-Mar-21
INSPECTION TOOLS AND PPE RESULT JANUAR

PROJECT : REPAIR
DATE : 12-Jan-21
COMPANY : PT. BMP
INSPECTION BY : ROBERT
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 BMP-WC-01 BMP-GH-01 BMP-PG-01 BPM-CT-01 BMP-EPC-01
2 BMP-GH-02
S AND PPE RESULT JANUARI 2021

LAMP BODY INSPECT EXPIRE


REMARKS
CABLE HARNES DATE DATE
12-Jan-21 12-Feb-21 OK
12-Jan-21 12-Feb-21 OK
INSPECTION TOOLS AND

PROJECT :
DATE : 06 Januari 2021
COMPANY : PT. BBT
INSPECTION BY :
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH

DIDN’T INSPECT ( DIDN’T


Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, d
diberikan logo atau sticker inspeksi…!!!

INSPECTION TOOLS AND PPE

PROJECT : Seaswift H-361


DATE : 6-Feb-21
COMPANY : PT. BBT
INSPECTION BY : Robert V. Butarbutar
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 BBT.WC.01 BBT.GH.01 BBT.PG.O1 BBT.CT.01
2 BBT.WC.02 BBT.GH.02 BBT.PG.O2 BBT.CT.02
3 BBT.WC.03 BBT.GH.03 BBT.PG.O3 BBT.CT.03
4 BBT.WC.04 BBT.GH.04 BBT.PG.O4 BBT.CT.04
5 BBT.WC.05 BBT.GH.05 BBT.PG.O5 BBT.CT.05
6 BBT.WC.06 BBT.PG.O6
7 BBT.WC.07 BBT.PG.O7
8 BBT.WC.08
9 BBT.WC.09
10 BBT.WC.10
11 BBT.WC.11
12 BBT.WC.12
13 BBT.WC.13
14 BBT.WC.14
15 BBT.WC.15
Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, d
diberikan logo atau sticker inspeksi…!!!

INSPECTION TOOLS AND PP


PROJECT :Seaswift H-361
DATE :3/6/2021
COMPANY :PT. BBT
INSPECTION BY :Robert V. Butarbutar
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 BBT.WC.01 BBT.GH.01 BBT.PG.O1 -
2 BBT.WC.02 BBT.GH.02 BBT.PG.O2 -
3 BBT.WC.03 BBT.GH.03 BBT.PG.O3 -
4 BBT.WC.04 BBT.GH.04 BBT.PG.O4 -
5 BBT.WC.05 BBT.GH.05 BBT.PG.O5 -
6 BBT.WC.06 BBT.GH.06 BBT.PG.O6 -
7 BBT.WC.07 BBT.GH.07 BBT.PG.O7 -
8 BBT.WC.08 BBT.GH.08 BBT.PG.O8 -
9 BBT.WC.09 - BBT.PG.O9 -
10 BBT.WC.10 - BBT.PG.O10 -
11 BBT.WC.11 - - -
12 BBT.WC.12 - - -
13 BBT.WC.13 - - -
Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, d
diberikan logo atau sticker inspeksi…!!!
NSPECTION TOOLS AND PPE RESULT JANUARI 2021

POWER LAMP BODY INSPECT


CABLE CABLE HARNES DATE

N’T INSPECT ( DIDN’T JOINT ON BOARD)


nspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -

ECTION TOOLS AND PPE RESULT FEBRUARI 2021

POWER LAMP ELECTRICAL BODY


CABLE CABLE PANEL HARNES
BBT.PC.01
BBT.PC.02
BBT.PC.03
BBT.PC.04
BBT.PC.05
BBT.PC.06
BBT.PC.07

nspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -

PECTION TOOLS AND PPE RESULT MARET 2021


POWER LAMP ELECTRICAL BODY
CABLE CABLE PANEL HARNES
BBT.PC.01 BBT.EL.01 - -
BBT.PC.02 BBT.EL.02 - -
BBT.PC.03 BBT.EL.03 - -
BBT.PC.04 BBT.EL.04 - -
BBT.PC.05 BBT.EL.05 - -
BBT.PC.06 BBT.EL.06 - -
BBT.PC.07 BBT.EL.07 - -
BBT.PC.08 BBT.EL.08 - -
BBT.PC.09 - - -
BBT.PC.10 - - -
BBT.PC.11 - - -
BBT.PC.12 - - -
BBT.PC.13 - - -
nspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -
EXPIRE
REMARKS
DATE

INSPECT EXPIRE
REMARKS
DATE DATE
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
6-Feb-21 5-Mar-21
INSPECT EXPIRE
REMARKS
DATE DATE
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
Kondisi
6-Mar-21 5-Apr-21
OK
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
6-Mar-21 5-Apr-21
15-Sep-20
INSPECTION TOOLS AND PPE RESULT JANUARI

PROJECT : H-355 & H-356


DATE : 12-Jan-21
COMPANY : PT. MSO
INSPECTION BY : ROBERT BUTAR-BUTAR
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 WC/MSO/01 GH/MSO/01 GR/MSO/01 PC/MSO/01 MSO/LC/01
2 WC/MSO/02 GH/MSO/02 GR/MSO/02 PC/MSO/02 MSO/LC/02
3 WC/MSO/03 PC/MSO/03 MSO/LC/03
4 WC/MSO/04 PC/MSO/04 MSO/LC/04
5 WC/MSO/05 PC/MSO/05 MSO/LC/05
6 WC/MSO/06 PC/MSO/06 MSO/LC/06
7 WC/MSO/07 MSO/LC/07
8 WC/MSO/08 MSO/LC/08
9 WC/MSO/09
10 WC/MSO/10
WC/MSO/11
WC/MSO/12
11 WC/MSO/13
PE RESULT JANUARI 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
MSO/BH/01 12-Jan-21 12-Feb-21
MSO/BH/02 12-Jan-21 12-Feb-21
MSO/BH/03 12-Jan-21 12-Feb-21
MSO/BH/04 12-Jan-21 12-Feb-21
MSO/BH/05 12-Jan-21 12-Feb-21
MSO/BH/06 12-Jan-21 12-Feb-21
KONDISI
MSO/BH/07 12-Jan-21 12-Feb-21 VISUAL OK
MSO/BH/08 12-Jan-21 12-Feb-21
MSO/BH/09 12-Jan-21 12-Feb-21
MSO/BH/10 12-Jan-21 12-Feb-21
MSO/BH/11 12-Jan-21 12-Feb-21
MSO/BH/12 12-Jan-21 12-Feb-21
INSPECTION TOOLS AND PPE RESULT JANUARI 20

PROJECT : SEA SWIFT/ H-361


DATE : 22-01-2021
COMPANY : PT. DKI
INSPECTION BY : RIO HERMANTO

WELDING GAS PORTABLE Cutting ELECTRICAL POWER


No
CABLE HOSE GRINDERS Torch PANEL CABLE
1 DKI-WC-01 DKI-GH-01 DKI-PG-01 DKI-CT-01 DKI-PC-01
2 DKI-WC-02 DKI-GH-02 DKI-PG-02 DKI-CT-02 DKI-PC-02
3 DKI-WC-03 DKI-GH-03 DKI-PG-03 DKI-CT-03 DKI-PC-03
4 DKI-WC-04 DKI-GH-04 DKI-PG-04 DKI-CT-04 DKI-PC-04
5 DKI-WC-05 DKI-GH-05 DKI-PG-05 DKI-CT-05 DKI-PC-05
6 DKI-WC-06 DKI-GH-06 DKI-PG-06 DKI-CT-06 DKI-PC-06
7 DKI-WC-07 DKI-GH-07 DKI-PG-07 DKI-CT-07 DKI-PC-07
8 DKI-WC-08 DKI-GH-08 DKI-PG-08 DKI-CT-08 DKI-PC-08
9 DKI-WC-09 DKI-GH-09 DKI-PG-09 DKI-PC-09
10 DKI-WC-10 DKI-GH-10 DKI-PG-10 DKI-PC-10
11 DKI-WC-11 DKI-GH-11 DKI-PG-11 DKI-PC-11
12 DKI-WC-12 DKI-GH-12 DKI-PG-12 DKI-PC-12
13 DKI-WC-13 DKI-GH-13 DKI-PG-13 DKI-PC-13

INSPECTION TOOLS AND PPE RESULT FEBRUARI 2

PROJECT : SEA SWIFT/ H-361


DATE : 22-02-2021
COMPANY : PT. DKI
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE Cutting ELECTRICAL POWER


No
CABLE HOSE GRINDERS Torch PANEL CABLE
1 DKI-WC-01 DKI-GH-01 DKI-PG-01 DKI-CT-01 DKI-EP-01 DKI-PC-01
2 DKI-WC-02 DKI-GH-02 DKI-PG-02 DKI-CT-02 DKI-EP-02 DKI-PC-02
3 DKI-WC-03 DKI-GH-03 DKI-PG-03 DKI-CT-03 DKI-EP-03 DKI-PC-03
4 DKI-WC-04 DKI-GH-04 DKI-PG-04 DKI-CT-04 DKI-EP-04 DKI-PC-04
5 DKI-WC-05 DKI-GH-05 DKI-PG-05 DKI-CT-05 DKI-EP-05 DKI-PC-05
6 DKI-WC-06 DKI-GH-06 DKI-PG-06 DKI-CT-06 DKI-PC-06
7 DKI-WC-07 DKI-GH-07 DKI-PG-07 DKI-CT-07 DKI-PC-07
8 DKI-WC-08 DKI-PG-08 DKI-PC-08
9 DKI-WC-09 DKI-PG-09 DKI-PC-09
10 DKI-WC-10 DKI-PG-10 DKI-PC-10
11 DKI-WC-11 DKI-PG-11 DKI-PC-11
12 DKI-WC-12 DKI-PG-12 DKI-PC-12
13 DKI-WC-13 DKI-PG-13 DKI-PC-13
E RESULT JANUARI 2021

LAMP BODY INSPECT EXPIRE


REMARKS
CABLE HARNES DATE DATE
DKI-ETC-01 DKI-BH-01 22-01-2021 22-Feb-21
DKI-ETC-02 DKI-BH-02 22-01-2021 22-Feb-21
DKI-ETC-03 DKI-BH-03 22-01-2021 22-Feb-21
DKI-ETC-04 DKI-BH-04 22-01-2021 22-Feb-21
DKI-ETC-05 DKI-BH-05 22-01-2021 22-Feb-21
DKI-ETC-06 DKI-BH-06 22-01-2021 22-Feb-21
DKI-ETC-07 DKI-BH-07 22-01-2021 22-Feb-21 KONDISI
VISUAL
DKI-ETC-08 DKI-BH-08 22-01-2021 22-Feb-21 OK
DKI-ETC-09 DKI-BH-09 22-01-2021 22-Feb-21
DKI-ETC-10 DKI-BH-10 22-01-2021 22-Feb-21
DKI-ETC-11 22-01-2021 22-Feb-21
DKI-ETC-12 22-01-2021 22-Feb-21
22-01-2021 22-Feb-21

E RESULT FEBRUARI 2021

LAMP BODY INSPECT EXPIRE


REMARKS
CABLE HARNES DATE DATE
DKI-ETC-01 DKI-BH-01 22-Feb-21 22-Mar-21
DKI-ETC-02 DKI-BH-02 22-Feb-21 22-Mar-21
DKI-ETC-03 DKI-BH-03 22-Feb-21 22-Mar-21
DKI-ETC-04 DKI-BH-04 22-Feb-21 22-Mar-21
DKI-ETC-05 DKI-BH-05 22-Feb-21 22-Mar-21
DKI-ETC-06 DKI-BH-06 22-Feb-21 22-Mar-21
DKI-ETC-07 DKI-BH-07 22-Feb-21 22-Mar-21 KONDISI
VISUAL
DKI-ETC-08 DKI-BH-08 22-Feb-21 22-Mar-21 OK
DKI-ETC-09 DKI-BH-09 22-Feb-21 22-Mar-21
DKI-ETC-10 DKI-BH-10 22-Feb-21 22-Mar-21
KONDISI
VISUAL
OK

22-Feb-21 22-Mar-21
22-Feb-21 22-Mar-21
22-Feb-21 22-Mar-21
INSPECTION TOOLS AND PPE RESULT FEBRUARI 202

PROJECT : SEA SWIFT/ H-361


DATE : 9-Feb-21
COMPANY : PT. KBB
INSPECTION BY : ROBERT BUTAR-BUTAR
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 KBB/WC/01 KBB/GH/01 KBB/PG/01 KBB/PC/01
2 KBB/WC/02 KBB/GH/02 KBB/PG/02 KBB/PC/02
3 KBB/WC/03 KBB/GH/03 KBB/PG/03 KBB/PC/03
4 KBB/WC/04 KBB/GH/04 KBB/PG/04 KBB/PC/04
5 KBB/WC/05 KBB/GH/05 KBB/PG/05 KBB/PC/05
6 KBB/WC/06 KBB/GH/06 KBB/PG/06 KBB/PC/06
7 KBB/WC/07 KBB/GH/07 KBB/PG/07 KBB/PC/07
8 KBB/WC/08 KBB/GH/08 KBB/PG/08 KBB/PC/08
9 KBB/WC/09 KBB/PG/09 KBB/PC/09
10 KBB/WC/10 KBB/PG/10 KBB/PC/10
11 KBB/WC/11 KBB/PG/11 KBB/PC/11
12 KBB/WC/12 KBB/PG/12
13 KBB/WC/13 KBB/PG/13
14 KBB/WC/14 KBB/PG/14
15 KBB/WC/15 KBB/PG/15
16 KBB/WC/16 KBB/PG/16
17 KBB/WC/17 KBB/PG/17
18 KBB/WC/18 KBB/PG/18
19 KBB/WC/19 KBB/PG/19
20 KBB/WC/20 KBB/PG/20
21 KBB/WC/21 KBB/PG/21
22 KBB/WC/22 KBB/PG/22
23 KBB/WC/23 KBB/PG/23
24 KBB/WC/24 KBB/PG/24

INSPECTION TOOLS AND PPE RESULT MARCH 2021

PROJECT : SEA SWIFT/ H-361


DATE : 9-Mar-21
COMPANY : PT. KBB
INSPECTION BY : ZAINUDDIN
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - KBB/GH/01 KBB/PG/01 KBB/CT/01 KBB/PC/01 KBB/LC/01
2 - KBB/GH/02 KBB/PG/02 KBB/CT/02 KBB/PC/02 KBB/LC/02
3 - KBB/GH/03 KBB/PG/03 KBB/CT/03 KBB/PC/03 KBB/LC/03
4 - KBB/GH/04 KBB/PG/04 KBB/CT/04 KBB/PC/04 KBB/LC/04
5 - KBB/GH/05 KBB/PG/05 KBB/CT/05 KBB/PC/05 KBB/LC/05
6 - KBB/GH/06 KBB/PG/06 KBB/CT/06 KBB/PC/06 KBB/LC/06
7 - KBB/GH/07 KBB/PG/07 KBB/CT/07 KBB/PC/07 KBB/LC/07
8 - - KBB/PG/08 - KBB/PC/08 KBB/LC/08
9 - - KBB/PG/09 - KBB/PC/09 KBB/LC/09
10 - - KBB/PG/10 - KBB/PC/10 KBB/LC/10
11 - - KBB/PG/11 - KBB/PC/11 -
12 - - KBB/PG/12 - KBB/PC/12 -
13 - - KBB/PG/13 - KBB/PC/13 -
RESULT FEBRUARI 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21

E RESULT MARCH 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
- - 9-Mar-21 8-Apr-21
INSPECTION TOOLS AND PPE RESULT JANUARY 2019

PROJECT #REF!
DATE 11-Jan-19
COMPANY PT. MSA
INSPECTION BY :ALOYSIUS

WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT EXPIRE


No
CABLE HOSE GRINDERS TORCH CABLE CABLE HARNES DATE DATE
1 W.01 H.01 G.01 K.01 11-Jan-19 11-Feb-19
2 W.02 11-Jan-19 11-Feb-19

Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -
diberikan logo atau sticker inspeksi…!!!

INSPECTION TOOLS AND PPE RESULT FEBRUARI 2019

PROJECT #REF!
DATE
COMPANY
INSPECTION BY :

WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT EXPIRE


No
REMARKS

REMARKS
INSPECTION TOOLS AND PPE RESUL

Date 3/1/2021
Project H-368-369
Inpected RIKO WILSON P.
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE

1 RSA.WC.01 RSA.GH.01 RSA.PG.01 - RSA-PC-01


2 RSA.WC.02 RSA.GH.02 RSA.PG.02 - RSA-PC-02
3 RSA.WC.03 RSA.GH.03 RSA.PG.03 - RSA-PC-03
4 RSA.WC.04 RSA.GH.04 RSA.PG.04 - RSA-PC-04
5 RSA.WC.05 RSA.GH.05 RSA.PG.05 - RSA-PC-05
6 RSA.WC.06 RSA.GH.06 RSA.PG.06 - RSA-PC-06
7 RSA.WC.07 RSA.GH.07 RSA.PG.07 - RSA-PC-07
8 RSA.WC.08 RSA.GH.08 RSA.PG.08 - RSA-PC-08
9 RSA.WC.09 RSA.GH.09 - - RSA-PC-09
10 RSA.WC.10 RSA.GH.10 - - -
11 RSA.WC.11 - - - -
12 RSA.WC.12 - - - -
13 RSA.WC.13 - - - -
14 RSA.WC.14 - - - -
15 RSA.WC.15 - - - -
16 RSA.WC.16 - - - -
17 RSA.WC.17 - - - -
18 RSA.WC.18 - - - -
19 RSA.WC.19 - - - -
20 RSA.WC.20 - - - -
21 RSA.WC.21 - - - -
22 RSA.WC.22 - - - -
23 RSA.WC.23 - - - -
24 RSA.WC.24 - - - -
25 RSA.WC.25 - - - -
26 RSA.WC.26 - - - -
27 RSA.WC.27 - - - -
28 RSA.WC.28 - - - -

Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, d
diberikan logo atau sticker inspeksi…!!!

RECORD APRIL 2021

INSPECTION TOOLS AND PPE RESU

PROJECT : H-368
DATE : 19-Apr-2021
COMPANY : PT. RSA
INSPECTION BY : Robert VM Butarbutar
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 RSA-WC-01 RSA-GH-01 RSA-PG-01 RSA-GH-01 RSA-PC-01
2 RSA-WC-02 RSA-GH-02 RSA-PG-02 RSA-GH-02 RSA-PC-02
3 RSA-WC-03 RSA-GH-03 RSA-PG-03 RSA-GH-03 RSA-PC-03
4 RSA-WC-04 RSA-GH-04 RSA-PG-04 RSA-GH-04
5 RSA-WC-05 RSA-GH-05 RSA-PG-05 RSA-GH-05

INSPECTION TOOLS AND PPE RE

PROJECT : H-369
DATE : 19-Apr-2021
COMPANY : PT. RSA
INSPECTION BY : Robert VM Butarbutar
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 RSA-WC-01 RSA-GH-01 RSA-PG-01 RSA-GH-01 RSA-PC-01
2 RSA-WC-02 RSA-GH-02 RSA-PG-02 RSA-GH-02 RSA-PC-02
3 RSA-WC-03 RSA-GH-03 RSA-PG-03 RSA-GH-03 RSA-PC-03
4 RSA-WC-04 RSA-GH-04 RSA-PG-04 RSA-GH-04 RSA-PC-04
5 RSA-WC-05 RSA-GH-05 RSA-PG-05 RSA-GH-05 RSA-PC-05
6 RSA-WC-06 RSA-GH-06 RSA-PG-06 RSA-GH-06 RSA-PC-06
7 RSA-WC-07 RSA-GH-07 - RSA-GH-07 RSA-PC-07
8 RSA-WC-08 RSA-GH-08 - RSA-GH-08 RSA-PC-08
9 RSA-WC-09 RSA-GH-09 - RSA-GH-09 RSA-PC-09
10 RSA-WC-10 RSA-GH-10 - RSA-GH-10 RSA-PC-10
11 RSA-WC-11 RSA-GH-11 - RSA-GH-11 -
12 RSA-WC-12 RSA-GH-12 - RSA-GH-12 -
13 RSA-WC-13 RSA-GH-13 - RSA-GH-13 -
14 RSA-WC-14 RSA-GH-14 - RSA-GH-14 -
15 RSA-WC-15 RSA-GH-15 - RSA-GH-15 -
16 RSA-WC-16 RSA-GH-16 - RSA-GH-16 -
17 RSA-WC-17 RSA-GH-17 - RSA-GH-17 -
18 RSA-WC-18 RSA-GH-18 - RSA-GH-18 -
19 RSA-WC-19 RSA-GH-19 - RSA-GH-19 -
20 RSA-WC-20 RSA-GH-20 - RSA-GH-20 -
21 RSA-WC-21 RSA-GH-21 - - -
22 RSA-WC-22 - - - -
23 RSA-WC-23 - - - -
24 RSA-WC-24 - - - -
25 RSA-WC-25 - - - -
26 RSA-WC-26 - - - -
27 RSA-WC-27 - - - -
28 RSA-WC-28 - - - -
29 RSA-WC-29 - - - -
30 RSA-WC-30 - - - -
31 RSA-WC-31 - - - -
32 RSA-WC-32 - - - -
33 RSA-WC-33 - - - -
34 RSA-WC-34 - - - -
35 RSA-WC-35 - - - -
36 RSA-WC-36 - - - -
37 RSA-WC-37 - - - -
38 RSA-WC-38 - - - -
39 RSA-WC-39 - - - -
40 RSA-WC-40 - - - -
41 RSA-WC-41 - - - -
42 RSA-WC-42 - - - -

RECORD MAY 2021

INSPECTION TOOLS AND PPE RESU

PROJECT : H-368
DATE : 25-May-2021
COMPANY : PT. RSA
INSPECTION BY : Riko Wilson
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 RSA-WC-01 - RSA-PG-01 - RSA-PC-01
2 RSA-WC-02 - RSA-PG-02 - RSA-PC-02
3 RSA-WC-03 - RSA-PG-03 - RSA-PC-03
4 RSA-WC-04 - RSA-PG-04 - RSA-PC-04
5 RSA-WC-05 - RSA-PG-05 - RSA-PC-05
6 RSA-WC-06 - RSA-PG-06 - RSA-PC-06
7 RSA-WC-07 - RSA-PG-07 - RSA-PC-07
8 RSA-WC-08 - RSA-PG-08 - RSA-PC-08
9 RSA-WC-09 - RSA-PG-09 - RSA-PC-09
10 RSA-WC-10 - - - -
11 RSA-WC-11 - - - -
12 RSA-WC-12 - - - -
13 RSA-WC-13 - - - -
14 RSA-WC-14 - - - -
LS AND PPE RESULT MARCH 2021

LAMP electric BODY INSPECT EXPIRE


REMARKS
CABLE panel HARNES DATE DATE

RSA.LC.01 - - 1-Mar-21 1-Apr-21


RSA.LC.02 - - 1-Mar-21 1-Apr-21
RSA.LC.03 - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21 Kondisi OK
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21
- - - 1-Mar-21 1-Apr-21

oleh HSE Personil PT. BA, dan kemudian yang sudah -

ORD APRIL 2021

OLS AND PPE RESULT APRIL 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
RSA-LC-01 - - 19-Apr-21 19-May-21
RSA-LC-02 - - 19-Apr-21 19-May-21
RSA-LC-03 - - 19-Apr-21 19-May-21 OK
RSA-LC-04 - - 19-Apr-21 19-May-21
RSA-LC-05 - - 19-Apr-21 19-May-21

