17-185/BARC/ P.O.NO. DPS/NRBPSU/03/N1/2605/TPT/MPO/522_ Hold mentioned in drawing PO-57 (EQUP.- 109SRF010005/20005)

skripal@barc.gov.in <skripal@barc.gov.in> Thu, Oct 27, 2022 at 12:12 PM


To: "Sonal S. Sonawane" <sonal.s@temaindia.com>
Cc: Jayank <jayank@barc.gov.in>, VKS <vinods@barc.gov.in>, Shweta Sonawane <shweta.s@temaindia.com>, Sneha Davande <sneha.d@temaindia.com>, Kiran Joshi
<kiran.j@temaindia.com>, Nikhilesh Mishra <nikhileshkumar.m@temaindia.com>, Sameet Gunjal <Sameet.g@temaindia.com>

Dear Madam,

This refers to your trailing mail regarding hold point on elevation of Nozzle F22 and lifting hook of PO item 57(2 equipment). The matter was reviewed by NRB design team. The elevation of
Nozzle F22 and lifting hook mentioned in approved fabrication drawings is acceptable.

Regards,

Kripal Singh

NRB, BARC.

On 27/10/2022 10:38, Sonal S. Sonawane wrote:

Dear Sir,

This is related to PO Sr. no. 57. (2 equipment)

Please refer to the attached snap of approved drawings.  Please note

equipment is in hydro stage. (No any fouling)

Please confirm there is no hold.

THANKS AND REGARDS,

SONAL SONAWANE

ENGINEER- DESIGN

CONTACT NO. 9768072505

---------- Forwarded message ---------

From: AGNI DUTTA <agni.d@temaindia.com>

Date: Tue, Oct 25, 2022 at 6:40 PM

Subject: PLEASE REMOVE HOLD POINT INSIDE THE DWG. OF PO-57 (EQUP.-

109SRF010005/20005)

To: Sonal S. Sonawane <sonal.s@temaindia.com>

Cc: Mitesh Bhandari <mitesh.b@temaindia.com>, Gajanan Gundale

<gajanan.g@temaindia.com>, Shubham Sarkar <shubham.s@temaindia.com>,

Tushar Gajre <tushar.g@temaindia.com>, Haresh Patel

<haresh.p@temaindia.com>, Sameet Gunjal <sameet.g@temaindia.com>,

Shweta Sonawane <shweta.s@temaindia.com>

Dear Sonal Mam,

                            I am sending some pictures of PO-57

(EQUP.- 109SRF010005/20005). The nozzle Elevation cutout marking time

is already permitted by barc through & lifting hook elevation not

fouling any nozzle opening. So please remove this 2nos of hold point

in the barc approved drawing & this 2nos of equipment at the final

stage condition (Final dimension & hydro By TUV TPI). Therefore mam

please conversation with client above this hold point & clear this

point as soon as possible by barc through by written.

Regards,

A.Datta (QA/QC)

9883191066

​________________________________________________________________________________________________________________________________

This email may contain confidential and/or privileged information. If

you are not the intended recipient (or have received this email in

error) please notify the sender immediately and destroy this email.

Any unauthorized copying, disclosure or distribution of the

information in this email is strictly forbidden.

​________________________________________________________________________________________________________________________________

You might also like