Dear Madam,
This refers to your trailing mail regarding hold point on elevation of Nozzle F22 and lifting hook of PO item 57(2 equipment). The matter was reviewed by NRB design team. The elevation of
Nozzle F22 and lifting hook mentioned in approved fabrication drawings is acceptable.
Regards,
Kripal Singh
NRB, BARC.
Dear Sir,
SONAL SONAWANE
ENGINEER- DESIGN
Subject: PLEASE REMOVE HOLD POINT INSIDE THE DWG. OF PO-57 (EQUP.-
109SRF010005/20005)
fouling any nozzle opening. So please remove this 2nos of hold point
in the barc approved drawing & this 2nos of equipment at the final
stage condition (Final dimension & hydro By TUV TPI). Therefore mam
please conversation with client above this hold point & clear this
Regards,
A.Datta (QA/QC)
9883191066
________________________________________________________________________________________________________________________________
you are not the intended recipient (or have received this email in
error) please notify the sender immediately and destroy this email.
________________________________________________________________________________________________________________________________