TOOLS AND PPE RESULT APRIL 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
RSA-LC-01 - RSA-FBH-01 19-Apr-21 19-May-21
RSA-LC-02 - RSA-FBH-02 19-Apr-21 19-May-21
SCK.LC.03 - RSA-FBH-03 19-Apr-21 19-May-21
SCK.LC.04 - RSA-FBH-04 19-Apr-21 19-May-21
SCK.LC.05 - RSA-FBH-05 19-Apr-21 19-May-21
SCK.LC.06 - RSA-FBH-06 19-Apr-21 19-May-21
SCK.LC.07 - - 19-Apr-21 19-May-21
SCK.LC.08 - - 19-Apr-21 19-May-21
SCK.LC.09 - - 19-Apr-21 19-May-21
SCK.LC.10 - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
OK
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21
- - - 19-Apr-21 19-May-21

ORD MAY 2021

OLS AND PPE RESULT MAY 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
RSA-LC-01 - - 25-May-21 25-Jun-21
RSA-LC-02 - - 25-May-21 25-Jun-21
RSA-LC-03 - - 25-May-21 25-Jun-21
RSA-LC-04 - - 25-May-21 25-Jun-21

KONDISI
VISUAL OK
RSA-LC-05 - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21 KONDISI
- - - 25-May-21 25-Jun-21 VISUAL OK
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
- - - 25-May-21 25-Jun-21
INSPECTION TOOLS AND PPE RESULT JA

PROJECT : PROJECT REPAIR


DATE : 15-Jan-21
COMPANY : PT. YEO MARINE
INSPECTION BY : ROBERT BUTAR-BUTAR
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 WC-YMI-01 GS-YMI-01 YMI-PG-01 CT-YMI-01
2 WC-YMI-02 GS-YMI-02 YMI-PG-02
3 YMI-PG-03

INSPECTION TOOLS AND PPE RESULT FEB

PROJECT : PROJECT REPAIR


DATE : 16-Feb-21
COMPANY : PT. YEO MARINE
INSPECTION BY : RIO
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 WC-YMI-01 GS-YMI-01 YMI-PG-01 CT-YMI-01
2 WC-YMI-02 GS-YMI-02 YMI-PG-02 CT-YMI-02
3 YMI-PG-03

INSPECTION TOOLS AND PPE RESULT M

PROJECT : PROJECT REPAIR


DATE : 16-Mar-21
COMPANY : PT. YEO MARINE
INSPECTION BY : ALOISIUS WANGGE
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 WC-YMI-01 GS-YMI-01 YMI-PG-01 CT-YMI-01
2 WC-YMI-02 GS-YMI-02 YMI-PG-02 CT-YMI-02
3 WC-YMI-03 - YMI-PG-03 -
4 WC-YMI-04 - - -

RECORD APRIL 2021


INSPECTION TOOLS AND PPE

PROJECT : Bequelee Bay


DATE : 12-Apr-21
COMPANY : PT. YEO MARINE
INSPECTION BY : Mukhlis
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 YMI-WC-01 YMI-GH-01 YMI-PG-01 YMI-CT-01
2 YMI-WC-02 YMI-GH-02 YMI-PG-02 YMI-CT-02
3 YMI-WC-03 - YMI-PG-03 -
4 YMI-WC-04 - YMI-PG-04 -
N TOOLS AND PPE RESULT JANUARI 2021

POWER ELECTRICAL LAMP BODY INSPECT


CABLE PANEL CABLE HARNES DATE
PC-YMI-01 YMI/BH/01 15-Jan-21
PC-YMI-02 15-Jan-21
15-Jan-21

N TOOLS AND PPE RESULT FEBRUARI 2021

POWER ELECTRICAL LAMP BODY INSPECT


CABLE PANEL CABLE HARNES DATE
PC-YMI-01 YMI/BH/01 16-Feb-21
PC-YMI-02 YMI/BH/02 16-Feb-21
16-Feb-21

ON TOOLS AND PPE RESULT MARET 2021

POWER ELECTRICAL LAMP BODY INSPECT


CABLE PANEL CABLE HARNES DATE
PC-YMI-01 - YMI/LC/01 YMI/BH/01 16-Mar-21
PC-YMI-02 - YMI/LC/02 YMI/BH/02 16-Mar-21
- - - - 16-Mar-21
- - - - 16-Mar-21

RECORD APRIL 2021


INSPECTION TOOLS AND PPE RESULT APRIL 2021

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
YMI-PC-01 YMI-LC-01 - YMI-BH-01 12-Apr-21
YMI-PC-02 - - YMI-BH-02 12-Apr-21
- - - - 12-Apr-21
- - - - 12-Apr-21
EXPIRE
REMARKS
DATE
15-Feb-21 KONDISI
15-Feb-21 VISUAL
OK
15-Feb-21

EXPIRE
REMARKS
DATE
14-Mar-21 KONDISI
14-Mar-21 VISUAL
OK
14-Mar-21

EXPIRE
REMARKS
DATE
16-Apr-21
16-Apr-21 KONDISI
VISUAL
16-Apr-21 OK
16-Apr-21
EXPIRE
REMARKS
DATE
12-May-21
12-May-21 KONDISI
VISUAL
12-May-21 OK
12-May-21
INSPECTION TOOLS AND PPE RESULT OKTOBER 2020

PROJECT REPAIR AREA


DATE 18-Sep-20
COMPANY PT. NCEI
INSPECTION BY ALOISIUS
WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT
No
CABLE HOSE GRINDERS TORCH CABLE CABLE HARNES DATE
1 NC-WC-01 NC-GH-01 NC-PG-01 NC-PG-01 NC-PC-01 NC-PC-01 NC-BH-01 10-Oct-20
2 NC-WC-02 NC-GH-02 NC-PG-02 NC-PG-02 NC-PC-02 NC-PC-02 NC-BH-02 10-Oct-20
3 NC-WC-03 NC-GH-03 NC-PG-03 NC-PG-03 NC-PC-03 NC-PC-03 NC-BH-03 10-Oct-20
4 NC-WC-04 NC-PG-04 NC-PC-04 NC-PC-04 NC-BH-04 10-Oct-20
5 NC-WC-05 NC-PG-05 NC-PC-05 10-Oct-20
6 NC-WC-06 NC-PG-06 NC-PC-06 10-Oct-20
7 NC-WC-07 10-Oct-20
8 NC-WC-08 10-Oct-20

INSPECTION TOOLS AND PPE RESULT NOVEMBER 2020

PROJECT REPAIR AREA


DATE 17-Dec-20
COMPANY PT. NCEI
INSPECTION BY ISMUNANDAR
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 NC-WC-01 NC-GH-01 NC-PG-01 NC-PG-01 NC-PC-01 NC-PC-01 NC-BH-01
2 NC-WC-02 NC-GH-02 NC-PG-02 NC-PG-02 NC-PC-02 NC-PC-02 NC-BH-02
3 NC-WC-03 NC-GH-03 NC-PG-03 NC-PG-03 NC-PC-03 NC-BH-03
4 NC-WC-04 NC-GH-04 NC-PG-04 NC-PG-04 NC-PC-04 NC-BH-04
5 NC-WC-05 NC-GH-05 NC-PG-05 NC-PG-05 NC-PC-05 NC-BH-05
6 NC-WC-06 NC-GH-06 NC-PG-06 NC-PG-06
7 NC-PG-07
8
R 2020

EXPIRE
REMARKS
DATE
10-Nov-20
10-Nov-20
10-Nov-20
10-Nov-20 KONDISI
10-Nov-20 VISUAL OK
10-Nov-20
10-Nov-20
10-Nov-20

ER 2020

INSPECT EXPIRE
REMARKS
DATE DATE
17-Dec-20 17-Jan-21
17-Dec-20 17-Jan-21
17-Dec-20 17-Jan-21
17-Dec-20 17-Jan-21 KONDISI
VISUAL
17-Dec-20 17-Jan-21 OK
17-Dec-20 17-Jan-21
17-Dec-20 17-Jan-21
17-Dec-20 17-Jan-21
INSPECTION TOOLS AND PPE RESULT FEBRUARI 202

PROJECT SEA SWIFT/ H-361


DATE 16-Feb-21
COMPANY PT. Aulia Arrahman
INSPECTION BY FAHRINALDI

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 WC/01 PG-01 PC-1 LC-01
2 WC/02 PG-02 PC-2 LC-02
3 WC/03 PG-03 PC-3
4 WC/04 PG-04 PC-4
5 WC/05 PG-05 PC-5
6 WC/06 PG-06 PC-6
7 WC/07 PG-07 PC-7
8 WC/08 PG-08 PC-8
9 WC/09 PG-09 PC-9
10 WC/10 PG-10 PC-10
11 WC/11 PG-11 PC-11
12 WC/12 PG-12 PC-12
13 PG-13 PC-13
14 PG-14 PC-14
15 PG-15 PC-15
16 PG-16
17 PG-17
18 PG-18
19 PG-19

RECORD APRIL 2021

INSPECTION TOOLS AND PPE RESULT APRI

PROJECT : SEA SWIFT/ H-361


DATE : 9-Apr-21
COMPANY : PT. Aulia Arrahman
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AR-WC-01 AR-GH-01 AR-PG-01 - AR-PC-01 AR-LC-01
2 AR-WC-02 AR-GH-02 AR-PG-02 - AR-PC-02 AR-LC-02
3 AR-WC-03 AR-GH-03 AR-PG-03 - AR-PC-03 AR-LC-03
4 AR-WC-04 AR-GH-04 AR-PG-04 - AR-PC-04 AR-LC-04
5 AR-WC-05 AR-GH-05 AR-PG-05 - AR-PC-05 AR-LC-05
6 AR-WC-06 AR-GH-06 AR-PG-06 - AR-PC-06 AR-LC-06
7 AR-WC-07 AR-GH-07 AR-PG-07 - AR-PC-07 AR-LC-07
8 AR-WC-08 AR-GH-08 AR-PG-08 - AR-PC-08 AR-LC-08
9 AR-WC-09 AR-GH-09 AR-PG-09 - AR-PC-09 AR-LC-09
10 AR-WC-10 AR-GH-10 AR-PG-10 - AR-PC-10 AR-LC-10
11 AR-WC-11 AR-GH-11 AR-PG-11 - AR-PC-11 AR-LC-11
12 AR-WC-12 AR-GH-12 AR-PG-12 - AR-PC-12 AR-LC-12
13 AR-WC-13 AR-GH-13 AR-PG-13 - AR-PC-13 AR-LC-13

RECORD MAY 2021

INSPECTION TOOLS AND PPE RESULT MAY

PROJECT : SEA SWIFT/ H-361


DATE : 15-May-21
COMPANY : PT. Aulia Arrahman
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AR-WC-01 AR-GH-01 AR-PG-01 - AR-PC-01 AR-LC-01
2 AR-WC-02 AR-GH-02 AR-PG-02 - AR-PC-02 AR-LC-02
3 AR-WC-03 AR-GH-03 AR-PG-03 - AR-PC-03 AR-LC-03
4 AR-WC-04 AR-GH-04 AR-PG-04 - AR-PC-04 AR-LC-04
5 AR-WC-05 AR-GH-05 AR-PG-05 - AR-PC-05 AR-LC-05
6 AR-WC-06 AR-GH-06 AR-PG-06 - AR-PC-06 AR-LC-06
7 AR-WC-07 AR-GH-07 AR-PG-07 - AR-PC-07 AR-LC-07
8 AR-WC-08 AR-GH-08 AR-PG-08 - AR-PC-08 AR-LC-08
9 AR-WC-09 AR-GH-09 AR-PG-09 - AR-PC-09 AR-LC-09
10 AR-WC-10 AR-GH-10 AR-PG-10 - AR-PC-10 AR-LC-10
11 AR-WC-11 AR-GH-11 AR-PG-11 - AR-PC-11 AR-LC-11
12 AR-WC-12 AR-GH-12 AR-PG-12 - AR-PC-12 AR-LC-12
13 AR-WC-13 AR-GH-13 AR-PG-13 - AR-PC-13 AR-LC-13
14 AR-WC-14 AR-GH-14 AR-PG-14 - AR-PC-14 AR-LC-14
15 AR-WC-15 AR-GH-15 AR-PG-15 - AR-PC-15 AR-LC-15
16 AR-WC-16 AR-GH-16 AR-PG-16 - AR-PC-16 AR-LC-16
17 AR-WC-17 AR-GH-17 AR-PG-17 - AR-PC-17 AR-LC-17
18 AR-WC-18 AR-GH-18 AR-PG-18 - AR-PC-18 AR-LC-18
19 AR-WC-19 AR-GH-19 AR-PG-19 - AR-PC-19 AR-LC-19
20 AR-WC-20 AR-GH-20 AR-PG-20 - AR-PC-20 AR-LC-20
21 AR-WC-21 - AR-PG-21 - AR-PC-21 AR-LC-21
22 AR-WC-22 - AR-PG-22 - AR-PC-22 AR-LC-22
23 AR-WC-23 - AR-PG-23 - AR-PC-23 AR-LC-23
24 AR-WC-24 - AR-PG-24 - AR-PC-24 AR-LC-24
25 AR-WC-25 - AR-PG-25 - AR-PC-25 AR-LC-25
26 AR-WC-26 - AR-PG-26 - AR-PC-26 AR-LC-26
27 AR-WC-27 - AR-BG-01 - AR-PC-27 AR-LC-27
28 AR-WC-28 - AR-BG-02 - AR-PC-28 AR-LC-28
29 AR-WC-29 - AR-BG-03 - AR-PC-29 AR-LC-29
30 AR-WC-30 - AR-BG-04 - AR-PC-30 AR-LC-30
31 AR-WC-31 - AR-BG-05 - AR-PC-31 -
32 AR-WC-32 - AR-BG-06 - AR-PC-32 -
33 AR-WC-33 - AR-BG-07 - AR-PC-33 -
34 AR-WC-34 - AR-BG-08 - AR-PC-34 -
35 AR-WC-35 - AR-BG-09 - AR-PC-35 -
36 AR-WC-36 - AR-BG-10 - AR-PC-36 -
37 - - AR-BG-11 - AR-PC-37 -
38 - - AR-BG-12 - AR-PC-38 -
39 - - AR-BG-13 - AR-PC-39 -
40 - - AR-BG-14 - AR-PC-40 -
41 - - AR-BG-15 - AR-PC-41 -
42 - - AR-BG-16 - AR-PC-42 -
43 - - AR-BG-17 - AR-PC-43 -
44 - - AR-BG-18 - AR-PC-44 -
45 - - AR-BG-19 - AR-PC-45 -
46 - - AR-BG-20 - - -

RECORD JUNE 2021

INSPECTION TOOLS AND PPE RESULT JUNE

PROJECT : SEA SWIFT/ H-361


DATE : 23-Jun-21
COMPANY : PT. Aulia Arrahman
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AR-WC-01 AR-GH-01 AR-PG-01 - AR-PC-01 AR-LC-01
2 AR-WC-02 AR-GH-02 AR-PG-02 - AR-PC-02 AR-LC-02
3 AR-WC-03 AR-GH-03 AR-PG-03 - AR-PC-03 AR-LC-03
4 AR-WC-04 AR-GH-04 AR-PG-04 - AR-PC-04 AR-LC-04
5 AR-WC-05 AR-GH-05 AR-PG-05 - AR-PC-05 AR-LC-05
6 AR-WC-06 AR-GH-06 AR-PG-06 - AR-PC-06 AR-LC-06
7 AR-WC-07 AR-GH-07 AR-PG-07 - AR-PC-07 AR-LC-07
8 AR-WC-08 AR-GH-08 AR-PG-08 - AR-PC-08 AR-LC-08
9 AR-WC-09 AR-GH-09 AR-PG-09 - AR-PC-09 AR-LC-09
10 AR-WC-10 AR-GH-10 AR-PG-10 - AR-PC-10 AR-LC-10
11 AR-WC-11 AR-GH-11 AR-PG-11 - AR-PC-11 AR-LC-11
12 AR-WC-12 AR-GH-12 AR-PG-12 - AR-PC-12 AR-LC-12
13 AR-WC-13 AR-GH-13 AR-PG-13 - AR-PC-13 AR-LC-13
14 AR-WC-14 AR-GH-14 AR-PG-14 - AR-PC-14 AR-LC-14
15 AR-WC-15 AR-GH-15 AR-PG-15 - AR-PC-15 AR-LC-15
16 AR-WC-16 AR-GH-16 AR-PG-16 - AR-PC-16 AR-LC-16
17 AR-WC-17 AR-GH-17 AR-PG-17 - AR-PC-17 AR-LC-17
18 AR-WC-18 AR-GH-18 AR-PG-18 - AR-PC-18 AR-LC-18
19 AR-WC-19 AR-GH-19 AR-PG-19 - AR-PC-19 AR-LC-19
20 AR-WC-20 AR-GH-20 AR-PG-20 - AR-PC-20 AR-LC-20
21 AR-WC-21 AR-GH-21 AR-PG-21 - AR-PC-21 AR-LC-21
22 AR-WC-22 AR-GH-22 AR-PG-22 - AR-PC-22 AR-LC-22
23 AR-WC-23 AR-GH-23 AR-PG-23 - AR-PC-23 AR-LC-23
24 AR-WC-24 AR-GH-24 AR-PG-24 - AR-PC-24 AR-LC-24
25 AR-WC-25 AR-GH-25 AR-PG-25 - AR-PC-25 AR-LC-25
26 AR-WC-26 AR-GH-26 AR-PG-26 - AR-PC-26 AR-LC-26
27 AR-WC-27 - AR-PG-27 - AR-PC-27 AR-LC-27
28 AR-WC-28 - AR-BG-01 - AR-PC-28 AR-LC-28
29 AR-WC-29 - AR-BG-02 - AR-PC-29 AR-LC-29
30 AR-WC-30 - AR-BG-03 - AR-PC-30 AR-LC-30
31 AR-WC-31 - AR-BG-04 - AR-PC-31 AR-LC-31
32 AR-WC-32 - AR-BG-05 - AR-PC-32 AR-LC-32
33 AR-WC-33 - AR-BG-06 - AR-PC-33 AR-LC-33
34 AR-WC-34 - AR-BG-07 - AR-PC-34 AR-LC-34
35 AR-WC-35 - AR-BG-08 - AR-PC-35 AR-LC-35
36 AR-WC-36 - AR-BG-09 - AR-PC-36 AR-LC-36
37 AR-WC-37 - AR-BG-10 - AR-PC-37 AR-LC-37
38 AR-WC-38 - AR-BG-11 - AR-PC-38 AR-LC-38
39 AR-WC-39 - AR-BG-12 - AR-PC-39 AR-LC-39
40 AR-WC-40 - AR-BG-13 - AR-PC-40 AR-LC-40
41 AR-WC-41 - AR-BG-14 - AR-PC-41 -
42 - - AR-BG-15 - AR-PC-42 -
43 - - AR-BG-16 - AR-PC-43 -
44 - - AR-BG-17 - AR-PC-44 -
45 - - AR-BG-18 - AR-PC-45 -
46 - - AR-BG-19 - - -
47 - - AR-BG-20 - - -
48 - - AR-BG-21 - - -
49 - - AR-BG-22 - - -
50 - - AR-BG-23 - - -
51 - - AR-BG-24 - - -
52 - - AR-BG-25 - - -
RECORD JULY 2021

INSPECTION TOOLS AND PPE RESULT JULY

PROJECT : SEA SWIFT/ H-361


DATE : 22-Jul-21
COMPANY : PT. Aulia Arrahman
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AR-WC-01 AR-GH-01 AR-PG-01 - AR-PC-01 AR-LC-01
2 AR-WC-02 AR-GH-02 AR-PG-02 - AR-PC-02 AR-LC-02
3 AR-WC-03 AR-GH-03 AR-PG-03 - AR-PC-03 AR-LC-03
4 AR-WC-04 AR-GH-04 AR-PG-04 - AR-PC-04 AR-LC-04
5 AR-WC-05 AR-GH-05 AR-PG-05 - AR-PC-05 AR-LC-05
6 AR-WC-06 AR-GH-06 AR-PG-06 - AR-PC-06 AR-LC-06
7 AR-WC-07 AR-GH-07 AR-PG-07 - AR-PC-07 AR-LC-07
8 AR-WC-08 AR-GH-08 AR-PG-08 - AR-PC-08 AR-LC-08
9 AR-WC-09 AR-GH-09 AR-PG-09 - AR-PC-09 AR-LC-09
10 AR-WC-10 AR-GH-10 AR-PG-10 - AR-PC-10 AR-LC-10
11 AR-WC-11 AR-GH-11 AR-PG-11 - AR-PC-11 AR-LC-11
12 AR-WC-12 AR-GH-12 AR-PG-12 - AR-PC-12 AR-LC-12
13 AR-WC-13 AR-GH-13 AR-PG-13 - AR-PC-13 AR-LC-13
14 AR-WC-14 AR-GH-14 AR-PG-14 - AR-PC-14 AR-LC-14
15 AR-WC-15 AR-GH-15 AR-PG-15 - AR-PC-15 AR-LC-15
16 AR-WC-16 AR-PG-16 - AR-PC-16 AR-LC-16
17 AR-WC-17 AR-PG-17 - AR-PC-17 AR-LC-17
18 AR-WC-18 AR-PG-18 - AR-PC-18 AR-LC-18
19 AR-WC-19 AR-PG-19 - AR-PC-19 AR-LC-19
20 AR-WC-20 AR-PG-20 - AR-PC-20 AR-LC-20
21 AR-WC-21 AR-BG-01 - AR-PC-21 AR-LC-21
22 AR-WC-22 AR-BG-02 - AR-PC-22 AR-LC-22
23 AR-WC-23 AR-BG-03 - AR-PC-23 AR-LC-23
24 AR-WC-24 AR-BG-04 - AR-PC-24 AR-LC-24
25 AR-WC-25 AR-BG-05 - AR-PC-25 AR-LC-25
26 AR-WC-26 AR-BG-06 - AR-PC-26 AR-LC-26
27 AR-WC-27 - AR-BG-07 - AR-PC-27 AR-LC-27
28 AR-WC-28 - AR-BG-08 - AR-PC-28 AR-LC-28
29 AR-WC-29 - AR-BG-09 - AR-PC-29 AR-LC-29
30 AR-WC-30 - AR-BG-10 - AR-PC-30 AR-LC-30
31 - - AR-BG-11 - AR-PC-31 AR-LC-31
32 - - AR-BG-12 - AR-PC-32 -
33 - - AR-BG-13 - AR-PC-33 -
34 - - AR-BG-14 - AR-PC-34 -
35 - - AR-BG-15 - AR-PC-35 -
36 - - AR-BG-16 - - -
37 - - AR-BG-17 - - -
38 - - AR-BG-18 - - -
39 - - AR-BG-19 - - -
40 - - AR-BG-20 - - -

RECORD AUGUST 2021

INSPECTION TOOLS AND PPE RESULT AUGU

PROJECT : SEA SWIFT/ H-361


DATE : 22-Aug-21
COMPANY : PT. Aulia Arrahman
INSPECTION BY : Fahrinaldi

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AR-WC-01 AR-GH-01 AR-PG-01 - AR-PC-01 AR-LC-01
2 AR-WC-02 AR-GH-02 AR-PG-02 - AR-PC-02 AR-LC-02
3 AR-WC-03 AR-GH-03 AR-PG-03 - AR-PC-03 AR-LC-03
4 AR-WC-04 AR-GH-04 AR-PG-04 - AR-PC-04 AR-LC-04
5 AR-WC-05 AR-GH-05 AR-PG-05 - AR-PC-05 AR-LC-05
6 AR-WC-06 AR-GH-06 AR-PG-06 - AR-PC-06 AR-LC-06
7 AR-WC-07 AR-GH-07 AR-PG-07 - AR-PC-07 AR-LC-07
8 AR-WC-08 AR-GH-08 AR-PG-08 - AR-PC-08 AR-LC-08
9 AR-WC-09 AR-GH-09 AR-PG-09 - AR-PC-09 AR-LC-09
10 AR-WC-10 AR-GH-10 AR-BG-01 - AR-PC-10 AR-LC-10
11 AR-WC-11 - AR-BG-02 - AR-PC-11 AR-LC-11
12 AR-WC-12 - AR-BG-03 - AR-PC-12 AR-LC-12
13 AR-WC-13 - AR-BG-04 - AR-PC-13 AR-LC-13
14 AR-WC-14 - AR-BG-05 - AR-PC-14 AR-LC-14
15 AR-WC-15 - AR-BG-06 - AR-PC-15 AR-LC-15
16 AR-WC-16 - AR-BG-07 - AR-PC-16 -
17 AR-WC-17 - AR-BG-08 - AR-PC-17 -
18 AR-WC-18 - - - AR-PC-18 -
19 AR-WC-19 - - - AR-PC-19 -
20 AR-WC-20 - - - AR-PC-20 -
21 AR-WC-21 - - - - -
22 AR-WC-22 - - - - -
23 AR-WC-23 - - - - -
24 AR-WC-24 - - - - -
SULT FEBRUARI 2020

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
16-Feb-21 15-Mar-21
16-Feb-21 15-Mar-21
16-Feb-21 15-Mar-21
16-Feb-21 15-Mar-21

VISUAL
KONDISI OK

21

ND PPE RESULT APRIL 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21

VISUAL
KONDISI OK
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21 VISUAL
KONDISI OK
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21
- 9-Apr-21 9-May-21

ND PPE RESULT MAY 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
VISUAL
KONDISI OK
- 15-May-21 15-Jun-21 VISUAL
- 15-May-21 15-Jun-21 KONDISI OK
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21
- 15-May-21 15-Jun-21

ND PPE RESULT JUNE 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21 VISUAL
- 23-Jun-21 23-Jul-21 KONDISI OK
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
- 23-Jun-21 23-Jul-21
1

ND PPE RESULT JULY 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21 VISUAL
- 22-Jul-21 22-Aug-21 KONDISI OK
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21
- 22-Jul-21 22-Aug-21

021

D PPE RESULT AUGUST 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21 VISUAL
- 22-Aug-21 22-Sep-21 KONDISI OK
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
- 22-Aug-21 22-Sep-21
PROJECT : Repai Area
DATE 26-Mar-21
COMPANY : PT. Tri Putra Indopersada
INSPECTION BY : Jenri Marbun
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 TIP/WC/01 TIP/GH/01 TIP/PG/01 TIP/CT/01 TIP/PC/01

RECORD MAY 2021

INSPECTION TOOLS AND P

PROJECT : NA 201 & NAP 202


DATE 24-May-21
COMPANY : PT. TIP
INSPECTION BY : Ranto Situmorang
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 TIP-WC-01 TIP-GH-01 TIP-PG-01 - TIP-PC-01
2 TIP-WC-02 TIP-GH-02 TIP-PG-02 - TIP-PC-02
3 TIP-WC-03 - - - -

RECORD JUNE 2021

INSPECTION TOOLS AND P

PROJECT : NAP 201 & NAP 202


DATE 29-Jun-21
COMPANY : PT. TIP
INSPECTION BY : Remualdo
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 TIP-WC-01 TIP-GH-01 TIP-PG-01 - TIP-PC-01
2 TIP-WC-02 TIP-GH-02 TIP-PG-02 - TIP-PC-02
3 TIP-WC-03 - TIP-PG-03 - TIP-PC-03
4 TIP-WC-04 - TIP-PG-04 - TIP-PC-04
5 TIP-WC-05 - - - -
6 TIP-WC-06 - - - -
7 TIP-WC-07 - - - -
8 TIP-WC-08 - - - -
9 TIP-WC-09 - - - -
10 TIP-WC-10 - - - -

RECORD JULY 2021


INSPECTION TOOLS AND P

PROJECT : NAP 201 & NAP 202


DATE 27-Jul-21
COMPANY : PT. TIP
INSPECTION BY : Wendra
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 TIP-WC-01 TIP-GH-01 TIP-PG-01 -
2 TIP-WC-02 TIP-GH-02 TIP-PG-02 -
3 TIP-WC-03 TIP-GH-03 TIP-PG-03 -
4 TIP-WC-04 TIP-GH-04 TIP-PG-04 -
5 TIP-WC-05 TIP-GH-05 - - -
6 TIP-WC-06 TIP-GH-06 - - -
7 TIP-WC-07 - - - -
8 TIP-WC-08 - - - -
9 TIP-WC-09 - - - -
10 TIP-WC-10 - - - -
11 TIP-WC-11 - - - -
12 TIP-WC-12 - - - -
13 TIP-WC-13 - - - -
14 TIP-WC-14 - - - -
15 TIP-WC-15 - - - -
16 TIP-WC-16 - - - -
17 TIP-WC-17 - - - -
18 TIP-WC-18 - - - -
19 TIP-WC-19 - - - -
20 TIP-WC-20 - - - -
21 TIP-WC-21 - - - -
22 TIP-WC-22 - - - -
23 TIP-WC-23 - - - -
24 TIP-WC-24 - - - -

RECORD AUGUST 2021

INSPECTION TOOLS AND PPE

PROJECT : NAP 201 & NAP 202


DATE 31-Aug-21
COMPANY : PT. TIP
INSPECTION BY : Robert VM Butar Butar
WELDING GAS PORTABLE CUTING POWER
No
No
CABLE HOSE GRINDERS TORCH CABLE
1 TIP-WC-01 TIP-GH-01 TIP-PG-01 - TIP-PC-01
2 TIP-WC-02 TIP-GH-02 TIP-PG-02 - TIP-PC-02
3 TIP-WC-03 - - - TIP-PC-03
4 TIP-WC-04 - - - TIP-PC-04
5 TIP-WC-05 - - - TIP-PC-05
6 TIP-WC-06 - - - TIP-PC-06
7 TIP-WC-07 - - - TIP-PC-07
8 TIP-WC-08 - - - TIP-PC-08
9 TIP-WC-09 - - - TIP-PC-09
10 TIP-WC-10 - - - TIP-PC-10
LAMP ELECTRICAL BODY INSPECT EXPIRE
REMARKS
CABLE PANEL HARNES DATE DATE
- - BSU.BH.01 26-Mar-21 26-Apr-21 OK

RECORD MAY 2021

ON TOOLS AND PPE RESULT MAY 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
- - TIP-FBH-01 24-May-21 24-Jun-21 KONDISI
- - TIP-FBH-02 24-May-21 24-Jun-21 VISUAL
- - - 24-May-21 24-Jun-21 OK

RECORD JUNE 2021

ON TOOLS AND PPE RESULT JUNE 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
TIP-LC-01 - TIP-FBH-01 29-Jun-21 29-Jul-21
TIP-LC-02 - TIP-FBH-02 29-Jun-21 29-Jul-21
TIP-LC-03 - TIP-FBH-03 29-Jun-21 29-Jul-21
- - TIP-FBH-04 29-Jun-21 29-Jul-21
- - TIP-FBH-05 29-Jun-21 29-Jul-21 KONDISI
VISUAL
- - - 29-Jun-21 29-Jul-21 OK
- - - 29-Jun-21 29-Jul-21
- - - 29-Jun-21 29-Jul-21
- - - 29-Jun-21 29-Jul-21
- - - 29-Jun-21 29-Jul-21

RECORD JULY 2021


ON TOOLS AND PPE RESULT JULY 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
TIP-LC-01 - TIP-FBH-01 27-Jul-21 27-Aug-21
TIP-LC-02 - TIP-FBH-02 27-Jul-21 27-Aug-21
TIP-LC-03 - TIP-FBH-03 27-Jul-21 27-Aug-21
TIP-LC-04 - TIP-FBH-04 27-Jul-21 27-Aug-21
TIP-LC-05 - TIP-FBH-05 27-Jul-21 27-Aug-21
TIP-LC-06 - TIP-FBH-06 27-Jul-21 27-Aug-21
TIP-LC-07 - TIP-FBH-07 27-Jul-21 27-Aug-21
TIP-LC-08 - TIP-FBH-08 27-Jul-21 27-Aug-21
TIP-LC-09 - TIP-FBH-09 27-Jul-21 27-Aug-21
TIP-LC-10 - TIP-FBH-10 27-Jul-21 27-Aug-21
- - TIP-FBH-11 27-Jul-21 27-Aug-21
- - TIP-FBH-12 27-Jul-21 27-Aug-21 KONDISI
VISUAL
- - TIP-FBH-13 27-Jul-21 27-Aug-21 OK
- - TIP-FBH-14 27-Jul-21 27-Aug-21
- - TIP-FBH-15 27-Jul-21 27-Aug-21
- - TIP-FBH-16 27-Jul-21 27-Aug-21
- - TIP-FBH-17 27-Jul-21 27-Aug-21
- - TIP-FBH-18 27-Jul-21 27-Aug-21
- - TIP-FBH-19 27-Jul-21 27-Aug-21
- - TIP-FBH-20 27-Jul-21 27-Aug-21
- - TIP-FBH-21 27-Jul-21 27-Aug-21
- - TIP-FBH-22 27-Jul-21 27-Aug-21
- - TIP-FBH-23 27-Jul-21 27-Aug-21
- - TIP-FBH-24 27-Jul-21 27-Aug-21

RECORD AUGUST 2021

N TOOLS AND PPE RESULT AUGUST 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL
ELECTRICAL
REMARKS
CABLE PANEL HARNES DATE DATE
TIP-LC-01 - TIP-FBH-01 31-Aug-21 30-Sep-21
TIP-LC-02 - TIP-FBH-02 31-Aug-21 30-Sep-21
TIP-LC-03 - TIP-FBH-03 31-Aug-21 30-Sep-21
TIP-LC-04 - TIP-FBH-04 31-Aug-21 30-Sep-21
TIP-LC-05 - TIP-FBH-05 31-Aug-21 30-Sep-21 KONDISI
VISUAL
TIP-LC-06 - TIP-FBH-06 31-Aug-21 30-Sep-21 OK
TIP-LC-07 - TIP-FBH-07 31-Aug-21 30-Sep-21
TIP-LC-08 - TIP-FBH-08 31-Aug-21 30-Sep-21
TIP-LC-09 - TIP-FBH-09 31-Aug-21 30-Sep-21
TIP-LC-10 - TIP-FBH-10 31-Aug-21 30-Sep-21
INSPECTION TOOLS AND PPE RESULT JANUARI 2021

PROJECT
DATE 19-Jan-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY DONATUS
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 V-WC-01 V-GH-01 V-PG-01 V-PC-01 V-LC-01
2 V-WC-02 V-GH-02 V-PG-02 V-PC-02 V-LC-02
3 V-WC-03 V-GH-03 V-PG-03 V-PC-03 V-LC-03
4 V-WC-04 V-GH-04 V-PG-04 V-PC-04
5 V-WC-05 V-GH-05
6 V-WC-06 V-GH-06
7 V-WC-07 V-GH-07
8 V-WC-08 V-GH-08
9 V-GH-09
10 V-GH-10
11

INSPECTION TOOLS AND PPE RESULT FEBRUARY 2021

PROJECT
DATE 8-Mar-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY DONATUS
WELDING GAS PORTABLE CUTING POWER LAMP BODY INSPECT
No
CABLE HOSE GRINDERS TORCH CABLE CABLE HARNES DATE

DIDN’T INSPECT ( DIDN’T JOINT ON BOARD)


Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. BA, d
diberikan logo atau sticker inspeksi…!!!

INSPECTION TOOLS AND PPE RESULT MARCH 2021

PROJECT H-364 & H-365


DATE 8-Mar-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Zainuddin
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 V-WC-01 V-GH-01 V-PG-01 - V-PC-01 V-LC-01 - -
2 V-WC-02 V-GH-02 V-PG-02 - V-PC-02 V-LC-02 - -
3 V-WC-03 - V-PG-03 - V-PC-03 V-LC-03 - -
4 V-WC-04 - V-PG-04 - V-PC-04 - - -

RECORD APRIL 2021

INSPECTION TOOLS AND PPE RESULT APRIL 2021

PROJECT H-364 & H-365, AT-8 (H-355) & AT-9 (H-356)


DATE 13-Apr-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Donatus Kanis
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 V-WC-01 V-GH-01 V-PG-01 V-CT-01 V-PC-01 V-LC-01 - -
2 V-WC-02 V-GH-02 V-PG-02 V-CT-02 V-PC-02 V-LC-02 - -
3 V-WC-03 - V-PG-03 - V-PC-03 - - -
4 - - V-PG-04 - V-PC-04 - - -

RECORD MAI 2021

INSPECTION TOOLS AND PPE RESULT MAY 2021

PROJECT AT-8 (H-355) & AT-9 (H-356)


DATE 12-May-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Donatus Kanis
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 V-WC-01 V-GH-01 V-PG-01 V-CT-01 V-PC-01 - - -
2 V-WC-02 V-GH-02 V-PG-02 V-CT-02 V-PC-02 - - -
3 - - V-PG-03 - V-PC-03 - - -
4 - - V-PG-04 - V-PC-04 - - -
5 - - - - V-PC-05 - - -
6 - - - - V-PC-06 - - -
7 - - - - V-PC-07 - - -
8 - - - - V-PC-08 - - -
9 - - - - V-PC-09 - - -
10 - - - - V-PC-10 - - -
RECORD JUNE 2021

INSPECTION TOOLS AND PPE RESULT JUNE 2021

PROJECT AT-8 (H-355) & AT-9 (H-356)


DATE 14-Jun-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Donatus Kanis
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 V-WC-01 V-GH-01 V-PG-01 V-CT-01 V-PC-01 V-LC-01 - -
2 V-WC-02 V-GH-02 V-PG-02 V-CT-02 V-PC-02 V-LC-02 - -
3 V-WC-03 - V-PG-03 - V-PC-03 - - -
4 - - V-PG-04 - V-PC-04 - - -
5 - - - - V-PC-05 - - -

RECORD JULY 2021

INSPECTION TOOLS AND PPE RESULT JULY 2021

PROJECT AT-8 (H-355) & AT-9 (H-356)


DATE 12-Jul-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Donatus Kanis
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 - - V-PG-01 - V-PC-01 - - -
2 - - V-PG-02 - V-PC-02 - - -
3 - - V-PG-03 - - - - -

RECORD AUGUST 2021

INSPECTION TOOLS AND PPE RESULT AUGUST 2021

PROJECT AT-8 (H-355) & AT-9 (H-356)


DATE 31-Aug-21
COMPANY PT. VIKING AIRTECH
INSPECTION BY Donatus Kanis
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 - - V-PG-01 - V-PC-01 - - -
2 - - - - V-PC-02 - - -
3 - - - - V-PC-03 - - -
4 - - - - V-PC-04 - - -
2021

INSPECT EXPIRE
REMARKS
DATE DATE
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21 KONDISI
19-Jan-21 19-Feb-21 VISUAL
19-Jan-21 19-Feb-21 OK
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21
19-Jan-21 19-Feb-21

UARY 2021

EXPIRE
REMARKS
DATE

ARD)
oleh HSE Personil PT. BA, dan kemudian yang sudah -

2021

INSPECT EXPIRE
REMARKS
DATE DATE
8-Mar-21 8-Apr-21
8-Mar-21 8-Apr-21 KONDISI
VISUAL
8-Mar-21 8-Apr-21 OK
8-Mar-21 8-Apr-21

ULT APRIL 2021

INSPECT EXPIRE
REMARKS
DATE DATE
12-Apr-21 12-May-21
12-Apr-21 12-May-21 KONDISI
VISUAL
12-Apr-21 12-May-21 OK
12-Apr-21 12-May-21

ULT MAY 2021

INSPECT EXPIRE
REMARKS
DATE DATE
12-May-21 12-Jun-21
12-May-21 12-Jun-21
12-May-21 12-Jun-21
12-May-21 12-Jun-21
12-May-21 12-Jun-21 KONDISI
VISUAL
12-May-21 12-Jun-21 OK
12-May-21 12-Jun-21
12-May-21 12-Jun-21
12-May-21 12-Jun-21
12-May-21 12-Jun-21
ULT JUNE 2021

INSPECT EXPIRE
REMARKS
DATE DATE
14-Jun-21 14-Jul-21
14-Jun-21 14-Jul-21 KONDISI
14-Jun-21 14-Jul-21 VISUAL
14-Jun-21 14-Jul-21 OK
14-Jun-21 14-Jul-21

ULT JULY 2021

INSPECT EXPIRE
REMARKS
DATE DATE
12-Jul-21 12-Aug-21 KONDISI
12-Jul-21 12-Aug-21 VISUAL
12-Jul-21 12-Aug-21 OK

T AUGUST 2021

INSPECT EXPIRE
REMARKS
REMARKS
DATE DATE
30-Aug-21 30-Sep-21
30-Aug-21 30-Sep-21 KONDISI
VISUAL
30-Aug-21 30-Sep-21 OK
30-Aug-21 30-Sep-21
INSPECTION TOOLS AND PPE RESULT JANUA

PROJECT AT8 & AT9


DATE 11-Jan-21
COMPANY PT. SCK
INSPECTION BY ROBERT BUTAR-BUTAR
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK/GH/01 SCK-PG-01 SCK/CT/01 SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK/GH/02 SCK-PG-02 SCK/CT/02 SCK-PC-02 SCK-LC-02
3 SCK-WC-03 SCK/GH/03 SCK-PG-03 SCK/CT/03 SCK-PC-03 SCK-LC-03
4 SCK-WC-04 SCK/GH/04 SCK-PG-04 SCK/CT/04 SCK-PC-04 SCK-LC-04
5 SCK-WC-05 SCK/GH/05 SCK-PG-05 SCK/CT/05 SCK-PC-05 SCK-LC-05
6 SCK-WC-06 SCK/GH/06 SCK-PG-06 SCK/CT/06 SCK-PC-06 SCK-LC-06
7 SCK-WC-07 SCK/GH/07 SCK-PG-07 SCK/CT/07 SCK-PC-07 SCK-LC-07
8 SCK-WC-08 SCK/GH/08 SCK-PG-08 SCK/CT/08 SCK-PC-08 SCK-LC-08
9 SCK-WC-09 SCK-PG-09 SCK-PC-09 SCK-LC-09
10 SCK-WC-10 SCK-PG-10 SCK-PC-10 SCK-LC-10
11 SCK-WC-11 SCK-PG-11 SCK-PC-11 SCK-LC-11
12 SCK-WC-12 SCK-PG-12 SCK-PC-12 SCK-LC-12
13 SCK-WC-13 SCK-PG-13 SCK-PC-13 SCK-LC-13
14 SCK-WC-14 SCK-PG-14 SCK-PC-14 SCK-LC-14
15 SCK-WC-15 SCK-PG-15 SCK-PC-15 SCK-LC-15
16 SCK-WC-16 SCK-PG-16 SCK-PC-16 SCK-LC-16
17 SCK-WC-17 SCK-PG-17 SCK-PC-17 SCK-LC-17
18 SCK-WC-18 SCK-PG-18 SCK-PC-18 SCK-LC-18
19 SCK-WC-19 SCK-PG-19 SCK-PC-19 SCK-LC-19
20 SCK-WC-20 SCK-PG-20 SCK-PC-20 SCK-LC-20
21 SCK-WC-21
22 SCK-WC-22
23 SCK-WC-23
24 SCK-WC-24

INSPECTION TOOLS AND PPE RESULT FEBRUA

PROJECT AT8 & AT9


DATE 9-Feb-21
COMPANY PT. SCK
INSPECTION BY FAHRINALDI
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK/GH/01 SCK-PG-01 SCK/GH/01
2 SCK-WC-02 SCK/GH/02 SCK-PG-02 SCK/GH/02
3 SCK-WC-03 SCK/GH/03 SCK-PG-03 SCK/GH/03
4 SCK-WC-04 SCK/GH/04 SCK-PG-04 SCK/GH/04
5 SCK-WC-05 SCK-PG-05
6 SCK-WC-06 SCK-PG-06
7 SCK-WC-07 SCK-PG-07
8 SCK-WC-08 SCK-PG-08
9 SCK-WC-09 SCK-PG-09
10 SCK-WC-10 SCK-PG-10
11 SCK-WC-11
12 SCK-WC-12

INSPECTION TOOLS AND PPE RESULT FEBRUA

PROJECT AT8 & AT9


DATE 9-Mar-21
COMPANY PT. SCK
INSPECTION BY SERVASIUS S. RINO
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK/GH/01 SCK-PG-01 SCK/GH/01 SCK.PC.01 SCK.LC.01
2 SCK-WC-02 SCK/GH/02 SCK-PG-02 SCK/GH/02 SCK.PC.02 SCK.LC.02
3 SCK-WC-03 SCK/GH/03 SCK-PG-03 SCK/GH/03 SCK.PC.03 SCK.LC.03
4 SCK-WC-04 SCK/GH/04 SCK-PG-04 SCK/GH/04 SCK.PC.04 SCK.LC.04
5 SCK-WC-05 SCK/GH/05 SCK-PG-05 SCK/GH/05 SCK.PC.05 SCK.LC.05
6 SCK-WC-06 - SCK-PG-06 - SCK.PC.06 SCK.LC.06
7 SCK-WC-07 - SCK-PG-07 - SCK.PC.07 SCK.LC.07
8 SCK-WC-08 - SCK-PG-08 - SCK.PC.08 SCK.LC.08
9 SCK-WC-09 - SCK-PG-09 - SCK.PC.09 SCK.LC.09
10 SCK-WC-10 - SCK-PG-10 - SCK.PC.10 SCK.LC.10
11 SCK-WC-11 - SCK-PG-11 - SCK.PC.11 SCK.LC.11
12 SCK-WC-12 - SCK-PG-12 - SCK.PC.12 SCK.LC.12

RECORD APRIL 2021

INSPECTION TOOLS AND PPE RESULT AP

PROJECT : AT-8 (H-355)


DATE : 06-Apr-2021
COMPANY : PT. SCK
INSPECTION BY : Zainuddin & Servasius S. Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 SCK-CT-01 SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 SCK-CT-02 SCK-PC-02 SCK-LC-02
3 SCK-WC-03 SCK-GH-03 SCK-PG-03 SCK-CT-03 SCK-PC-03 SCK-LC-03
4 SCK-WC-04 SCK-GH-04 SCK-PG-04 SCK-CT-04 SCK-PC-04 SCK-LC-04
5 SCK-WC-05 - - - SCK-PC-05 SCK-LC-05
6 SCK-WC-06 - - - - -

RECORD MAY 2021

INSPECTION TOOLS AND PPE RESULT M

PROJECT : AT-8 (H-355)


DATE : 17-May-2021
COMPANY : PT. SCK
INSPECTION BY : Robert VM Butarbutar
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 SCK-CT-01 SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 SCK-CT-02 SCK-PC-02 SCK-LC-02
3 SCK-WC-03 SCK-GH-03 SCK-PG-03 SCK-CT-03 SCK-PC-03 SCK-LC-03
4 SCK-WC-04 - SCK-PG-04 - SCK-PC-04 -
5 - - - - SCK-PC-05 -
6 - - - - - -

RECORD JUN 2021

INSPECTION TOOLS AND PPE RESULT JU

PROJECT : AT-8 (H-355)


DATE : 8-Jun-2021
COMPANY : PT. SCK
INSPECTION BY : Servasius S Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 SCK-CT-01 SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 SCK-CT-02 SCK-PC-02 SCK-LC-02
3 SCK-WC-03 - SCK-PG-03 - SCK-PC-03 SCK-LC-03

RECORD JULY 2021

INSPECTION TOOLS AND PPE RESULT JU

PROJECT : AT-8 (H-355)


DATE : 9-July-2021
COMPANY : PT. SCK
INSPECTION BY : Servasius S Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 SCK-CT-01 SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 SCK-CT-02 SCK-PC-02 SCK-LC-02
3 SCK-WC-03 - SCK-PG-03 - SCK-PC-03 SCK-LC-03

RECORD AUGUST 2021

INSPECTION TOOLS AND PPE RESULT AU

PROJECT : AT-8 (H-355)


DATE : 31-August-2021
COMPANY : PT. SCK
INSPECTION BY : Robert VM Butar Butar
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 - SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 - SCK-PC-02 SCK-LC-02
3 - SCK-GH-03 SCK-PG-03 - SCK-PC-03 SCK-LC-03

RECORD SEPTEMBER 2021

INSPECTION TOOLS AND PPE RESULT SEPT

PROJECT : AT-8 (H-355)


DATE : 21-Sep-21
COMPANY : PT. SCK
INSPECTION BY : Fahrinaldi
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SCK-WC-01 SCK-GH-01 SCK-PG-01 - SCK-PC-01 SCK-LC-01
2 SCK-WC-02 SCK-GH-02 SCK-PG-02 - SCK-PC-02 SCK-LC-02
3 SCK-WC-03 SCK-GH-03 SCK-PG-03 - SCK-PC-03 SCK-LC-03
4 SCK-WC-04 SCK-GH-04 SCK-PG-04 - SCK-PC-04 SCK-LC-04
5 SCK-WC-05 - SCK-PG-05 - SCK-PC-05 SCK-LC-05
6 - - SCK-PG-06 - SCK-PC-06 -
7 - - SCK-PG-07 - - -
8 - - SCK-PG-08 - - -
9 - - SCK-PG-09 - - -
PPE RESULT JANUARI 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
OK
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21
11-Jan-21 11-Feb-21

PE RESULT FEBRUARI 2021


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
SCK-EP-01 9-Feb-21 8-Mar-21
SCK-EP-02 9-Feb-21 8-Mar-21
SCK-EP-03 9-Feb-21 8-Mar-21
SCK-EP-04 9-Feb-21 8-Mar-21
SCK-EP-05 9-Feb-21 8-Mar-21
SCK-EP-06 9-Feb-21 8-Mar-21
OK
SCK-EP-07 9-Feb-21 8-Mar-21
SCK-EP-08 9-Feb-21 8-Mar-21
SCK-EP-09 9-Feb-21 8-Mar-21
SCK-EP-10 9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21
9-Feb-21 8-Mar-21

PE RESULT FEBRUARI 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- SCK.BH.01 9-Mar-21 9-Apr-21
- SCK.BH.02 9-Mar-21 9-Apr-21
- SCK.BH.03 9-Mar-21 9-Apr-21
- SCK.BH.04 9-Mar-21 9-Apr-21
- SCK.BH.05 9-Mar-21 9-Apr-21
- SCK.BH.06 9-Mar-21 9-Apr-21
OK
- SCK.BH.07 9-Mar-21 9-Apr-21
- SCK.BH.08 9-Mar-21 9-Apr-21
- SCK.BH.09 9-Mar-21 9-Apr-21
- SCK.BH.10 9-Mar-21 9-Apr-21
- SCK.BH.11 9-Mar-21 9-Apr-21
- SCK.BH.12 9-Mar-21 9-Apr-21

2021

AND PPE RESULT APRIL 2021


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- - 6-Apr-21 6-May-21
- - 6-Apr-21 6-May-21
- - 6-Apr-21 6-May-21
OK
- - 6-Apr-21 6-May-21
- - 6-Apr-21 6-May-21
- - 6-Apr-21 6-May-21

2021

AND PPE RESULT MAY 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 17-May-21 17-Jun-21
- - 17-May-21 17-Jun-21
- - 17-May-21 17-Jun-21 KONDISI
- - 17-May-21 17-Jun-21 VISUAL OK
- - 17-May-21 17-Jun-21
- - 17-May-21 17-Jun-21

021

AND PPE RESULT JUNE 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 8-Jun-21 8-Jul-21
- - KONDISI
8-Jun-21 8-Jul-21 VISUAL OK
KONDISI
VISUAL OK
- - 8-Jun-21 8-Jul-21

2021 l

AND PPE RESULT JULY 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 9-Jul-21 9-Aug-21
- - KONDISI
9-Jul-21 9-Aug-21 VISUAL OK
- - 9-Jul-21 9-Aug-21

T 2021 l

ND PPE RESULT AUGUST 2021

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 31-Aug-21 30-Sep-21
- - KONDISI
31-Aug-21 30-Sep-21 VISUAL OK
- - 31-Aug-21 30-Sep-21

ER 2021 l

D PPE RESULT SEPTEMBER 2021


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
- - KONDISI
21-Sep-21 21-Oct-21 VISUAL OK
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
- - 21-Sep-21 21-Oct-21
RECORD DECEMBER 2021

INSPECTION TOOLS AND PPE RESULT DE

PROJECT : H-366
DATE : 15-Dec-21
COMPANY : PT. SC
INSPECTION BY : : Aswan Pasande
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 SC-WC-01 SC-GH-01 SC-PG-01 SC-CT-01 SC-PC-01
2 - - - - -
RECORD DECEMBER 2021

OOLS AND PPE RESULT DECEMBER 2021

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
SC-LC-01 - - 15-Dec-21 15-Jan-22
KONDISI VISUAL OK
- - - 15-Dec-21 15-Jan-22
RECORD DECEMBER 2021

INSPECTION TOOLS AND PPE RESULT DECEMBER 202

PROJECT : H-361 (Sea Swift)


DATE : 15-Dec-21
COMPANY : PT. ASHWIN MARINE
INSPECTION BY :: Fahrinaldi
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 ASH-WC-01 ASH-GH-01 ASH-PG-01 ASH-CT-01 ASH-PC-01 ASH-LC-01 -
2 ASH-WC-02 ASH-GH-02 ASH-PG-02 ASH-CT-02 ASH-PC-02 ASH-LC-02 -
3 ASH-WC-03 ASH-GH-03 ASH-PG-03 ASH-CT-03 ASH-PC-03 ASH-LC-03 -
4 ASH-WC-04 ASH-GH-04 ASH-PG-04 ASH-CT-04 ASH-PC-04 ASH-LC-04 -
5 ASH-WC-05 - ASH-PG-05 - ASH-PC-05 ASH-LC-05 -
6 ASH-WC-06 - ASH-PG-06 - ASH-PC-06 ASH-LC-06 -
7 ASH-WC-07 - ASH-PG-07 - ASH-PC-07 ASH-LC-07 -
8 ASH-WC-08 - ASH-PG-08 - - ASH-LC-08 -
SULT DECEMBER 2021

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 15-Dec-21 15-Jan-22
- 15-Dec-21 15-Jan-22
- 15-Dec-21 15-Jan-22
- 15-Dec-21 15-Jan-22 KONDISI
VISUAL
- 15-Dec-21 15-Jan-22 OK
- 15-Dec-21 15-Jan-22
- 15-Dec-21 15-Jan-22
- 15-Dec-21 15-Jan-22
RECORD JUNE 2022

INSPECTION TOOLS AND PPE RESULT JUNE 2022

PROJECT : Repair Project


DATE : 26-Apr-2022
COMPANY : PT. HALINISI KUSUMA
INSPECTION BY :: Mahmudin
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 HK-WC-01 HK-GH-01 HK-PG-01 HK-CT-01 HK-PC-01 HK-LC-01 -
2 - HK-GH-02 HK-PG-02 - - HK-LC-02 -
3 - - - - - - -
4 - - - - - - -
5 - - - - - - -
E RESULT JUNE 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
HK-FBH-01 24-May-22 24-Jun-22
- 24-May-22 24-Jun-22 KONDISI
- 24-May-22 24-Jun-22 VISUAL
- 24-May-22 24-Jun-22 OK
- 24-May-22 24-Jun-22
RECORD JUNE 2022

INSPECTION TOOLS AND PPE RESULT JUNE 2

PROJECT : Repair Project


DATE : 29-Apr-22
COMPANY : PT. TITAN JAYA
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - - - - -
2 - - - - - -
3 - - - - - -
4 - - - - - -
NE 2022

ND PPE RESULT JUNE 2022

Electrical BODY INSPECT EXPIRE


REMARKS
Panel HARNES DATE DATE
TJ-EP-01 - 29-Apr-22 29-May-22
TJ-EP-02 - 29-Apr-22 29-May-22 KONDISI
TJ-EP-03 - 29-Apr-22 29-May-22 VISUAL OK
TJ-EP-04 - 29-Apr-22 29-May-22
RECORD DECEMBER 2021

INSPECTION TOOLS AND PPE RESUL

PROJECT : H-367
DATE : 16-Dec-21
COMPANY : PT. MAZAYO TANAMO
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 MT-WC-01 MT-GH-01 MT-PG-01 MT-CT-01 MT-PC-01
2 MT-WC-02 MT-GH-02 MT-PG-02 MT-CT-02 MT-PC-02
3 MT-WC-03 MT-GH-03 MT-PG-03 MT-CT-03 MT-PC-03
4 MT-WC-04 - MT-PG-04 - MT-PC-04
5 MT-WC-05 - MT-PG-05 - MT-PC-05
6 MT-WC-06 - - - -
7 MT-WC-07 - - - -
8 MT-WC-08 - - - -
RECORD DECEMBER 2021

ION TOOLS AND PPE RESULT DECEMBER 2021

LAMP Electrical BODY INSPECT EXPIRE


CABLE Panel HARNES DATE DATE
MT-LC-01 - - 17-Dec-21 17-Jan-22
MT-LC-02 - - 17-Dec-21 17-Jan-22
MT-LC-03 - - 17-Dec-21 17-Jan-22
MT-LC-04 - - 17-Dec-21 17-Jan-22
MT-LC-05 - - 17-Dec-21 17-Jan-22
- - - 17-Dec-21 17-Jan-22
- - - 17-Dec-21 17-Jan-22
- - - 17-Dec-21 17-Jan-22
REMARKS

KONDISI
VISUAL OK
INSPECTION TOOLS AND PPE RESULT OCTOBER 202

PROJECT : MV Intan Daya 12


DATE : 17-Sep-2022
COMPANY :: PT. SBB
INSPECTION BY : : Sutrisman
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 - - SBB-PG-01 - SBB-PC-01 SBB-LC-01 -
2 - - - - SBB-PC-02 SBB-LC-02 -
3 - - - - SBB-PC-03 SBB-LC-03 -
E RESULT OCTOBER 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
SBB-FBH-01 17-Sep-22 17-Oct-22
KONDISI
SBB-FBH-02 17-Sep-22 17-Oct-22 VISUAL OK
SBB-FBH-03 17-Sep-22 17-Oct-22
INSPECTION TOOLS AND PPE RESULT OCTOBER 202

PROJECT : H-370
DATE : 28-Sep-22
COMPANY :: PT. HDI
INSPECTION BY : : Julius Richad
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 - - HDI-PG-01 - HDI-PC-01 - -
2 - - HDI-PG-02 - HDI-PC-02 - -
3 - - HDI-PG-03 - - - -
4 - - HDI-PG-04 - - - -
5 - - HDI-PG-05 - - - -
RESULT OCTOBER 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 28-Sep-22 28-Oct-22
- 28-Sep-22 28-Oct-22
KONDISI
- 28-Sep-22 28-Oct-22 VISUAL OK
- 28-Sep-22 28-Oct-22
- 28-Sep-22 28-Oct-22
INSPECTION TOOLS AND PPE RESULT OCTOBER

PROJECT : Repair Project


DATE : 27-Oct-22
COMPANY : PT. NATOS
INSPECTION BY : Sutrisman
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - NTS-PG-01 - NTS-PC-01 NTS-ELC-01
2 - - NTS-PG-02 - NTS-PC-02 -
4 - - - - NTS-PC-03 -
D PPE RESULT OCTOBER 2022

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- NTS-FBH-01 27-Oct-22 27-Nov-22
KONDISI
- NTS-FBH-02 27-Oct-22 27-Nov-22
VISUAL OK
- - 27-Oct-22 27-Nov-22
INSPECTION TOOLS AND PPE R

PROJECT : H-361 (Sea Swift)


DATE : 29-Nov-22
COMPANY : PT. SEATECH
INSPECTION BY : Henrick Silalah
No WELDING GAS PORTABLE CUTING POWER
CABLE HOSE GRINDERS TORCH CABLE
1 - ST-GH-01 - - ST-PC-01
2 - ST-GH-02 - - ST-PC-02
3 - ST-GH-03 - - ST-PC-03
4 - ST-GH-04 - - ST-PC-04
5 - ST-GH-05 - - ST-PC-05
PECTION TOOLS AND PPE RESULT DECEMBER 2022

LAMP ELECTICAL BODY INSPECT EXPIRE


CABLE PANEL HARNES DATE DATE
ST-LC-01 - - 29-Nov-22 29-Dec-22
ST-LC-02 - - 29-Nov-22 29-Dec-22
- - - 29-Nov-22 29-Dec-22
- - - 29-Nov-22 29-Dec-22
- - - 29-Nov-22 29-Dec-22
REMARKS

KONDISI VISUAL OK
15-Sep-20
INSPECTION TOOLS AND PPE RESU

PROJECT : H-361 (Sea Swift)


DATE : 19-Nov-2022
COMPANY : PT. SC Mechanik
INSPECTION BY : Fahrinaldi
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 - - SCK-PG-01 - SCK-PC-01
2 - - SCK-PG-02 - SCK-PC-02
3 - - SCK-PG-03 - SCK-PC-03
4 - - SCK-PG-04 - -
ECTION TOOLS AND PPE RESULT DECEMBER 2022

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
SCK-LC-01 - - 19-Nov-22 19-Dec-22
SCK-LC-02 - - 19-Nov-22 19-Dec-22 KONDISI
SCK-LC-03 - - 19-Nov-22 19-Dec-22 VISUAL OK
- - - 19-Nov-22 19-Dec-22
INSPECTION TOOLS AND PPE RESULT DECEMBER 20

PROJECT : BG Marcopolo 298


DATE : 22-Dec-2022
COMPANY :: PT. RBG
INSPECTION BY : : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 RBG-WC-01 RBG-GH-01 RBG-PG-01 RBG-CT-01 RBG-PC-01 RBG-LC-01 -
2 RBG-WC-02 RBG-GH-02 RBG-PG-02 RBG-CT-02 RBG-PC-02 RBG-LC-02 -
3 RBG-WC-03 - - - - - -
4 RBG-WC-04 - - - - - -
5 RBG-WC-05 - - - - - -
6 RBG-WC-06 - - - - - -
7 RBG-WC-07 - - - - - -
8 RBG-WC-08 - - - - - -
9 RBG-WC-09 - - - - - -
RESULT DECEMBER 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
RBG-FBH-01 22-Dec-22 22-Jan-23
RBG-FBH-02 22-Dec-22 22-Jan-23
RBG-FBH-03 22-Dec-22 22-Jan-23
RBG-FBH-04 22-Dec-22 22-Jan-23
KONDISI
RBG-FBH-05 22-Dec-22 22-Jan-23 VISUAL OK
RBG-FBH-06 22-Dec-22 22-Jan-23
RBG-FBH-07 22-Dec-22 22-Jan-23
RBG-FBH-08 22-Dec-22 22-Jan-23
RBG-FBH-09 22-Dec-22 22-Jan-23
INSPECTION TOOLS AND PPE RESULT

PROJECT : H-378 & H-379


DATE : 31-Mar-23
COMPANY : PT. DMI
INSPECTION BY : Riko Wilson
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 DMI-WC-01 - - - - -
2 DMI-WC-02 - - - - -
3 - - - - - -
AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 31-Mar-23 30-Apr-23
KONDISI
- - 31-Mar-23 30-Apr-23 VISUAL OK
- - 31-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 20

PROJECT : H-388 & H-389


DATE : 31-Mar-2023
COMPANY :: PT. Nara Visi Batam
INSPECTION BY : : Julius
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 - - NVB-PG-01 - NVB-PC-01 NVB-LC-01 -
2 - - NVB-PG-02 - NVB-PC-02 NVB-LC-02 -
3 - - NVB-PG-03 - NVB-PC-03 NVB-LC-03 -
4 - - - - NVB-PC-04 NVB-LC-04 -
5 - - - - NVB-PC-05 NVB-LC-05 -
6 - - - - NVB-PC-06 NVB-LC-06 -
ESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 31-Mar-23 30-Apr-23
- 31-Mar-23 30-Apr-23
- 31-Mar-23 30-Apr-23 KONDISI
- 31-Mar-23 30-Apr-23 VISUAL OK
- 31-Mar-23 30-Apr-23
- 31-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE RESULT MAR

PROJECT : SPOB Meranti Daya


DATE : 27-Mar-2023
COMPANY : : PT. HC
INSPECTION BY : : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 HC-WC-01 HC-GH-01 HC-PG-01 HC-CT-01 HC-PC-01 -
2 HC-WC-02 - - - - -
ND PPE RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 27-Mar-22 27-Apr-22 KONDISI
- 27-Mar-22 27-Apr-22 VISUAL OK
INSPECTION TOOLS AND PPE RESULT MARCH2023

PROJECT : SPOB Meranti Daya


DATE : 13-Mar-2023
COMPANY : PT. LCS
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 LCS-WC-01 LCS-GH-01 LCS-PG-01 LCS-CT-01 LCS-PC-01 - -
2 - - LCS-PG-02 - - - -
RESULT MARCH2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
LCS-FBH-01 13-Mar-23 13-Apr-23 KONDISI VISUAL
OK
- 13-Mar-23 13-Apr-23
PROJECT : H-378 & H-379
DATE : 29-Mar-2023
COMPANY : : PT. Dunia Marindo
INSPECTION BY : : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 DM-WC-01 DM-GH-01 DM-PG-01 - DM-PC-01 -
2 DM-WC-02 DM-GH-02 DM-PG-02 - DM-PC-02 -
3 DM-WC-03 - DM-PG-03 - DM-PC-03 -
4 DM-WC-04 - DM-PG-04 - DM-PC-04 -
5 DM-WC-05 - DM-PG-05 - - -
6 DM-WC-06 - DM-PG-06 - - -
7 DM-WC-07 - DM-PG-07 - - -
8 - - DM-PG-08 - - -
ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- DM-FBH-01 29-Mar-23 29-Apr-23
- DM-FBH-02 29-Mar-23 29-Apr-23
- DM-FBH-03 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23 KONDISI
- - 29-Mar-23 29-Apr-23 VISUAL OK
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 202

PROJECT : H-391
DATE : 27-Mar-2023
COMPANY :: PT. MDS
INSPECTION BY : : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 MDS-WC-01 - MDS-PG-01 - MDS-PC-01 - -
2 MDS-WC-02 - MDS-PG-02 - MDS-PC-02 - -
3 MDS-WC-03 - MDS-PG-03 - MDS-PC-03 - -
PE RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 27-Mar-23 27-Apr-23
KONDISI
- 27-Mar-23 27-Apr-23 VISUAL OK
- 27-Mar-23 27-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 2023

PROJECT : H-388
DATE : 29-Mar-2023
COMPANY :: PT. AMS
INSPECTION BY : : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 AMS-WC-01 AMS-GH-01 AMS-PG-01 - AMS-PC-01 - -
2 AMS-WC-02 AMS-GH-02 AMS-PG-02 - AMS-PC-02 - -
3 AMS-WC-03 AMS-GH-03 AMS-PG-03 - AMS-PC-03 - -
4 AMS-WC-04 AMS-GH-04 AMS-PG-04 - AMS-PC-04 - -
5 AMS-WC-05 AMS-GH-05 - - AMS-PC-05 - -
6 AMS-WC-06 AMS-GH-06 - - AMS-PC-06 - -
7 AMS-WC-07 - - - AMS-PC-07 - -
8 AMS-WC-08 - - - - - -
9 AMS-WC-09 - - - - - -
10 AMS-WC-10 - - - - - -
11 AMS-WC-11 - - - - - -
12 AMS-WC-12 - - - - - -

PROJECT : H-413 & H-414


DATE : 28-Mar-2023
COMPANY :: PT. AMS
INSPECTION BY : : Fahrinaldi
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 AMS-WC-01 AMS-GH-01 AMS-PG-01 - - AMS-LC-01 AMS-EP-01
2 AMS-WC-02 AMS-GH-02 AMS-PG-02 - - AMS-LC-02 AMS-EP-02
3 AMS-WC-03 AMS-GH-03 AMS-PG-03 - - AMS-LC-03 AMS-EP-03
4 AMS-WC-04 AMS-GH-04 AMS-PG-04 - - AMS-LC-04 AMS-EP-04
5 AMS-WC-05 AMS-GH-05 - - - AMS-LC-05 AMS-EP-05
6 AMS-WC-06 AMS-GH-06 - - - AMS-LC-06 AMS-EP-06
7 AMS-WC-07 AMS-GH-07 - - - - AMS-EP-07
8 AMS-WC-08 - - - - - AMS-EP-08
9 AMS-WC-09 - - - - - AMS-EP-09
10 AMS-WC-10 - - - - - -
11 AMS-WC-11 - - - - - -
12 AMS-WC-12 - - - - - -
RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23 KONDISI
- 29-Mar-23 29-Apr-23 VISUAL OK

- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23 KONDISI
- 28-Mar-23 28-Apr-23 VISUAL OK

- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
INSPECTION TOOLS AND PPE RESULT JANU

PROJECT : H-379
DATE : 27-Feb-2023
COMPANY : PT. ZMS
INSPECTION BY : Riko Wilson
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 ZMS-WC-01 ZMS-GH-01 ZMS-PG-01 - ZMS-PC-01
2 ZMS-WC-02 - ZMS-PG-02 - -

PROJECT : H-387
DATE : 29-Mar-2023
COMPANY : PT. ZMS
INSPECTION BY : Dedy Manik
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 ZMS-WC-01 ZMS-GH-01 ZMS-PG-01 - ZMS-PC-01
2 ZMS-WC-02 ZMS-GH-02 ZMS-PG-02 - ZMS-PC-02
3 ZMS-WC-03 ZMS-GH-03 ZMS-PG-03 - ZMS-PC-03
4 ZMS-WC-04 ZMS-GH-04 ZMS-PG-04 - ZMS-PC-04
5 ZMS-WC-05 - - - -
6 ZMS-WC-06 - - - -
7 ZMS-WC-07 - - - -
8 ZMS-WC-08 - - - -
9 ZMS-WC-09 - - - -
10 ZMS-WC-10 - - - -
11 ZMS-WC-11 - - - -
12 ZMS-WC-12 - - - -

PROJECT : H-394
DATE : 31-Mar-2023
COMPANY : PT. ZMS
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 ZMS-WC-01 ZMS-GH-01 ZMS-PG-01 - ZMS-PC-01
2 ZMS-WC-02 - ZMS-PG-02 - ZMS-PC-02
3 ZMS-WC-03 - - - ZMS-PC-03
4 ZMS-WC-04 - - - -
5 ZMS-WC-05 - - - -
6 ZMS-WC-06 - - - -
7 ZMS-WC-07 - - - -
AND PPE RESULT JANUARY 2023

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
ZMS-LC-01 - - 27-Feb-23 27-Mar-23 KONDISI
- - - 27-Feb-23 27-Mar-23 VISUAL OK

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
ZMS-LC-01 - - 29-Mar-23 29-Apr-23
ZMS-LC-02 - - 29-Mar-23 29-Apr-23
ZMS-LC-03 - - 29-Mar-23 29-Apr-23
ZMS-LC-04 - - 29-Mar-23 29-Apr-23
ZMS-LC-05 - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23 KONDISI
- - - 29-Mar-23 29-Apr-23 VISUAL OK
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
ZMS-LC-01 - - 31-Mar-23 30-Apr-23
ZMS-LC-02 - - 31-Mar-23 30-Apr-23
- - - 31-Mar-23 30-Apr-23
KONDISI
VISUAL OK
KONDISI
- - - 31-Mar-23 30-Apr-23
VISUAL OK
- - - 31-Mar-23 30-Apr-23
- - - 31-Mar-23 30-Apr-23
- - - 31-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE

PROJECT : H-391, H-394 & H-395


DATE : 29-Mar-2023
COMPANY : PT. BME
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 BME-WC-01 - BME-PG-01 - BME-PC-01
2 BME-WC-02 - BME-PG-02 - BME-PC-02
3 BME-WC-03 - BME-PG-03 - BME-PC-03
4 BME-WC-04 - BME-PG-04 - BME-PC-04
5 - - BME-PG-05 - BME-PC-05
6 - - BME-PG-06 - BME-PC-06
7 - - BME-PD-01 - BME-PC-07
8 - - BME-PD-02 - -
9 - - BME-PD-03 - -
10 - - BME-PD-04 - -
11 - - BME-PD-05 - -
12 - - BME-PD-06 - -
ON TOOLS AND PPE RESULT MARCH 2023

LAMP ELECTRICAL BODY INSPECT EXPIRE


CABLE PANEL HARNES DATE DATE
BME-LC-01 BME-EP-01 - 29-Mar-23 29-Apr-23
BME-LC-02 BME-EP-02 - 29-Mar-23 29-Apr-23
BME-LC-03 BME-EP-03 - 29-Mar-23 29-Apr-23
BME-LC-04 - - 29-Mar-23 29-Apr-23
BME-LC-05 - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
- - - 29-Mar-23 29-Apr-23
REMARKS

KONDISI
VISUAL OK
INSPECTION TOOLS AND PPE RESULT MAR

PROJECT : H-379
DATE : 29-Mar-23
COMPANY : PT. JSA
INSPECTION BY : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP ELECTICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 JSA-WC-01 JSA-GH-01 JSA-PG-01 JSA-CT-01 JSA-PC-01 JSA-LC-01 -
2 JSA-WC-02 JSA-GH-02 JSA-PG-02 JSA-CT-02 JSA-PC-02 JSA-LC-02 -
3 JSA-WC-03 JSA-GH-03 JSA-PG-03 JSA-CT-03 JSA-PC-03 JSA-LC-03 -
4 JSA-WC-04 JSA-GH-04 JSA-PG-04 JSA-CT-04 JSA-PC-04 JSA-LC-04 -
5 JSA-WC-05 JSA-GH-05 JSA-PG-05 JSA-CT-05 JSA-PC-05 JSA-LC-05 -
6 JSA-WC-06 JSA-GH-06 JSA-PG-06 JSA-CT-06 JSA-PC-06 JSA-LC-06 -
7 JSA-WC-07 JSA-GH-07 JSA-PG-07 JSA-CT-07 JSA-PC-07 JSA-LC-07 -
8 JSA-WC-08 JSA-GH-08 JSA-PG-08 JSA-CT-08 JSA-PC-08 JSA-LC-08 -
9 JSA-WC-09 JSA-GH-09 JSA-PG-09 JSA-CT-09 JSA-PC-09 JSA-LC-09 -
10 JSA-WC-10 JSA-GH-10 JSA-PG-10 JSA-CT-10 JSA-PC-10 JSA-LC-10 -
11 JSA-WC-11 JSA-GH-11 JSA-PG-11 JSA-CT-11 JSA-PC-11 JSA-LC-11 -
12 JSA-WC-12 JSA-GH-12 JSA-PG-12 JSA-CT-12 JSA-PC-12 JSA-LC-12 -
13 JSA-WC-13 JSA-GH-13 JSA-PG-13 JSA-CT-13 JSA-PC-13 JSA-LC-13 -
14 JSA-WC-14 JSA-GH-14 JSA-PG-14 JSA-CT-14 JSA-PC-14 JSA-LC-14 -
15 JSA-WC-15 JSA-GH-15 JSA-PG-15 JSA-CT-15 JSA-PC-15 JSA-LC-15 -
16 JSA-WC-16 JSA-GH-16 - JSA-CT-16 - - -
17 JSA-WC-17 JSA-GH-17 - JSA-CT-17 - - -
18 JSA-WC-18 JSA-GH-18 - JSA-CT-18 - - -
19 JSA-WC-19 JSA-GH-19 - JSA-CT-19 - - -
20 JSA-WC-20 JSA-GH-20 - JSA-CT-20 - - -
21 JSA-WC-21 JSA-GH-21 - JSA-CT-21 - - -
22 JSA-WC-22 JSA-GH-22 - JSA-CT-22 - - -
23 JSA-WC-23 JSA-GH-23 - JSA-CT-23 - - -
24 JSA-WC-24 JSA-GH-24 - JSA-CT-24 - - -
25 JSA-WC-25 JSA-GH-25 - JSA-CT-25 - - -
26 JSA-WC-26 JSA-GH-26 - JSA-CT-26 - - -
27 JSA-WC-27 JSA-GH-27 - JSA-CT-27 - - -
28 JSA-WC-28 JSA-GH-28 - JSA-CT-28 - - -
29 JSA-WC-29 JSA-GH-29 - JSA-CT-29 - - -
30 JSA-WC-30 JSA-GH-30 - JSA-CT-30 - - -
31 JSA-WC-31 - - - - - -
32 JSA-WC-32 - - - - - -
33 JSA-WC-33 - - - - - -
34 JSA-WC-34 - - - - - -
35 JSA-WC-35 - - - - - -
36 JSA-WC-36 - - - - - -

INSPECTION TOOLS AND PPE RESULT AUG

PROJECT : MV Intan Daya 9


DATE : 12-Aug-22
COMPANY : PT. JSA
INSPECTION BY : Anselmus
WELDING GAS PORTABLE CUTING POWER LAMP ELECTICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 JSA-WC-01 JSA-GH-01 JSA-PG-01 JSA-CT-01 JSA-PC-01 JSA-LC-01 -
2 JSA-WC-02 JSA-GH-02 JSA-PG-02 JSA-CT-02 JSA-PC-02 JSA-LC-02 -
3 JSA-WC-03 JSA-GH-03 JSA-PG-03 JSA-CT-03 JSA-PC-03 JSA-LC-03 -
4 JSA-WC-04 JSA-GH-04 - JSA-CT-04 - - -
5 JSA-WC-05 JSA-GH-05 - JSA-CT-05 - - -
6 JSA-WC-06 JSA-GH-06 - JSA-CT-06 - - -
7 JSA-WC-07 - - - - - -
8 JSA-WC-08 - - - - - -
9 JSA-WC-09 - - - - - -
10 JSA-WC-10 - - - - - -
11 JSA-WC-11 - - - - - -
AND PPE RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
KONDIS VISUAL OK
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23

AND PPE RESULT AUGUST 202

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22 KONDIS VISUAL OK
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
- 12-Aug-22 12-Sep-22
INSPECTION TOOLS AND PPE RE

PROJECT : H-391, H-394, H-395 & H-403


DATE : 30-Mar-2023
COMPANY : PT. MAS
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 MAS-WC-01 MAS-GH-01 MAS-PG-01 MAS-CT-01 MAS-PC-01
2 MAS-WC-02 MAS-GH-02 MAS-PG-02 MAS-CT-02 MAS-PC-02
3 MAS-WC-03 MAS-GH-03 MAS-PG-03 MAS-CT-03 MAS-PC-03
4 MAS-WC-04 MAS-GH-04 MAS-PG-04 MAS-CT-04 MAS-PC-04
5 MAS-WC-05 MAS-GH-05 MAS-PG-05 MAS-CT-05 MAS-PC-05
6 MAS-WC-06 - MAS-PG-06 - MAS-PC-06
7 MAS-WC-07 - - - MAS-PC-07
8 MAS-WC-08 - - - MAS-PC-08
9 MAS-WC-09 - - - -
10 MAS-WC-10 - - - -
N TOOLS AND PPE RESULT MARCH 2023

LAMP ELECTRICAL BODY INSPECT EXPIRE


REMARKS
CABLE PANEL HARNES DATE DATE
MAS-LC-01 - - 30-Mar-23 30-Apr-23
MAS-LC-02 - - 30-Mar-23 30-Apr-23
MAS-LC-03 - - 30-Mar-23 30-Apr-23
MAS-LC-04 - - 30-Mar-23 30-Apr-23
MAS-LC-05 - - 30-Mar-23 30-Apr-23 KONDISI
MAS-LC-06 - - 30-Mar-23 30-Apr-23 VISUAL OK
- - - 30-Mar-23 30-Apr-23
- - - 30-Mar-23 30-Apr-23
- - - 30-Mar-23 30-Apr-23
- - - 30-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 2023

PROJECT : TB Limin Handler


DATE : 27-Mar-2023
COMPANY : LMI
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 - LMI/GH/01 LMI/PG/01 LMI/CT/01 LMI/PC/01 - LMI/EP/01
2 - - LMI/PG/02 - LMI/PC/02 - LMI/EP/02
3 - - LMI/PG/03 - - - -

Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. B
diberikan logo atau sticker inspeksi…!!!
ESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
LMI/FBH/01 27-Mar-23 27-Apr-23
LMI/FBH/02 27-Mar-23 27-Apr-23 KONDIS VISUAL OK
- 27-Mar-23 27-Apr-23

nspeksi oleh HSE Personil PT. BA, dan kemudian yang sudah -
INSPECTION TOOLS AN

PROJECT : MV Intan Daya 288


DATE : 29-Mar-23
COMPANY : PT. An-Flex
INSPECTION BY : Sutrisman
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 - Anflex-GH-01 Anflex-PG-01 Anflex-CT-01
2 - Anflex-GH-02 Anflex-PG-02 Anflex-CT-02
3 - - Anflex-PG-03 -
4 - - Anflex-PG-04 -
5 - - - -
6 - - - -
INSPECTION TOOLS AND PPE RESULT MARCH 2023

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
Anflex-PC-01 - - Anflex-FBH-01 29-Mar-23
Anflex-PC-02 - - Anflex-FBH-02 29-Mar-23
- - - Anflex-FBH-03 29-Mar-23
- - - Anflex-FBH-04 29-Mar-23
- - - Anflex-FBH-05 29-Mar-23
- - - Anflex-FBH-06 29-Mar-23
EXPIRE
REMARKS
DATE
29-Apr-23
29-Apr-23
29-Apr-23 KONDISI
29-Apr-23 VISUAL OK

29-Apr-23
29-Apr-23
INSPECTION TOOLS AND

PROJECT : H-379, H-394 & 395


DATE : 29-Mar-2023
COMPANY : PT. BSU
INSPECTION BY : Chairul Abadi
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 - - BSU-PG-01 -
2 - - BSU-PG-02 -
3 - - BSU-PG-03 -
4 - - BSU-PG-04 -
5 - - BSU-PG-05 -
6 - - BSU-PG-06 -
7 - - BSU-PG-07 -
8 - - BSU-PG-08 -
9 - - BSU-PG-09 -
10 - - BSU-PG-10 -
11 - - - -
12 - - - -
13 - - - -
14 - - - -
15 - - - -
INSPECTION TOOLS AND PPE RESULT MARCH 2022

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
BSU-PC-01 BSU-LC-01 - - 29-Mar-23
BSU-PC-02 BSU-LC-02 - - 29-Mar-23
BSU-PC-03 BSU-LC-03 - - 29-Mar-23
BSU-PC-04 BSU-LC-04 - - 29-Mar-23
BSU-PC-05 BSU-LC-05 - - 29-Mar-23
BSU-PC-06 BSU-LC-06 - - 29-Mar-23
BSU-PC-07 BSU-LC-07 - - 29-Mar-23
BSU-PC-08 BSU-LC-08 - - 29-Mar-23
BSU-PC-09 BSU-LC-09 - - 29-Mar-23
BSU-PC-10 BSU-LC-10 - - 29-Mar-23
- BSU-LC-11 - - 29-Mar-23
- BSU-LC-12 - - 29-Mar-23
- BSU-LC-13 - - 29-Mar-23
- BSU-LC-14 - - 29-Mar-23
- BSU-LC-15 - - 29-Mar-23
EXPIRE
REMARKS
DATE
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
KONDISI
29-Apr-23
VISUAL OK
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 2

PROJECT : Repair Project


DATE : 24-Mar-2023
COMPANY : PT. CMI
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 CMI-WC-01 CMI-GH-01 - CMI-CT-01 CMI-PC-01 CMI-LC-01
2 CMI-WC-02 CMI-GH-02 - CMI-CT-02 CMI-PC-02 CMI-LC-02
3 CMI-WC-03 CMI-GH-03 - CMI-CT-03 CMI-PC-03 CMI-LC-03
4 CMI-WC-04 CMI-GH-04 - CMI-CT-04 CMI-PC-04 CMI-LC-04
5 CMI-WC-05 CMI-GH-05 - CMI-CT-05 CMI-PC-05 CMI-LC-05
6 CMI-WC-06 CMI-GH-06 - CMI-CT-06 - CMI-LC-06
7 CMI-WC-07 CMI-GH-07 - CMI-CT-07 - CMI-LC-07
8 CMI-WC-08 CMI-GH-08 - CMI-CT-08 - -
9 CMI-WC-09 CMI-GH-09 - CMI-CT-09 - -
10 CMI-WC-10 CMI-GH-10 - CMI-CT-10 - -
11 CMI-WC-11 CMI-GH-11 - CMI-CT-11 - -
12 CMI-WC-12 CMI-GH-12 - CMI-CT-12 - -
13 CMI-WC-13 CMI-GH-13 - CMI-CT-13 - -
14 CMI-WC-14 CMI-GH-14 - CMI-CT-14 - -
15 CMI-WC-15 - - - - -
16 CMI-WC-16 - - - - -
17 CMI-WC-17 - - - - -

PROJECT : H-378
DATE : : 31-Jan-2023
COMPANY : PT. CMI
INSPECTION BY : Chairul Abadi
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - CMI-PG-01 - CMI-PC-01 CMI-LC-01
2 - - CMI-PG-02 - CMI-PC-02 CMI-LC-02
3 - - CMI-PG-03 - CMI-PC-03 CMI-LC-03
4 - - CMI-PG-04 - CMI-PC-04 CMI-LC-04
5 - - CMI-PG-05 - CMI-PC-05 CMI-LC-05
6 - - CMI-PG-06 - CMI-PC-06 CMI-LC-06
7 - - CMI-PG-07 - CMI-PC-07 CMI-LC-07
8 - - CMI-PG-08 - CMI-PC-08 CMI-LC-08
9 - - CMI-PG-09 - CMI-PC-09 CMI-LC-09
10 - - CMI-PG-10 - CMI-PC-10 CMI-LC-10
11 - - - - CMI-PC-11 CMI-LC-11
12 - - - - CMI-PC-12 CMI-LC-12
13 - - - - CMI-PC-13 -
D PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
KONDISI
- - 24-Feb-23 24-Apr-23
VISUAL OK
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- CMI-FBH-01 31-Jan-23 28-Feb-23
- CMI-FBH-02 31-Jan-23 28-Feb-23
- CMI-FBH-03 31-Jan-23 28-Feb-23
- CMI-FBH-04 31-Jan-23 28-Feb-23
- CMI-FBH-05 31-Jan-23 28-Feb-23
- - 31-Jan-23 28-Feb-23
KONDISI
- - 31-Jan-23 28-Feb-23
VISUAL OK
- - 31-Jan-23 28-Feb-23
- - 31-Jan-23 28-Feb-23
- - 31-Jan-23 28-Feb-23
VISUAL OK

- - 31-Jan-23 28-Feb-23
- - 31-Jan-23 28-Feb-23
- - 31-Jan-23 28-Feb-23
INSPECTION TOOLS AND PPE

PROJECT : H-409
DATE : 27-Mar-2023
COMPANY : PT. MSM
INSPECTION BY : Fahrinaldi
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 MSM-WC-01 MSM-GH-01 MSM-PG-01 -

2 MSM-WC-02 MSM-GH-02 MSM-PG-02 -

3 MSM-WC-03 MSM-GH-03 MSM-PG-03 -

4 MSM-WC-04 MSM-GH-04 MSM-PG-04 -

5 MSM-WC-05 - MSM-PG-05 -

6 MSM-WC-06 - - -

PROJECT : H-386
DATE : 29-Mar-2023
COMPANY : PT. SBA
INSPECTION BY : Dedy Manik
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 SBA-WC-01 - SBA-PG-01 -
2 SBA-WC-02 - SBA-PG-02 -
3 SBA-WC-03 - SBA-PG-03 -
4 SBA-WC-04 - SBA-PG-04 -
5 SBA-WC-05 - SBA-PG-05 -
6 SBA-WC-06 - SBA-PG-06 -
7 SBA-WC-07 - SBA-PG-07 -
8 SBA-WC-08 - - -
9 SBA-WC-09 - - -
10 SBA-WC-10 - - -
11 - - - -
12 - - - -

PROJECT : H-409
DATE : 25-Feb-2023
COMPANY : PT. SBA
INSPECTION BY : Fahrinaldi
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 SBA-WC-01 SBA-GH-01 SBA-PG-01 -
2 SBA-WC-02 SBA-GH-02 SBA-PG-02 -
3 SBA-WC-03 SBA-GH-03 - -
4 SBA-WC-04 SBA-GH-04 - -
5 SBA-WC-05 SBA-GH-05 - -
6 SBA-WC-06 - - -
7 SBA-WC-07 - - -
8 SBA-WC-08 - - -
9 SBA-WC-09 - - -

PROJECT : H-378
DATE : 29-Mar-2023
COMPANY : PT. SBA
INSPECTION BY : Servasius Rino
No WELDING GAS PORTABLE CUTING
CABLE HOSE GRINDERS TORCH
1 SBA-WC-01 SBA-GH-01 SBA-PG-01 -
2 SBA-WC-02 SBA-GH-02 SBA-PG-02 -
3 SBA-WC-03 SBA-GH-03 - -
4 SBA-WC-04 SBA-GH-04 - -
5 SBA-WC-05 SBA-GH-05 - -
6 SBA-WC-06 - - -
7 SBA-WC-07 - - -
8 SBA-WC-08 - - -
9 SBA-WC-09 - - -
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
NSPECTION TOOLS AND PPE RESULT MARCH 2023

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
MSM-PC-01 MSM-LC-01 MSM-EP-01 MSM-FBH-01 27-Mar-23

MSM-PC-02 MSM-LC-02 MSM-EP-02 MSM-FBH-02 27-Mar-23

MSM-PC-03 MSM-LC-03 - MSM-FBH-03 27-Mar-23

MSM-PC-04 MSM-LC-04 - MSM-FBH-04 27-Mar-23

MSM-PC-05 MSM-LC-05 - - 27-Mar-23

MSM-PC-06 - - - 27-Mar-23

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
SBA-PC-01 SBA-LC-01 SBA-EP-01 SBA-FBH-01 29-Mar-23
SBA-PC-02 SBA-LC-02 SBA-EP-02 SBA-FBH-02 29-Mar-23
SBA-PC-03 SBA-LC-03 - SBA-FBH-03 29-Mar-23
SBA-PC-04 SBA-LC-04 - SBA-FBH-04 29-Mar-23
SBA-PC-05 SBA-LC-05 - SBA-FBH-05 29-Mar-23
SBA-PC-06 SBA-LC-06 - SBA-FBH-06 29-Mar-23
SBA-PC-07 SBA-LC-07 - - 29-Mar-23
SBA-PC-08 - - - 29-Mar-23
SBA-PC-09 - - - 29-Mar-23
SBA-PC-10 - - - 29-Mar-23
- - - - 29-Mar-23
- - - - 29-Mar-23
POWER LAMP ELECTRICAL BODY INSPECT
CABLE CABLE PANEL HARNES DATE
SBA-PC-01 SBA-LC-01 - SBA-FBH-01 25-Feb-23
SBA-PC-02 SBA-LC-02 - SBA-FBH-02 25-Feb-23
SBA-PC-03 SBA-LC-03 - SBA-FBH-03 25-Feb-23
SBA-PC-04 SBA-LC-04 - - 25-Feb-23
- SBA-LC-05 - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
SBA-PC-01 SBA-LC-01 - SBA-FBH-01 25-Feb-23
SBA-PC-02 SBA-LC-02 - SBA-FBH-02 25-Feb-23
SBA-PC-03 SBA-LC-03 - SBA-FBH-03 25-Feb-23
SBA-PC-04 SBA-LC-04 - - 25-Feb-23
- SBA-LC-05 - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23
- - - - 25-Feb-23
EXPIRE
REMARKS
DATE
27-Apr-23

27-Apr-23

27-Apr-23 KONDISI VISUAL


OK
27-Apr-23

27-Apr-23

27-Apr-23

EXPIRE
REMARKS
DATE
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23 KONDISI VISUAL
29-Apr-23 OK
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
29-Apr-23
EXPIRE
REMARKS
DATE
25-Mar-23
25-Mar-23
25-Mar-23
25-Mar-23
KONDISI VISUAL
25-Mar-23
OK
25-Mar-23
25-Mar-23
25-Mar-23
25-Mar-23

EXPIRE
REMARKS
DATE
25-Mar-23
25-Mar-23
25-Mar-23
25-Mar-23
KONDISI VISUAL
25-Mar-23
OK
25-Mar-23
25-Mar-23
25-Mar-23
25-Mar-23
INSPECTION TOOLS AND PPE

PROJECT : MV Sinar Penida


DATE : 24-March-2023
COMPANY : PT. Mentari Jaya
INSPECTION BY : Fredmai Hendra Tobing
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 MJ-WC-01 MJ-GH-01 MJ-PG-01 MJ-CT-01 MJ-PC-01
2 MJ-WP-01 - MJ-PG-02 - MJ-PC-02
3 MJ-WP-02 - MJ-PG-03 - MJ-PC-03
4 - - MJ-PG-04 - MJ-PC-04
5 - - MJ-PG-05 - MJ-PC-05
6 - - MJ-DG-01 - MJ-PC-06
7 - - MJ-DG-02 - -
8 - - MJ-ED-01 - -
TOOLS AND PPE RESULT MARCH 2023

LAMP ELECTRICAL BODY INSPECT EXPIRE


CABLE PANEL HARNES DATE DATE
MJ-LC-01 - MJ-FBH-01 24-Mar-23 24-Apr-23
MJ-LC-02 - MJ-FBH-02 24-Mar-23 24-Apr-23
MJ-LC-03 - MJ-FBH-03 24-Mar-23 24-Apr-23
MJ-LC-04 - MJ-FBH-04 24-Mar-23 24-Apr-23
MJ-LC-05 - MJ-FBH-06 24-Mar-23 24-Apr-23
- - - 24-Mar-23 24-Apr-23
- - - 24-Mar-23 24-Apr-23
- - - 24-Mar-23 24-Apr-23
REMARKS

KONDISI
VISUAL OK
INSPECTION TOOLS AND PPE

PROJECT : MV Intan Daya 288


DATE : 27-Mar-2023
COMPANY : : PT. PSA
INSPECTION BY : : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 - - - - PSA-PC-01
2 - - - - PSA-PC-02
3 - - - - PSA-PC-03
4 - - - - PSA-PC-04
5 - - - - PSA-PC-05
6 - - - - PSA-PC-06
7 - - - - -
8 - - - - -

PROJECT : Repair Project


DATE : 30-Mar-2023
COMPANY : : PT. PSA
INSPECTION BY : : Petrus Nggaro
WELDING GAS PORTABLE CUTING POWER
No
CABLE HOSE GRINDERS TORCH CABLE
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
CTION TOOLS AND PPE RESULT DECEMBER 2022

LAMP ELECTRICAL BODY INSPECT EXPIRE


CABLE PANEL HARNES DATE DATE
PSA-LC-01 PSA-EP-01 PSA-BH-01 27-Mar-23 27-Apr-23
PSA-LC-02 - PSA-BH-02 27-Mar-23 27-Apr-23
PSA-LC-03 - - 27-Mar-23 27-Apr-23
- - - 27-Mar-23 27-Apr-23
- - - 27-Mar-23 27-Apr-23
- - - 27-Mar-23 27-Apr-23
- - - 27-Mar-23 27-Apr-23
- - - 27-Mar-23 27-Apr-23

LAMP ELECTRICAL BODY INSPECT EXPIRE


CABLE PANEL HARNES DATE DATE
- - PSA-BH-01 30-Mar-23 30-Apr-23
- - PSA-BH-02 30-Mar-23 30-Apr-23
- - PSA-BH-03 30-Mar-23 30-Apr-23
- - PSA-BH-04 30-Mar-23 30-Apr-23
- - PSA-BH-05 30-Mar-23 30-Apr-23
- - PSA-BH-06 30-Mar-23 30-Apr-23
- - PSA-BH-07 30-Mar-23 30-Apr-23
- - PSA-BH-08 30-Mar-23 30-Apr-23
- - PSA-BH-09 30-Mar-23 30-Apr-23
REMARKS

KONDISI
VISUAL OK

REMARKS

KONDISI
VISUAL OK
INSPECTION TOOLS AND PPE RESULT MARCH 2023

PROJECT : SPOB Meranti Daya


DATE : 27-Mar-2023
COMPANY : PT. Sukses Jonathan
INSPECTION BY : : Petrus Nggaro
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 SJ-WC-01 SJ-GH-01 SJ-PG-01 SJ-CT-01 SJ-PC-01 SJ-LC-01 -
2 SJ-WC-02 SJ-GH-02 SJ-PG-02 SJ-CT-02 SJ-PC-02 SJ-LC-02 -
3 SJ-WC-03 SJ-GH-03 SJ-PG-03 SJ-CT-03 SJ-PC-03 SJ-LC-03 -
4 SJ-WC-04 SJ-GH-04 - SJ-CT-04 SJ-PC-04 SJ-LC-04 -
5 SJ-WC-05 - - - SJ-PC-05 - -
6 SJ-WC-06 - - - - - -
7 SJ-WC-07 - - - - - -
ESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
SJ-FBH-01 27-Mar-23 27-Apr-23
SJ-FBH-02 27-Mar-23 27-Apr-23
SJ-FBH-03 27-Mar-23 27-Apr-23
KONDISI
SJ-FBH-04 27-Mar-23 27-Apr-23
VISUAL OK
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
INSPECTION TOOLS AND PPE

PROJECT : H-389 & H-400


DATE : 30-Mar-2023
COMPANY :: PT. KMJ
INSPECTION BY : : Dedy Manik
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 -
2 KMJ-WC-02 KMJ-GH-02 KMJ-PG-02 -
3 KMJ-WC-03 KMJ-GH-03 KMJ-PG-03 -
4 KMJ-WC-04 KMJ-GH-04 KMJ-PG-04 -
5 KMJ-WC-05 KMJ-GH-05 KMJ-PG-05 -
6 KMJ-WC-06 KMJ-GH-06 - -
7 KMJ-WC-07 - - -
8 KMJ-WC-08 - - -
9 KMJ-WC-09 - - -
10 KMJ-WC-10 - - -

PROJECT : H-391 & H-392


DATE : 30-Mar-2023
COMPANY :: PT. KMJ
INSPECTION BY : : Julius
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 -
2 KMJ-WC-02 KMJ-GH-02 KMJ-PG-02 -
3 KMJ-WC-03 - KMJ-PG-03 -
4 KMJ-WC-04 - - -
5 KMJ-WC-05 - - -

PROJECT : H-405 & H-406


DATE : 29-Mar-2023
COMPANY :: PT. KMJ
INSPECTION BY : : Ranto Nasuition
WELDING GAS PORTABLE CUTING
No
CABLE HOSE GRINDERS TORCH
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 -
2 KMJ-WC-02 KMJ-GH-02 - -
3 KMJ-WC-03 - - -
4 KMJ-WC-04 - - -
5 KMJ-WC-05 - - -
PECTION TOOLS AND PPE RESULT MARCH 2023

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
KMJ-PC-01 KMJ-LC-01 - - 30-Mar-23
KMJ-PC-02 KMJ-LC-02 - - 30-Mar-23
KMJ-PC-03 KMJ-LC-03 - - 30-Mar-23
KMJ-PC-04 KMJ-LC-04 - - 30-Mar-23
- - - - 30-Mar-23
- - - - 30-Mar-23
- - - - 30-Mar-23
- - - - 30-Mar-23
- - - - 30-Mar-23
- - - - 30-Mar-23

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
KMJ-PC-01 KMJ-LC-01 - - 30-Mar-23
KMJ-PC-02 KMJ-LC-02 - - 30-Mar-23
KMJ-PC-03 KMJ-LC-03 - - 30-Mar-23
KMJ-PC-04 KMJ-LC-04 - - 30-Mar-23
- - - - 30-Mar-23

POWER LAMP ELECTRICAL BODY INSPECT


CABLE CABLE PANEL HARNES DATE
KMJ-PC-01 KMJ-LC-01 - - 29-Mar-23
KMJ-PC-02 KMJ-LC-02 - - 29-Mar-23
KMJ-PC-03 - - - 29-Mar-23
- - - - 29-Mar-23
- - - - 29-Mar-23
EXPIRE
REMARKS
DATE
30-Apr-23
30-Apr-23
30-Apr-23
30-Apr-23
30-Apr-23 KONDISI
30-Apr-23 VISUAL OK

30-Apr-23
30-Apr-23
30-Apr-23
30-Apr-23

EXPIRE
REMARKS
DATE
30-Apr-23
30-Apr-23
KONDISI
30-Apr-23 VISUAL OK
30-Apr-23
30-Apr-23

EXPIRE
REMARKS
DATE
29-Apr-23
29-Apr-23
KONDISI
29-Apr-23 VISUAL OK
29-Apr-23
29-Apr-23
INSPECTION TOOLS AND PPE RESULT JANUARY

PROJECT : H-399 & H-405


DATE : 30-Mar-2023
COMPANY : PT. THJ
INSPECTION BY :: Ranto Nasution
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 THJ-WC-01 THJ-GH-01 THJ-PG-01 THJ-CT-01 THJ-PC-01 THJ-LC-01
2 THJ-WC-02 THJ-GH-02 THJ-PG-02 THJ-CT-02 THJ-PC-02 THJ-LC-02
3 THJ-WC-03 THJ-GH-03 THJ-PG-03 THJ-CT-03 THJ-PC-03 THJ-LC-03
4 - - - - THJ-PC-04 THJ-LC-04

PROJECT : H-378
DATE : 25-Jan-2023
COMPANY : PT. THJ
INSPECTION BY :: Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - THJ-PG-01 - THJ-PC-01 THJ-LC-01
2 - - THJ-PG-02 - THJ-PC-02 THJ-LC-02
3 - - THJ-PG-03 - THJ-PC-03 THJ-LC-03
4 - - THJ-PG-04 - THJ-PC-04 THJ-LC-04
5 - - THJ-PG-05 - THJ-PC-05 THJ-LC-05
6 - - THJ-PG-06 - THJ-PC-06 THJ-LC-06
7 - - THJ-PG-07 - THJ-PC-07 THJ-LC-07
8 - - THJ-PG-08 - THJ-PC-08 THJ-LC-08
9 - - THJ-PG-09 - THJ-PC-09 THJ-LC-09
10 - - THJ-PG-10 - THJ-PC-10 THJ-LC-10
11 - - THJ-PGB-1 - THJ-PC-11 THJ-LC-11
12 - - THJ-PGB-2 - THJ-PC-12 THJ-LC-12
13 - - THJ-PGB-3 - THJ-PC-13 THJ-LC-13
14 - - THJ-PGB-4 - THJ-PC-14 THJ-LC-14
15 - - THJ-PGB-5 - THJ-PC-15 THJ-LC-15
16 - - THJ-PGB-6 - THJ-PC-16 -
17 - - THJ-PGB-7 - THJ-PC-17 -
18 - - THJ-PGB-8 - THJ-PC-18 -
19 - - THJ-PGB-9 - THJ-PC-19 -
20 - - THJ-PGB-10 - - -
PROJECT : H-378
DATE : 23-Feb-2023
COMPANY : PT. THJ
INSPECTION BY :: Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 THJ-WC-01 THJ-GH-01 THJ-PG-01 THJ-CT-01 THJ-PC-01 THJ-LC-01
2 THJ-WC-02 THJ-GH-02 THJ-PG-02 THJ-CT-02 THJ-PC-02 THJ-LC-02
3 THJ-WC-03 - THJ-PG-03 - THJ-PC-03 THJ-LC-03
4 THJ-WC-04 - THJ-PG-04 - THJ-PC-04 THJ-LC-04
5 THJ-WC-05 - THJ-PG-05 - THJ-PC-05 THJ-LC-05
6 THJ-WC-06 - THJ-PG-06 - THJ-PC-06 -
7 - - THJ-PG-07 - THJ-PC-07 -
8 - - THJ-PG-08 - THJ-PC-08 -
9 - - THJ-PG-09 - THJ-PC-09 -
10 - - THJ-PG-10 - THJ-PC-10 -
11 - - - - THJ-PC-11 -
12 - - - - THJ-PC-12 -
13 - - - - THJ-PC-13 -

PROJECT : H-378 & H-379


DATE : 22-Feb-2023
COMPANY : PT. THJ
INSPECTION BY :: Riko Wilson
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - THJ-PG-01 - THJ-PC-01 THJ-LC-01
2 - - THJ-PG-02 - THJ-PC-02 THJ-LC-02
3 - - THJ-PG-03 - THJ-PC-03 THJ-LC-03
4 - - THJ-PG-04 - THJ-PC-04 THJ-LC-04
5 - - THJ-PG-05 - THJ-PC-05 THJ-LC-05
6 - - THJ-PG-06 - THJ-PC-06 THJ-LC-06
7 - - THJ-PG-07 - THJ-PC-07 THJ-LC-07
8 - - THJ-PG-08 - THJ-PC-08 THJ-LC-08
9 - - THJ-PG-09 - THJ-PC-09 THJ-LC-09
10 - - THJ-PG-10 - THJ-PC-10 THJ-LC-10
11 - - THJ-PG-11 - THJ-PC-11 THJ-LC-11
12 - - THJ-PG-12 - THJ-PC-12 THJ-LC-12
13 - - THJ-PG-13 - THJ-PC-13 THJ-LC-13
14 - - THJ-PG-14 - THJ-PC-14 THJ-LC-14
15 - - THJ-PG-15 - THJ-PC-15 THJ-LC-15
16 - - THJ-PG-16 - THJ-PC-16 -
17 - - THJ-PG-17 - THJ-PC-17 -
18 - - THJ-PG-18 - - -
19 - - THJ-PG-19 - - -
20 - - THJ-PG-20 - - -
D PPE RESULT JANUARY 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23 KONDISI
- - 30-Mar-23 30-Apr-23 VISUAL OK
- - 30-Mar-23 30-Apr-23

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23 KONDISI
- - 28-Dec-22 28-Jan-23 VISUAL OK
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
- - 28-Dec-22 28-Jan-23
ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
KONDISI
- - 23-Feb-23 23-Mar-23 VISUAL OK
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23
- - 23-Feb-23 23-Mar-23

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23 KONDISI
- - 22-Feb-23 22-Mar-23 VISUAL OK

- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
- - 22-Feb-23 22-Mar-23
INSPECTION TOOLS AND PPE RESULT MARCH 2023

PROJECT : H-391, H-392, H-394 & H-395


DATE : 30-Mar-2023
COMPANY : PT. Elsindo
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 EL-WC-01 EL-GH-01 EL-PG-01 - EL-PC-01 - - EL-FBH-01
2 EL-WC-02 EL-GH-02 EL-PG-02 - EL-PC-02 - - EL-FBH-02
3 EL-WC-03 EL-GH-03 EL-PG-03 - EL-PC-03 - - EL-FBH-03
4 EL-WC-04 EL-GH-04 EL-PG-04 - EL-PC-04 - - -
5 EL-WC-05 - EL-PG-05 - EL-PC-05 - - -
ULT MARCH 2023

INSPECT EXPIRE
REMARKS
DATE DATE
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
KONDISI
30-Mar-23 30-Apr-23
VISUAL OK
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE RESULT FEBRUARY

PROJECT : H-390
DATE : 23-Feb-2023
COMPANY :: PT. BBU
INSPECTION BY : : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BBU-WC-01 BBU-GH-01 BBU-PG-01 - BBU-PC-01 BBU-LC-01 -
2 BBU-WC-02 BBU-GH-02 BBU-PG-02 - BBU-PC-02 BBU-LC-02 -
3 BBU-WC-03 BBU-GH-03 - - BBU-PC-03 BBU-LC-03 -
4 BBU-WC-04 BBU-GH-04 - - BBU-PC-04 - -
5 BBU-WC-05 - - - - - -
6 BBU-WC-06 - - - - - -
7 BBU-WC-07 - - - - - -
8 BBU-WC-08 - - - - - -
9 BBU-WC-09 - - - - - -
10 BBU-WC-10 - - - - - -
11 BBU-WC-11 - - - - - -
12 BBU-WC-12 - - - - - -

PROJECT : H-378
DATE : 27-Mar-2023
COMPANY :: PT. BBU
INSPECTION BY : : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BBU-WC-01 BBU-GH-01 BBU-PG-01 BBU-CT-01 BBU-PC-01 BBU-LC-01 -
2 BBU-WC-02 BBU-GH-02 BBU-PG-02 BBU-CT-02 BBU-PC-02 BBU-LC-02 -
3 BBU-WC-03 BBU-GH-03 BBU-PG-03 BBU-CT-03 BBU-PC-03 BBU-LC-03 -
4 BBU-WC-04 BBU-GH-04 BBU-PG-04 BBU-CT-04 BBU-PC-04 BBU-LC-04 -
5 BBU-WC-05 BBU-GH-05 BBU-PG-05 BBU-CT-05 BBU-PC-05 BBU-LC-05 -
6 BBU-WC-06 BBU-GH-06 BBU-PG-06 BBU-CT-06 BBU-PC-06 BBU-LC-06 -
7 BBU-WC-07 BBU-GH-07 BBU-PG-07 BBU-CT-07 BBU-PC-07 BBU-LC-07 -
8 BBU-WC-08 BBU-GH-08 BBU-PG-08 BBU-CT-08 BBU-PC-08 BBU-LC-08 -
9 BBU-WC-09 BBU-GH-09 BBU-PG-09 BBU-CT-09 BBU-PC-09 BBU-LC-09 -
10 BBU-WC-10 BBU-GH-10 BBU-PG-10 BBU-CT-10 BBU-PC-10 BBU-LC-10 -
11 BBU-WC-11 BBU-GH-11 BBU-PG-11 BBU-CT-11 BBU-PC-11 - -
12 BBU-WC-12 - BBU-PG-12 - BBU-PC-12 - -
13 BBU-WC-13 - BBU-PG-13 - - - -
14 BBU-WC-14 - BBU-PG-14 - - - -
15 BBU-WC-15 - BBU-PG-15 - - - -
16 BBU-WC-16 - - - - - -
17 BBU-WC-17 - - - - - -
RESULT FEBRUARY 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23 KONDISI
- 23-Feb-23 23-Mar-23 VISUAL OK
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23
- 23-Feb-23 23-Mar-23

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
KONDISI
- 27-Mar-23 27-Apr-23
VISUAL OK
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
- 27-Mar-23 27-Apr-23
INSPECTION TOOLS AND PPE RESULT JANUARY 2023

PROJECT : H-399
DATE : 19-Feb-2023
COMPANY : PT. RSA
INSPECTION BY : Redingse
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 RSA-WC-01 RSA-GH-01 RSA-PG-01 RSA-CT-01 RSA-PC-01 RSA-LC-01 - -
2 RSA-WC-02 RSA-GH-02 RSA-PG-02 RSA-CT-02 RSA-PC-02 RSA-LC-02 - -
3 RSA-WC-03 RSA-GH-03 RSA-PG-03 RSA-CT-03 RSA-PC-03 RSA-LC-03 - -
4 RSA-WC-04 RSA-GH-04 - RSA-CT-04 RSA-PC-04 RSA-LC-04 - -
5 RSA-WC-05 RSA-GH-05 - RSA-CT-05 RSA-PC-05 RSA-LC-05 - -
6 RSA-WC-06 RSA-GH-06 - RSA-CT-06 - - - -
7 RSA-WC-07 - - - - - - -
8 RSA-WC-08 - - - - - - -
9 RSA-WC-09 - - - - - - -
10 RSA-WC-10 - - - - - - -

PROJECT : H-394, H-395, H-399 & H-410


DATE : 30-Mar-2023
COMPANY : PT. RSA
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL BODY
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL HARNES
1 RSA-WC-01 RSA-GH-01 RSA-PG-01 RSA-CT-01 RSA-PC-01 RSA-LC-01 - RSA-FBH-01
2 RSA-WC-02 RSA-GH-02 RSA-PG-02 RSA-CT-02 RSA-PC-02 RSA-LC-02 - RSA-FBH-02
3 RSA-WC-03 RSA-GH-03 RSA-PG-03 RSA-CT-03 RSA-PC-03 RSA-LC-03 - RSA-FBH-03
4 RSA-WC-04 RSA-GH-04 RSA-PG-04 RSA-CT-04 RSA-PC-04 RSA-LC-04 - RSA-FBH-04
5 RSA-WC-05 RSA-GH-05 RSA-PG-05 RSA-CT-05 RSA-PC-05 RSA-LC-05 - RSA-FBH-05
6 RSA-WC-06 RSA-GH-06 RSA-PG-06 RSA-CT-06 RSA-PC-06 RSA-LC-06 - RSA-FBH-06
7 RSA-WC-07 RSA-GH-07 - RSA-CT-07 - RSA-LC-07 - -
8 RSA-WC-08 RSA-GH-08 - RSA-CT-08 - RSA-LC-08 - -
9 RSA-WC-09 RSA-GH-09 - RSA-CT-09 - - - -
10 RSA-WC-10 RSA-GH-10 - RSA-CT-10 - - - -
11 RSA-WC-11 RSA-GH-11 - RSA-CT-11 - - - -
12 RSA-WC-12 RSA-GH-12 - RSA-CT-12 - - - -
13 RSA-WC-13 RSA-GH-13 - RSA-CT-13 - - - -
14 RSA-WC-14 RSA-GH-14 - - - - - -
15 RSA-WC-15 - - - - - - -
16 RSA-WC-16 - - - - - - -
17 RSA-WC-17 - - - - - - -
18 RSA-WC-18 - - - - - - -
19 RSA-WC-19 - - - - - - -
20 RSA-WC-20 - - - - - - -
T JANUARY 2023

INSPECT EXPIRE
REMARKS
DATE DATE
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23 KONDISI
19-Feb-23 19-Mar-23 VISUAL OK

19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23
19-Feb-23 19-Mar-23

INSPECT EXPIRE
REMARKS
DATE DATE
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23 KONDISI
30-Mar-23 30-Apr-23 VISUAL OK
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
30-Mar-23 30-Apr-23
INSPECTION TOOLS AND PPE RESULT JANUARY 202

PROJECT : H-379
DATE : 21-Feb-2023
COMPANY : PT. BMP
INSPECTION BY : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BMP-WC-01 BMP-GH-01 BMP-PG-01 BMP-CT-01 BMP-PC-01 - -
2 BMP-WC-02 BMP-GH-02 BMP-PG-02 BMP-CT-02 BMP-PC-02 - -
3 BMP-WC-03 BMP-GH-03 BMP-PG-03 BMP-CT-03 BMP-PC-03 - -
4 BMP-WC-04 BMP-GH-04 BMP-PG-04 BMP-CT-04 BMP-PC-04 - -
5 BMP-WC-05 - BMP-PG-05 - BMP-PC-05 - -
6 BMP-WC-06 - BMP-PG-06 - BMP-PC-06 - -
7 BMP-WC-07 - BMP-PG-07 - BMP-PC-07 - -
8 BMP-WC-08 - BMP-PG-08 - BMP-PC-08 - -
9 BMP-WC-09 - BMP-PG-09 - BMP-PC-09 - -
10 - - BMP-PG-10 - BMP-PC-10 - -
11 - - BMP-PG-11 - BMP-PC-11 - -
12 - - BMP-PG-12 - BMP-PC-12 - -
13 - - BMP-PG-13 - BMP-PC-13 - -

PROJECT : H-403 & H-404


DATE : 28-Mar-2023
COMPANY : PT. BMP
INSPECTION BY : Ranto Nasution
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BMP-WC-01 BMP-GH-01 BMP-PG-01 BMP-CT-01 BMP-PC-01 BMP-LC-01 -
2 BMP-WC-02 BMP-GH-02 BMP-PG-02 BMP-CT-02 BMP-PC-02 BMP-LC-02 -
3 BMP-WC-03 BMP-GH-03 BMP-PG-03 BMP-CT-03 BMP-PC-03 BMP-LC-03 -
4 BMP-WC-04 BMP-GH-04 BMP-PG-04 BMP-CT-04 BMP-PC-04 BMP-LC-04 -
5 BMP-WC-05 BMP-GH-05 BMP-PG-05 BMP-CT-05 BMP-PC-05 BMP-LC-05 -
6 BMP-WC-06 - BMP-PG-06 - BMP-PC-06 BMP-LC-06 -
7 BMP-WC-07 - BMP-PG-07 - BMP-PC-07 BMP-LC-07 -
8 BMP-WC-08 - BMP-PG-08 - BMP-PC-08 BMP-LC-08 -
9 BMP-WC-09 - BMP-PG-09 - BMP-PC-09 BMP-LC-09 -
10 BMP-WC-10 - BMP-PG-10 - BMP-PC-10 BMP-LC-10 -
11 - - - - BMP-PC-11 - -
12 - - - - BMP-PC-12 - -
13 - - - - BMP-PC-13 - -
PE RESULT JANUARY 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
KONDISI
- 21-Feb-23 21-Mar-23 VISUAL OK
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23
- 21-Feb-23 21-Mar-23

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
BMP-FBH-01 28-Mar-23 28-Apr-23
BMP-FBH-02 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
KONDISI
- 28-Mar-23 28-Apr-23
VISUAL OK
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
- 28-Mar-23 28-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 2023

PROJECT : BG Marcopolo 330


DATE : 9-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Sutrisman
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 ASS-WC-01 ASS-GH-01 ASS-PG-01 ASS-CT-01 ASS-PC-01 - ASS-EP-01
2 ASS-WC-02 ASS-GH-02 ASS-PG-02 ASS-CT-02 ASS-PC-02 - ASS-EP-02
3 ASS-WC-03 ASS-GH-03 ASS-PG-03 ASS-CT-03 ASS-PC-03 - ASS-EP-03
4 ASS-WC-04 ASS-GH-04 ASS-PG-04 ASS-CT-04 ASS-PC-04 - -
5 ASS-WC-05 ASS-GH-05 ASS-PG-05 - - - -
6 - - ASS-PG-06 - - - -
7 - - ASS-PG-07 - - - -
8 - - ASS-PG-08 - - - -
9 - - ASS-PG-09 - - - -
10 - - ASS-PG-10 - - - -
11 - - ASS-PG-11 - - - -
12 - - ASS-PG-12 - - - -

PROJECT : MV Intan Daya 288 & TB Limin Handler


DATE : 20-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 ASS-WC-01 ASS-GH-01 - ASS-CT-01 ASS-PC-01 - -
2 ASS-WC-02 ASS-GH-02 - ASS-CT-02 ASS-PC-02 - -
3 ASS-WC-03 ASS-GH-03 - ASS-CT-03 - - -
4 ASS-WC-04 - - ASS-CT-04 - - -
5 ASS-WC-05 - - ASS-CT-05 - - -
6 ASS-WC-06 - - - - - -

PROJECT : MV Intan Daya 288 & TB Limin Handler


DATE : 25-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 ASS-WC-01 - - - - - -
2 ASS-WC-02 - - - - - -
3 ASS-WC-03 - - - - - -
PE RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23 KONDISI
- 9-Mar-23 9-Apr-23 VISUAL OK
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23
- 9-Mar-23 9-Apr-23

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 20-Mar-23 20-Apr-23
- 20-Mar-23 20-Apr-23
- 20-Mar-23 20-Apr-23 KONDISI
- 20-Mar-23 20-Apr-23 VISUAL OK
- 20-Mar-23 20-Apr-23
- 20-Mar-23 20-Apr-23

BODY INSPECT EXPIRE


REMARKS
REMARKS
HARNES DATE DATE
- 25-Mar-23 25-Apr-23
KONDISI
- 25-Mar-23 25-Apr-23 VISUAL OK
- 25-Mar-23 25-Apr-23
INSPECTION TOOLS AND PPE RESULT MARCH 202

PROJECT : BG Marcopolo 330 & NAP 2701


DATE : 29-Mar-2023
COMPANY : PT. Borsa Multi Rezeki
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BMR-WC-01 BMR-GH-01 BMR-PG-01 BMR-CT-01 BMR-PC-01 BMR-LC-01 BMR-EP-01
2 BMR-WC-02 BMR-GH-02 BMR-PG-02 BMR-CT-02 BMR-PC-02 BMR-LC-02 -
3 BMR-WC-03 BMR-GH-03 - BMR-CT-03 BMR-PC-03 BMR-LC-03 -
4 BMR-WC-04 BMR-GH-04 - BMR-CT-04 BMR-PC-04 BMR-LC-04 -
5 BMR-WC-05 BMR-GH-05 - BMR-CT-05 BMR-PC-05 BMR-LC-05 -
6 BMR-WC-06 BMR-GH-06 - BMR-CT-06 BMR-PC-06 BMR-LC-06 -
7 BMR-WC-07 BMR-GH-07 - BMR-CT-07 BMR-PC-07 BMR-LC-07 -
8 BMR-WC-08 BMR-GH-08 - BMR-CT-08 BMR-PC-08 BMR-LC-08 -
9 BMR-WC-09 BMR-GH-09 - BMR-CT-09 BMR-PC-09 - -
10 BMR-WC-10 BMR-GH-10 - BMR-CT-10 BMR-PC-10 - -
11 BMR-WC-11 BMR-GH-11 - BMR-CT-11 - - -
12 BMR-WC-12 - - - - - -
13 BMR-WC-13 - - - - - -
14 BMR-WC-14 - - - - - -
15 BMR-WC-15 - - - - - -
16 BMR-WC-16 - - - - - -
17 BMR-WC-17 - - - - - -
18 BMR-WC-18 - - - - - -
19 BMR-WC-19 - - - - - -
20 BMR-WC-20 - - - - - -
21 BMR-WC-21 - - - - - -
E RESULT MARCH 2023

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
KONDISI
- 29-Mar-23 29-Apr-23
VISUAL OK
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
- 29-Mar-23 29-Apr-23
INSPECTION TOOLS AND PPE RESULT DECEMBER 20

PROJECT : Facility
DATE : 26-Oct-2022
COMPANY :: PT. Bandar Abadi
INSPECTION BY : : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 BA-WC-01 BA-GH-01 BA-PG-01 - - - -
2 BA-WC-02 BA-GH-02 BA-PG-02 - - - -
3 - - - - - - -
4 - - - - - - -
RESULT DECEMBER 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 26-Oct-22 26-Nov-22
- 26-Oct-22 26-Nov-22 KONDISI
- 26-Oct-22 26-Nov-22 VISUAL OK
- 26-Oct-22 26-Nov-22
INSPECTION TOOLS AND PPE RESULT DECEMBER 20

PROJECT : CNC
DATE : 26-Oct-2022
COMPANY :: PT. Bandar Abadi
INSPECTION BY : : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP ELECTRICAL
No
CABLE HOSE GRINDERS TORCH CABLE CABLE PANEL
1 - BA-GH-01 - - - - -
2 - - - - - - -
3 - - - - - - -
4 - - - - - - -
RESULT DECEMBER 2022

BODY INSPECT EXPIRE


REMARKS
HARNES DATE DATE
- 26-Oct-22 26-Nov-22
- 26-Oct-22 26-Nov-22 KONDISI
- 26-Oct-22 26-Nov-22 VISUAL OK
- 26-Oct-22 26-Nov-22
RECORD INSPECTION TOOLS ON MARCH 2023
Plan Actual
No Nama Subcontraktor Inspect By Remarks
Inspection Inspection
1 PT. Leonard Mandiri Indonesia 2-Mar-23 27-Mar-23 Fredmai Hendra Done
2 PT. Levian Cahaya Sukses 2-Mar-23 13-Mar-23 Fredmai Hendra Done
3 PT. Heaven Chrystal 2-Mar-23 27-Mar-23 Fredmai Hendra Done
4 PT. An-Flex Perkasa 2-Mar-23 29-Mar-23 Sutrisman Done
5 PT. Mentari Jaya 2-Mar-23 24-Mar-23 Fredmai Hendra Done
6 PT. Sukses Jonathan 2-Mar-23 27-Mar-23 Fredmai Hendra Done
7 PT. Dwie Marine Indonesia 4-Mar-23 31-Mar-23 Riko Wilson Done
8 PT. Cahaya Marine Indonesia 4-Mar-23 24-Mar-23 Fredmai Hendra Done
9 PT. Karya Manunggal Jaya 4-Mar-23 30-Mar-23 Dedy Manik Done
10 PT. Perintis Sarana Astra 4-Mar-23 27-Mar-23 Fredmai Hendra Done
11 PT. Batam Solusindo Utama 4-Mar-23 29-Mar-23 Chairul Abadi Done
12 PT. Sinar Bendo Abadi 4-Mar-23 27-Mar-23 Fahrinaldi Done
13 PT. Dunia Marindo 4-Mar-23 29-Mar-23 Dedy Manik Done
14 PT.Terindo Harapan Jaya 5-Mar-23 30-Mar-23 Ranto Nasution Done
15 PT. Elsindo Karya Mandiri 5-Mar-23 30-Mar-23 Lamris Manalu Done
16 PT. Bahtera Berkah Utama 5-Mar-23 27-Mar-23 Servasius S Rino Done
17 PT. Rigel Sinar Alam 5-Mar-23 30-Mar-23 Lamris Manalu Done
18 PT. Mutiara Anugrah Selaut 6-Mar-23 30-Mar-23 Lamris Manalu Done
19 PT. Jasa Sempurna Abadi 6-Mar-23 29-Mar-23 Servasius S Rino Done
20 PT. Batam Marindo Engineering 6-Mar-23 29-Mar-23 Julius Done
21 PT. Zelin Mandiri Sukses 6-Mar-23 29-Mar-23 Dedy Manik Done
22 PT. Balwin Megah Persada 8-Mar-23 28-Mar-23 Ranto Nasution Done
23 PT. Mitra Dinamis Sejahtera 8-Mar-23 27-Mar-23 Lamris Manalu Done
24 PT. Alexindo Mitramas Sentosa 8-Mar-23 28-Mar-23 Fahrinaldi Done
25 PT. Borsa Multi Rejeki 8-Mar-23 29-Mar-23 Fredmai Hendra Done
26 PT. Nara Visi Batam 8-Mar-23 31-Mar-23 Julius Done
27 PT. Abqary Sukses Sejahtera 8-Mar-23 9-Mar-23 Sutrisman Done
STOREMAN
INSPECTION TOOLS AND PPE RESULT

PROJECT : TB Limin Handler & MV Intan Daya 288


DATE : 9-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Sutrisman
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 ASS-WC-01 ASS-GH-01 ASS-PG-01 ASS-CT-01 ASS-PC-01 -
2 ASS-WC-02 ASS-GH-02 ASS-PG-02 ASS-CT-02 ASS-PC-02 -
3 ASS-WC-03 ASS-GH-03 ASS-PG-03 ASS-CT-03 ASS-PC-03 -
4 ASS-WC-04 ASS-GH-04 ASS-PG-04 ASS-CT-04 ASS-PC-04 -
5 ASS-WC-05 ASS-GH-05 ASS-PG-05 - - -
6 - - ASS-PG-06 - - -
7 - - ASS-PG-07 - - -
8 - - ASS-PG-08 - - -
9 - - ASS-PG-09 - - -
10 - - ASS-PG-10 - - -
11 - - ASS-PG-11 - - -
12 - - ASS-PG-12 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : SPOB Meranti Daya


DATE : 13-Mar-2023
COMPANY : PT. LCS
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 LCS-WC-01 LCS-GH-01 LCS-PG-01 LCS-CT-01 LCS-PC-01 -
2 - - LCS-PG-02 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : MV Intan Daya 288 & TB Limin Handler


DATE : 20-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 ASS-WC-01 ASS-GH-01 - ASS-CT-01 ASS-PC-01 -
2 ASS-WC-02 ASS-GH-02 - ASS-CT-02 ASS-PC-02 -
3 ASS-WC-03 ASS-GH-03 - ASS-CT-03 - -
4 ASS-WC-04 - - ASS-CT-04 - -
5 ASS-WC-05 - - ASS-CT-05 - -
6 ASS-WC-06 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : Repair Project


DATE : 24-Mar-2023
COMPANY : PT. CMI
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 CMI-WC-01 CMI-GH-01 - CMI-CT-01 CMI-PC-01 CMI-LC-01
2 CMI-WC-02 CMI-GH-02 - CMI-CT-02 CMI-PC-02 CMI-LC-02
3 CMI-WC-03 CMI-GH-03 - CMI-CT-03 CMI-PC-03 CMI-LC-03
4 CMI-WC-04 CMI-GH-04 - CMI-CT-04 CMI-PC-04 CMI-LC-04
5 CMI-WC-05 CMI-GH-05 - CMI-CT-05 CMI-PC-05 CMI-LC-05
6 CMI-WC-06 CMI-GH-06 - CMI-CT-06 - CMI-LC-06
7 CMI-WC-07 CMI-GH-07 - CMI-CT-07 - CMI-LC-07
8 CMI-WC-08 CMI-GH-08 - CMI-CT-08 - -

9 CMI-WC-09 CMI-GH-09 - CMI-CT-09 - -

10 CMI-WC-10 CMI-GH-10 - CMI-CT-10 - -

11 CMI-WC-11 CMI-GH-11 - CMI-CT-11 - -

12 CMI-WC-12 CMI-GH-12 - CMI-CT-12 - -

13 CMI-WC-13 CMI-GH-13 - CMI-CT-13 - -

14 CMI-WC-14 CMI-GH-14 - CMI-CT-14 - -

15 CMI-WC-15 - - - - -

16 CMI-WC-16 - - - - -

17 CMI-WC-17 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : MV Intan Daya 288 & TB Limin Handler


DATE : 25-Mar-2023
COMPANY : PT. Abqary Sukses Sejahtera
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 ASS-WC-01 - - - - -
2 ASS-WC-02 - - - - -
3 ASS-WC-03 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : MV Sinar Penida


DATE : 24-Mar-2023
COMPANY : PT. Mentari Jaya
INSPECTION BY : Fredmai Hendra Tobing
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 MJ-WC-01 MJ-GH-01 MJ-PG-01 MJ-CT-01 MJ-PC-01 MJ-LC-01
2 MJ-WP-01 - MJ-PG-02 - MJ-PC-02 MJ-LC-02
3 MJ-WP-02 - MJ-PG-03 - MJ-PC-03 MJ-LC-03
4 - - MJ-PG-04 - MJ-PC-04 MJ-LC-04
5 - - MJ-PG-05 - MJ-PC-05 MJ-LC-05
6 - - MJ-DG-01 - MJ-PC-06 -
7 - - MJ-DG-02 - - -
8 - - MJ-ED-01 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : SPOB Meranti Daya


DATE : 27-Mar-2023
COMPANY : PT. HC
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 HC-WC-01 HC-GH-01 HC-PG-01 HC-CT-01 HC-PC-01 -
2 HC-WC-02 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : MV Intan Daya 288


DATE : 27-Mar-2023
COMPANY : PT. PSA
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - - - PSA-PC-01 PSA-LC-01
2 - - - - PSA-PC-02 PSA-LC-02
3 - - - - PSA-PC-03 PSA-LC-03
4 - - - - PSA-PC-04 -
5 - - - - PSA-PC-05 -
6 - - - - PSA-PC-06 -
7 - - - - - -

8 - - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : TB Limin Handler


DATE : 27-Mar-2023
COMPANY : LMI
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - LMI/GH/01 LMI/PG/01 LMI/CT/01 LMI/PC/01 -
2 - - LMI/PG/02 - LMI/PC/02 -
3 - - LMI/PG/03 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-378
DATE : 27-Mar-2023
COMPANY : PT. BBU
INSPECTION BY : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BBU-WC-01 BBU-GH-01 BBU-PG-01 BBU-CT-01 BBU-PC-01 BBU-LC-01
2 BBU-WC-02 BBU-GH-02 BBU-PG-02 BBU-CT-02 BBU-PC-02 BBU-LC-02
3 BBU-WC-03 BBU-GH-03 BBU-PG-03 BBU-CT-03 BBU-PC-03 BBU-LC-03

4 BBU-WC-04 BBU-GH-04 BBU-PG-04 BBU-CT-04 BBU-PC-04 BBU-LC-04


5 BBU-WC-05 BBU-GH-05 BBU-PG-05 BBU-CT-05 BBU-PC-05 BBU-LC-05
6 BBU-WC-06 BBU-GH-06 BBU-PG-06 BBU-CT-06 BBU-PC-06 BBU-LC-06
7 BBU-WC-07 BBU-GH-07 BBU-PG-07 BBU-CT-07 BBU-PC-07 BBU-LC-07
8 BBU-WC-08 BBU-GH-08 BBU-PG-08 BBU-CT-08 BBU-PC-08 BBU-LC-08
9 BBU-WC-09 BBU-GH-09 BBU-PG-09 BBU-CT-09 BBU-PC-09 BBU-LC-09

10 BBU-WC-10 BBU-GH-10 BBU-PG-10 BBU-CT-10 BBU-PC-10 BBU-LC-10

11 BBU-WC-11 BBU-GH-11 BBU-PG-11 BBU-CT-11 BBU-PC-11 -

12 BBU-WC-12 - BBU-PG-12 - BBU-PC-12 -


13 BBU-WC-13 - BBU-PG-13 - - -
14 BBU-WC-14 - BBU-PG-14 - - -
15 BBU-WC-15 - BBU-PG-15 - - -
16 BBU-WC-16 - - - - -
17 BBU-WC-17 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-409
DATE : 27-Mar-2023

COMPANY : PT. MSM


INSPECTION BY : Fahrinaldi
No WELDING GAS PORTABLE CUTING POWER LAMP
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 MSM-WC-01 MSM-GH-01 MSM-PG-01 - MSM-PC-01 MSM-LC-01
2 MSM-WC-02 MSM-GH-02 MSM-PG-02 - MSM-PC-02 MSM-LC-02
3 MSM-WC-03 MSM-GH-03 MSM-PG-03 - MSM-PC-03 MSM-LC-03
4 MSM-WC-04 MSM-GH-04 MSM-PG-04 - MSM-PC-04 MSM-LC-04
5 MSM-WC-05 - MSM-PG-05 - MSM-PC-05 MSM-LC-05
6 MSM-WC-06 - - - MSM-PC-06 -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-391
DATE : 27-Mar-2023
COMPANY : PT. MDS
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 MDS-WC-01 - MDS-PG-01 - MDS-PC-01 -
2 MDS-WC-02 - MDS-PG-02 - MDS-PC-02 -
3 MDS-WC-03 - MDS-PG-03 - MDS-PC-03 -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : SPOB Meranti Daya


DATE : 27-Mar-2023
COMPANY : PT. Sukses Jonathan
INSPECTION BY : Petrus Nggaro
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SJ-WC-01 SJ-GH-01 SJ-PG-01 SJ-CT-01 SJ-PC-01 SJ-LC-01
2 SJ-WC-02 SJ-GH-02 SJ-PG-02 SJ-CT-02 SJ-PC-02 SJ-LC-02
3 SJ-WC-03 SJ-GH-03 SJ-PG-03 SJ-CT-03 SJ-PC-03 SJ-LC-03
4 SJ-WC-04 SJ-GH-04 - SJ-CT-04 SJ-PC-04 SJ-LC-04
5 SJ-WC-05 - - - SJ-PC-05 -
6 SJ-WC-06 - - - - -
7 SJ-WC-07 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-403 & H-404


DATE : 28-Mar-2023
COMPANY : PT. BMP
INSPECTION BY : Ranto Nasution
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BMP-WC-01 BMP-GH-01 BMP-PG-01 BMP-CT-01 BMP-PC-01 BMP-LC-01
2 BMP-WC-02 BMP-GH-02 BMP-PG-02 BMP-CT-02 BMP-PC-02 BMP-LC-02
3 BMP-WC-03 BMP-GH-03 BMP-PG-03 BMP-CT-03 BMP-PC-03 BMP-LC-03
4 BMP-WC-04 BMP-GH-04 BMP-PG-04 BMP-CT-04 BMP-PC-04 BMP-LC-04
5 BMP-WC-05 BMP-GH-05 BMP-PG-05 BMP-CT-05 BMP-PC-05 BMP-LC-05
6 BMP-WC-06 - BMP-PG-06 - BMP-PC-06 BMP-LC-06
7 BMP-WC-07 - BMP-PG-07 - BMP-PC-07 BMP-LC-07
8 BMP-WC-08 - BMP-PG-08 - BMP-PC-08 BMP-LC-08
9 BMP-WC-09 - BMP-PG-09 - BMP-PC-09 BMP-LC-09
10 BMP-WC-10 - BMP-PG-10 - BMP-PC-10 BMP-LC-10
11 - - - - BMP-PC-11 -
12 - - - - BMP-PC-12 -
13 - - - - BMP-PC-13 -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-413 & H-414


DATE : 28-Mar-2023
COMPANY : PT. AMS
INSPECTION BY : Fahrinaldi
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AMS-WC-01 AMS-GH-01 AMS-PG-01 - - AMS-LC-01
2 AMS-WC-02 AMS-GH-02 AMS-PG-02 - - AMS-LC-02
3 AMS-WC-03 AMS-GH-03 AMS-PG-03 - - AMS-LC-03
4 AMS-WC-04 AMS-GH-04 AMS-PG-04 - - AMS-LC-04

5 AMS-WC-05 AMS-GH-05 - - - AMS-LC-05

6 AMS-WC-06 AMS-GH-06 - - - AMS-LC-06

7 AMS-WC-07 AMS-GH-07 - - - -

8 AMS-WC-08 - - - - -
9 AMS-WC-09 - - - - -

10 AMS-WC-10 - - - - -

11 AMS-WC-11 - - - - -

12 AMS-WC-12 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : MV Intan Daya 288


DATE : 29-Mar-23
COMPANY : PT. An-Flex
INSPECTION BY : Sutrisman
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - Anflex-GH-01 Anflex-PG-01 Anflex-CT-01 Anflex-PC-01 -
2 - Anflex-GH-02 Anflex-PG-02 Anflex-CT-02 Anflex-PC-02 -
3 - - Anflex-PG-03 - - -
4 - - Anflex-PG-04 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-379, H-394 & 395


DATE : 29-Mar-2023
COMPANY : PT. BSU
INSPECTION BY : Chairul Abadi
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - BSU-PG-01 - BSU-PC-01 BSU-LC-01
2 - - BSU-PG-02 - BSU-PC-02 BSU-LC-02
3 - - BSU-PG-03 - BSU-PC-03 BSU-LC-03
4 - - BSU-PG-04 - BSU-PC-04 BSU-LC-04
5 - - BSU-PG-05 - BSU-PC-05 BSU-LC-05
6 - - BSU-PG-06 - BSU-PC-06 BSU-LC-06
7 - - BSU-PG-07 - BSU-PC-07 BSU-LC-07
8 - - BSU-PG-08 - BSU-PC-08 BSU-LC-08
9 - - BSU-PG-09 - BSU-PC-09 BSU-LC-09
10 - - BSU-PG-10 - BSU-PC-10 BSU-LC-10
11 - - - - - BSU-LC-11
12 - - - - - BSU-LC-12
13 - - - - - BSU-LC-13
14 - - - - - BSU-LC-14
15 - - - - - BSU-LC-15
INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-386
DATE : 29-Mar-2023
COMPANY : PT. SBA
INSPECTION BY : Dedy Manik
No WELDING GAS PORTABLE CUTING POWER LAMP
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 SBA-WC-01 - SBA-PG-01 - SBA-PC-01 SBA-LC-01
2 SBA-WC-02 - SBA-PG-02 - SBA-PC-02 SBA-LC-02
3 SBA-WC-03 - SBA-PG-03 - SBA-PC-03 SBA-LC-03
4 SBA-WC-04 - SBA-PG-04 - SBA-PC-04 SBA-LC-04
5 SBA-WC-05 - SBA-PG-05 - SBA-PC-05 SBA-LC-05
6 SBA-WC-06 - SBA-PG-06 - SBA-PC-06 SBA-LC-06
7 SBA-WC-07 - SBA-PG-07 - SBA-PC-07 SBA-LC-07
8 SBA-WC-08 - - - SBA-PC-08 -
9 SBA-WC-09 - - - SBA-PC-09 -
10 SBA-WC-10 - - - SBA-PC-10 -
11 - - - - - -
12 - - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-379
DATE : 29-Mar-23
COMPANY : PT. JSA
INSPECTION BY : Servasius Rino
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 JSA-WC-01 JSA-GH-01 JSA-PG-01 JSA-CT-01 JSA-PC-01 JSA-LC-01
2 JSA-WC-02 JSA-GH-02 JSA-PG-02 JSA-CT-02 JSA-PC-02 JSA-LC-02
3 JSA-WC-03 JSA-GH-03 JSA-PG-03 JSA-CT-03 JSA-PC-03 JSA-LC-03
4 JSA-WC-04 JSA-GH-04 JSA-PG-04 JSA-CT-04 JSA-PC-04 JSA-LC-04
5 JSA-WC-05 JSA-GH-05 JSA-PG-05 JSA-CT-05 JSA-PC-05 JSA-LC-05
6 JSA-WC-06 JSA-GH-06 JSA-PG-06 JSA-CT-06 JSA-PC-06 JSA-LC-06
7 JSA-WC-07 JSA-GH-07 JSA-PG-07 JSA-CT-07 JSA-PC-07 JSA-LC-07
8 JSA-WC-08 JSA-GH-08 JSA-PG-08 JSA-CT-08 JSA-PC-08 JSA-LC-08
9 JSA-WC-09 JSA-GH-09 JSA-PG-09 JSA-CT-09 JSA-PC-09 JSA-LC-09
10 JSA-WC-10 JSA-GH-10 JSA-PG-10 JSA-CT-10 JSA-PC-10 JSA-LC-10
11 JSA-WC-11 JSA-GH-11 JSA-PG-11 JSA-CT-11 JSA-PC-11 JSA-LC-11
12 JSA-WC-12 JSA-GH-12 JSA-PG-12 JSA-CT-12 JSA-PC-12 JSA-LC-12
13 JSA-WC-13 JSA-GH-13 JSA-PG-13 JSA-CT-13 JSA-PC-13 JSA-LC-13
14 JSA-WC-14 JSA-GH-14 JSA-PG-14 JSA-CT-14 JSA-PC-14 JSA-LC-14
15 JSA-WC-15 JSA-GH-15 JSA-PG-15 JSA-CT-15 JSA-PC-15 JSA-LC-15
16 JSA-WC-16 JSA-GH-16 - JSA-CT-16 - -
17 JSA-WC-17 JSA-GH-17 - JSA-CT-17 - -
18 JSA-WC-18 JSA-GH-18 - JSA-CT-18 - -
19 JSA-WC-19 JSA-GH-19 - JSA-CT-19 - -
20 JSA-WC-20 JSA-GH-20 - JSA-CT-20 - -
21 JSA-WC-21 JSA-GH-21 - JSA-CT-21 - -
22 JSA-WC-22 JSA-GH-22 - JSA-CT-22 - -
23 JSA-WC-23 JSA-GH-23 - JSA-CT-23 - -
24 JSA-WC-24 JSA-GH-24 - JSA-CT-24 - -
25 JSA-WC-25 JSA-GH-25 - JSA-CT-25 - -
26 JSA-WC-26 JSA-GH-26 - JSA-CT-26 - -
27 JSA-WC-27 JSA-GH-27 - JSA-CT-27 - -
28 JSA-WC-28 JSA-GH-28 - JSA-CT-28 - -
29 JSA-WC-29 JSA-GH-29 - JSA-CT-29 - -
30 JSA-WC-30 JSA-GH-30 - JSA-CT-30 - -
31 JSA-WC-31 - - - - -
32 JSA-WC-32 - - - - -
33 JSA-WC-33 - - - - -
34 JSA-WC-34 - - - - -
35 JSA-WC-35 - - - - -
36 JSA-WC-36 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-388
DATE : 29-Mar-2023
COMPANY : PT. AMS
INSPECTION BY : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 AMS-WC-01 AMS-GH-01 AMS-PG-01 - AMS-PC-01 -
2 AMS-WC-02 AMS-GH-02 AMS-PG-02 - AMS-PC-02 -
3 AMS-WC-03 AMS-GH-03 AMS-PG-03 - AMS-PC-03 -
4 AMS-WC-04 AMS-GH-04 AMS-PG-04 - AMS-PC-04 -
5 AMS-WC-05 AMS-GH-05 - - AMS-PC-05 -
6 AMS-WC-06 AMS-GH-06 - - AMS-PC-06 -
7 AMS-WC-07 - - - AMS-PC-07 -
8 AMS-WC-08 - - - - -
9 AMS-WC-09 - - - - -
10 AMS-WC-10 - - - - -
11 AMS-WC-11 - - - - -
12 AMS-WC-12 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-405 & H-406


DATE : 29-Mar-2023
COMPANY : PT. KMJ
INSPECTION BY : Ranto Nasuition
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 - KMJ-PC-01 KMJ-LC-01
2 KMJ-WC-02 KMJ-GH-02 - - KMJ-PC-02 KMJ-LC-02
3 KMJ-WC-03 - - - KMJ-PC-03 -
4 KMJ-WC-04 - - - - -
5 KMJ-WC-05 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-391, H-394 & H-395


DATE : 29-Mar-2023

COMPANY : PT. BME


INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BME-WC-01 - BME-PG-01 - BME-PC-01 BME-LC-01
2 BME-WC-02 - BME-PG-02 - BME-PC-02 BME-LC-02
3 BME-WC-03 - BME-PG-03 - BME-PC-03 BME-LC-03
4 BME-WC-04 - BME-PG-04 - BME-PC-04 BME-LC-04
5 - - BME-PG-05 - BME-PC-05 BME-LC-05
6 - - BME-PG-06 - BME-PC-06 -
7 - - BME-PD-01 - BME-PC-07 -
8 - - BME-PD-02 - - -
9 - - BME-PD-03 - - -
10 - - BME-PD-04 - - -
11 - - BME-PD-05 - - -
12 - - BME-PD-06 - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : BG Marcopolo 330 & NAP 2701


DATE : 29-Mar-2023
COMPANY : PT. Borsa Multi Rezeki
INSPECTION BY : Fredmai Hendra
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 BMR-WC-01 BMR-GH-01 BMR-PG-01 BMR-CT-01 BMR-PC-01 BMR-LC-01
2 BMR-WC-02 BMR-GH-02 BMR-PG-02 BMR-CT-02 BMR-PC-02 BMR-LC-02
3 BMR-WC-03 BMR-GH-03 - BMR-CT-03 BMR-PC-03 BMR-LC-03
4 BMR-WC-04 BMR-GH-04 - BMR-CT-04 BMR-PC-04 BMR-LC-04
5 BMR-WC-05 BMR-GH-05 - BMR-CT-05 BMR-PC-05 BMR-LC-05
6 BMR-WC-06 BMR-GH-06 - BMR-CT-06 BMR-PC-06 BMR-LC-06
7 BMR-WC-07 BMR-GH-07 - BMR-CT-07 BMR-PC-07 BMR-LC-07
8 BMR-WC-08 BMR-GH-08 - BMR-CT-08 BMR-PC-08 BMR-LC-08
9 BMR-WC-09 BMR-GH-09 - BMR-CT-09 BMR-PC-09 -
10 BMR-WC-10 BMR-GH-10 - BMR-CT-10 BMR-PC-10 -
11 BMR-WC-11 BMR-GH-11 - BMR-CT-11 - -
12 BMR-WC-12 - - - - -
13 BMR-WC-13 - - - - -
14 BMR-WC-14 - - - - -
15 BMR-WC-15 - - - - -
16 BMR-WC-16 - - - - -
17 BMR-WC-17 - - - - -
18 BMR-WC-18 - - - - -
19 BMR-WC-19 - - - - -
20 BMR-WC-20 - - - - -
21 BMR-WC-21 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-378 & H-379


DATE : 29-Mar-2023
COMPANY : PT. Dunia Marindo
INSPECTION BY : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 DM-WC-01 DM-GH-01 DM-PG-01 - DM-PC-01 -
2 DM-WC-02 DM-GH-02 DM-PG-02 - DM-PC-02 -
3 DM-WC-03 - DM-PG-03 - DM-PC-03 -
4 DM-WC-04 - DM-PG-04 - DM-PC-04 -
5 DM-WC-05 - DM-PG-05 - - -
6 DM-WC-06 - DM-PG-06 - - -
7 DM-WC-07 - DM-PG-07 - - -
8 - - DM-PG-08 - - -
INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-387
DATE : 29-Mar-2023
COMPANY : PT. ZMS
INSPECTION BY : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 ZMS-WC-01 ZMS-GH-01 ZMS-PG-01 - ZMS-PC-01 ZMS-LC-01
2 ZMS-WC-02 ZMS-GH-02 ZMS-PG-02 - ZMS-PC-02 ZMS-LC-02
3 ZMS-WC-03 ZMS-GH-03 ZMS-PG-03 - ZMS-PC-03 ZMS-LC-03
4 ZMS-WC-04 ZMS-GH-04 ZMS-PG-04 - ZMS-PC-04 ZMS-LC-04
5 ZMS-WC-05 - - - - ZMS-LC-05
6 ZMS-WC-06 - - - - -
7 ZMS-WC-07 - - - - -
8 ZMS-WC-08 - - - - -
9 ZMS-WC-09 - - - - -
10 ZMS-WC-10 - - - - -
11 ZMS-WC-11 - - - - -
12 ZMS-WC-12 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-391, H-394, H-395 & H-403


DATE : 30-Mar-2023
COMPANY : PT. MAS
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 MAS-WC-01 MAS-GH-01 MAS-PG-01 MAS-CT-01 MAS-PC-01 MAS-LC-01
2 MAS-WC-02 MAS-GH-02 MAS-PG-02 MAS-CT-02 MAS-PC-02 MAS-LC-02
3 MAS-WC-03 MAS-GH-03 MAS-PG-03 MAS-CT-03 MAS-PC-03 MAS-LC-03
4 MAS-WC-04 MAS-GH-04 MAS-PG-04 MAS-CT-04 MAS-PC-04 MAS-LC-04
5 MAS-WC-05 MAS-GH-05 MAS-PG-05 MAS-CT-05 MAS-PC-05 MAS-LC-05
6 MAS-WC-06 - MAS-PG-06 - MAS-PC-06 MAS-LC-06
7 MAS-WC-07 - - - MAS-PC-07 -
8 MAS-WC-08 - - - MAS-PC-08 -
9 MAS-WC-09 - - - - -
10 MAS-WC-10 - - - - -

INSPECTION TOOLS AND PPE RESULT M


PROJECT : H-399 & H-405
DATE : 30-Mar-2023
COMPANY : PT. THJ
INSPECTION BY : Ranto Nasution
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 THJ-WC-01 THJ-GH-01 THJ-PG-01 THJ-CT-01 THJ-PC-01 THJ-LC-01
2 THJ-WC-02 THJ-GH-02 THJ-PG-02 THJ-CT-02 THJ-PC-02 THJ-LC-02
3 THJ-WC-03 THJ-GH-03 THJ-PG-03 THJ-CT-03 THJ-PC-03 THJ-LC-03
4 - - - - THJ-PC-04 THJ-LC-04

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-391 & H-392


DATE : 30-Mar-2023
COMPANY : PT. KMJ
INSPECTION BY : Julius
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 - KMJ-PC-01 KMJ-LC-01
2 KMJ-WC-02 KMJ-GH-02 KMJ-PG-02 - KMJ-PC-02 KMJ-LC-02
3 KMJ-WC-03 - KMJ-PG-03 - KMJ-PC-03 KMJ-LC-03
4 KMJ-WC-04 - - - KMJ-PC-04 KMJ-LC-04
5 KMJ-WC-05 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-389 & H-400


DATE : 30-Mar-2023
COMPANY : PT. KMJ
INSPECTION BY : Dedy Manik
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 KMJ-WC-01 KMJ-GH-01 KMJ-PG-01 - KMJ-PC-01 KMJ-LC-01
2 KMJ-WC-02 KMJ-GH-02 KMJ-PG-02 - KMJ-PC-02 KMJ-LC-02
3 KMJ-WC-03 KMJ-GH-03 KMJ-PG-03 - KMJ-PC-03 KMJ-LC-03
4 KMJ-WC-04 KMJ-GH-04 KMJ-PG-04 - KMJ-PC-04 KMJ-LC-04
5 KMJ-WC-05 KMJ-GH-05 KMJ-PG-05 - - -
6 KMJ-WC-06 KMJ-GH-06 - - - -
7 KMJ-WC-07 - - - - -
8 KMJ-WC-08 - - - - -
9 KMJ-WC-09 - - - - -

10 KMJ-WC-10 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-394, H-395, H-399 & H-410


DATE : 30-Mar-2023
COMPANY : PT. RSA
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 RSA-WC-01 RSA-GH-01 RSA-PG-01 RSA-CT-01 RSA-PC-01 RSA-LC-01
2 RSA-WC-02 RSA-GH-02 RSA-PG-02 RSA-CT-02 RSA-PC-02 RSA-LC-02
3 RSA-WC-03 RSA-GH-03 RSA-PG-03 RSA-CT-03 RSA-PC-03 RSA-LC-03
4 RSA-WC-04 RSA-GH-04 RSA-PG-04 RSA-CT-04 RSA-PC-04 RSA-LC-04
5 RSA-WC-05 RSA-GH-05 RSA-PG-05 RSA-CT-05 RSA-PC-05 RSA-LC-05
6 RSA-WC-06 RSA-GH-06 RSA-PG-06 RSA-CT-06 RSA-PC-06 RSA-LC-06
7 RSA-WC-07 RSA-GH-07 - RSA-CT-07 - RSA-LC-07
8 RSA-WC-08 RSA-GH-08 - RSA-CT-08 - RSA-LC-08
9 RSA-WC-09 RSA-GH-09 - RSA-CT-09 - -
10 RSA-WC-10 RSA-GH-10 - RSA-CT-10 - -
11 RSA-WC-11 RSA-GH-11 - RSA-CT-11 - -
12 RSA-WC-12 RSA-GH-12 - RSA-CT-12 - -
13 RSA-WC-13 RSA-GH-13 - RSA-CT-13 - -
14 RSA-WC-14 RSA-GH-14 - - - -
15 RSA-WC-15 - - - - -
16 RSA-WC-16 - - - - -
17 RSA-WC-17 - - - - -
18 RSA-WC-18 - - - - -
19 RSA-WC-19 - - - - -
20 RSA-WC-20 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-391, H-392, H-394 & H-395


DATE : 30-Mar-2023
COMPANY : PT. Elsindo
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 EL-WC-01 EL-GH-01 EL-PG-01 - EL-PC-01 -
2 EL-WC-02 EL-GH-02 EL-PG-02 - EL-PC-02 -
3 EL-WC-03 EL-GH-03 EL-PG-03 - EL-PC-03 -
4 EL-WC-04 EL-GH-04 EL-PG-04 - EL-PC-04 -
5 EL-WC-05 - EL-PG-05 - EL-PC-05 -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : Repair Project


DATE : 30-Mar-2023
COMPANY : PT. PSA
INSPECTION BY : Petrus Nggaro
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - - - - -
2 - - - - - -
3 - - - - - -
4 - - - - - -
5 - - - - - -
6 - - - - - -
7 - - - - - -
8 - - - - - -
9 - - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-388 & H-389


DATE : 31-Mar-2023
COMPANY : PT. Nara Visi Batam
INSPECTION BY : Julius
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 - - NVB-PG-01 - NVB-PC-01 NVB-LC-01
2 - - NVB-PG-02 - NVB-PC-02 NVB-LC-02
3 - - NVB-PG-03 - NVB-PC-03 NVB-LC-03
4 - - - - NVB-PC-04 NVB-LC-04
5 - - - - NVB-PC-05 NVB-LC-05
6 - - - - NVB-PC-06 NVB-LC-06

INSPECTION TOOLS AND PPE RESULT M

PROJECT : H-394
DATE : 31-Mar-2023
COMPANY : PT. ZMS
INSPECTION BY : Lamris Manalu
WELDING GAS PORTABLE CUTING POWER LAMP
No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 ZMS-WC-01 ZMS-GH-01 ZMS-PG-01 - ZMS-PC-01 ZMS-LC-01
2 ZMS-WC-02 - ZMS-PG-02 - ZMS-PC-02 ZMS-LC-02
3 ZMS-WC-03 - - - ZMS-PC-03 -
4 ZMS-WC-04 - - - - -
5 ZMS-WC-05 - - - - -
6 ZMS-WC-06 - - - - -
7 ZMS-WC-07 - - - - -

INSPECTION TOOLS AND PPE RESULT M

PROJECT H-378
: & H-379
DATE 31-Mar-23
COMPANY PT.
: DMI
INSPECTION BY :Riko Wilson

WELDING GAS PORTABLE CUTING POWER LAMP


No
CABLE HOSE GRINDERS TORCH CABLE CABLE
1 DMI-WC-01 - - - - -
2 DMI-WC-02 - - - - -
3 - - - - - -

Note: Peralatan yang dapat dipergunakan untuk bekerja adalah Peralatan yang telah diinspeksi oleh HSE Personil PT. B
diberikan logo atau sticker inspeksi…!!!
OLS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
ASS-EP-01 - 9-Mar-23 9-Apr-23
ASS-EP-02 - 9-Mar-23 9-Apr-23
ASS-EP-03 - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23 KONDISI
- - 9-Mar-23 9-Apr-23 VISUAL OK

- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23
- - 9-Mar-23 9-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- LCS-FBH-01 13-Mar-23 13-Apr-23 KONDISI VISUAL
- - 13-Mar-23 13-Apr-23 OK

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 20-Mar-23 20-Apr-23

KONDISI
VISUAL OK
- - 20-Mar-23 20-Apr-23
- - 20-Mar-23 20-Apr-23 KONDISI
- - VISUAL OK
20-Mar-23 20-Apr-23
- - 20-Mar-23 20-Apr-23
- - 20-Mar-23 20-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
KONDISI
- - 24-Feb-23 24-Apr-23
VISUAL OK
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23
- - 24-Feb-23 24-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 25-Mar-23 25-Apr-23
KONDISI
- - 25-Mar-23 25-Apr-23
VISUAL OK
KONDISI
VISUAL OK
- - 25-Mar-23 25-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- MJ-FBH-01 24-Mar-23 24-Apr-23
- MJ-FBH-02 24-Mar-23 24-Apr-23
- MJ-FBH-03 24-Mar-23 24-Apr-23
- MJ-FBH-04 24-Mar-23 24-Apr-23 KONDISI
- MJ-FBH-06 24-Mar-23 24-Apr-23 VISUAL OK

- - 24-Mar-23 24-Apr-23
- - 24-Mar-23 24-Apr-23
- - 24-Mar-23 24-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 27-Mar-22 27-Apr-22 KONDISI
- 27-Mar-22 27-Apr-22 VISUAL OK
-

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
PSA-EP-01 PSA-BH-01 27-Mar-23 27-Apr-23
- PSA-BH-02 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23

KONDISI
VISUAL OK
- - 27-Mar-23 27-Apr-23 KONDISI
- - 27-Mar-23 27-Apr-23 VISUAL OK

- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
LMI/EP/01 LMI/FBH/01 27-Mar-23 27-Apr-23
KONDIS
LMI/EP/02 LMI/FBH/02 27-Mar-23 27-Apr-23
VISUAL OK
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
KONDISI
- - 27-Mar-23 27-Apr-23
VISUAL OK
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
MSM-EP-01 MSM-FBH-01 27-Mar-23 27-Apr-23
MSM-EP-02 MSM-FBH-02 27-Mar-23 27-Apr-23
- MSM-FBH-03 27-Mar-23 27-Apr-23 KONDISI
- MSM-FBH-04 27-Mar-23 27-Apr-23 VISUAL OK

- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 27-Mar-23 27-Apr-23
KONDISI
- - 27-Mar-23 27-Apr-23
VISUAL OK
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- SJ-FBH-01 27-Mar-23 27-Apr-23
- SJ-FBH-02 27-Mar-23 27-Apr-23
- SJ-FBH-03 27-Mar-23 27-Apr-23
KONDISI
- SJ-FBH-04 27-Mar-23 27-Apr-23
VISUAL OK
KONDISI
VISUAL OK
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23
- - 27-Mar-23 27-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- BMP-FBH-01 28-Mar-23 28-Apr-23
- BMP-FBH-02 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
KONDISI
- - 28-Mar-23 28-Apr-23
VISUAL OK
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
AMS-EP-01 - 28-Mar-23 28-Apr-23
AMS-EP-02 - 28-Mar-23 28-Apr-23
AMS-EP-03 - 28-Mar-23 28-Apr-23
AMS-EP-04 - 28-Mar-23 28-Apr-23
AMS-EP-05 - 28-Mar-23 28-Apr-23
AMS-EP-06 - 28-Mar-23 28-Apr-23 KONDISI
AMS-EP-07 - 28-Mar-23 28-Apr-23 VISUAL OK

AMS-EP-08 - 28-Mar-23 28-Apr-23


KONDISI
VISUAL OK

AMS-EP-09 - 28-Mar-23 28-Apr-23


- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23
- - 28-Mar-23 28-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- Anflex-FBH-01 29-Mar-23 29-Apr-23
- Anflex-FBH-02 29-Mar-23 29-Apr-23 KONDISI
Anflex-FBH-03 29-Mar-23 29-Apr-23 VISUAL OK
-
- Anflex-FBH-04 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
KONDISI
- - 29-Mar-23 29-Apr-23
VISUAL OK
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
SBA-EP-01 SBA-FBH-01 29-Mar-23 29-Apr-23
SBA-EP-02 SBA-FBH-02 29-Mar-23 29-Apr-23
- SBA-FBH-03 29-Mar-23 29-Apr-23
- SBA-FBH-04 29-Mar-23 29-Apr-23
- SBA-FBH-05 29-Mar-23 29-Apr-23
- SBA-FBH-06 29-Mar-23 29-Apr-23 KONDISI
- - 29-Mar-23 29-Apr-23 VISUAL OK

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23 KONDIS
- - 29-Mar-23 29-Apr-23 VISUAL OK

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23 KONDISI


29-Mar-23 29-Apr-23 VISUAL OK
- -
- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
KONDISI
- - 29-Mar-23 29-Apr-23
VISUAL OK
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
BME-EP-01 - 29-Mar-23 29-Apr-23
BME-EP-02 - 29-Mar-23 29-Apr-23
BME-EP-03 - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23 KONDISI
- - 29-Mar-23 29-Apr-23 VISUAL OK

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
BMR-EP-01 - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
KONDISI
- - 29-Mar-23 29-Apr-23
VISUAL OK
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- DM-FBH-01 29-Mar-23 29-Apr-23
- DM-FBH-02 29-Mar-23 29-Apr-23
- DM-FBH-03 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23 KONDISI
- - 29-Mar-23 29-Apr-23 VISUAL OK

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23 KONDISI
- - 29-Mar-23 29-Apr-23 VISUAL OK

- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23
- - 29-Mar-23 29-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23 KONDISI
- - 30-Mar-23 30-Apr-23 VISUAL OK

- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23 KONDISI
- - VISUAL OK
30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
KONDISI
- - 30-Mar-23 30-Apr-23
VISUAL OK
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23 KONDISI
- 30-Mar-23 30-Apr-23 VISUAL OK
-
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
KONDISI
VISUAL OK

- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- RSA-FBH-01 30-Mar-23 30-Apr-23
- RSA-FBH-02 30-Mar-23 30-Apr-23
- RSA-FBH-03 30-Mar-23 30-Apr-23
- RSA-FBH-04 30-Mar-23 30-Apr-23
- RSA-FBH-05 30-Mar-23 30-Apr-23
- RSA-FBH-06 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23 KONDISI
- - 30-Mar-23 30-Apr-23 VISUAL OK

- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- EL-FBH-01 30-Mar-23 30-Apr-23
- EL-FBH-02 30-Mar-23 30-Apr-23
KONDISI
VISUAL OK
KONDISI
- EL-FBH-03 30-Mar-23 30-Apr-23
VISUAL OK
- - 30-Mar-23 30-Apr-23
- - 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- PSA-FBH-01 30-Mar-23 30-Apr-23
- PSA-FBH-02 30-Mar-23 30-Apr-23
- PSA-FBH-03 30-Mar-23 30-Apr-23
- PSA-FBH-04 30-Mar-23 30-Apr-23
KONDISI
- PSA-FBH-05 30-Mar-23 30-Apr-23
VISUAL OK
- PSA-FBH-06 30-Mar-23 30-Apr-23
- PSA-FBH-07 30-Mar-23 30-Apr-23
- PSA-FBH-08 30-Mar-23 30-Apr-23
- PSA-FBH-09 30-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23 KONDISI
- - 31-Mar-23 30-Apr-23 VISUAL OK

- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023


ELECTRICAL BODY INSPECT EXPIRE
REMARKS
PANEL HARNES DATE DATE
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23
KONDISI
- - 31-Mar-23 30-Apr-23
VISUAL OK
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23
- - 31-Mar-23 30-Apr-23

LS AND PPE RESULT MARCH 2023

ELECTRICAL BODY INSPECT EXPIRE


REMARKS
PANEL HARNES DATE DATE
- - 31-Mar-23 30-Apr-23
- - KONDISI
31-Mar-23 30-Apr-23 VISUAL OK
- - 31-Mar-23 30-Apr-23

eksi oleh HSE Personil PT. BA, dan kemudian yang sudah -