You are on page 1of 6

1 2 3 4 6 7 8

REVISION
CTQ Critical to Quality Visual check/Inspect CTTP Critical to Process Step/Activity # SAFETY
ECO# REV DESCRIPTION DATE

A
DO:
EE-14,1&4 Pin, 1.1mH, ±5%, 300mV, 1KHz (RoHS)
A

DO:

1 Ensure the Semi-Automated Taping machine 5S and working conditions are


OK .
Set the Program applicable for EE-14(1 & 4Pin).
Use 4mm Yellow Tape(Check the Width of the Tape Using Digital Vernier
Caliper).
Switch ON the Supply & Start the Machine.
B

Note :
4mm Yellow Tape width
Tolerance was ±0.2mm

C C

D D

NOTE: In case of any Doubt or Non-Conformities please inform the Line Leader/ Line Quality immediately. Tools/Equipments
10
9 OPERATION WORK STANDARD FOR COIL TAPING
8
7
Model : EE-14, 1 & 4 Pin , 1.1mH, ±5% (RoHS)
6
5 Semi-Automated Taping
4 Assembly: Coil Taping Process Rev: A Machine / Taping Mandrils
F 3
2 Reference
Doc. No: BOM
1 Yellow Tape(4mm ± 0.2mm) Document:
ITEM Release
PART NO: PART DESCRIPTION QTY. 26-May-22 Page 1 of 4
NO: Date:
1 2 3 4

Note: "Document has been Electronically Reviewed & Approved through Database"
1 2 3 4 6 7 8

REVISION
CTQ Critical to Quality Visual check/Inspect CTTP Critical to Process Step/Activity # SAFETY
ECO# REV DESCRIPTION DATE

A
DO: A

DO:
EE-14,1&4 Pin, 1.1mH, ±5%, 300mV, 1KHz (RoHS)

1 Manually Insert winded Coils to Loading Fixture First Mandril & Wrap the Tape
Manually for first Coil.
Insert another Winded Coil to Taping Machine Second Mandril.
Check the Taping Process by Pressing Start Cycle(Single Cycle/Continous Cycle
Based on Machine Usage).
B

B
B

C C

D D

NOTE: In case of any Doubt or Non-Conformities please inform the Line Leader/ Line Quality immediately. Tools/Equipments
10
9 OPERATION WORK STANDARD FOR COIL TAPING
8
7
Model : EE-14, 1 & 4 Pin , 1.1mH, ±5% (RoHS)
6
5 Semi-Automated Taping
4 Assembly: Coil Taping Process Rev: A Machine / Taping Mandrils
F 3
2 Reference
Doc. No: BOM
1 Document:
ITEM Release
PART NO: PART DESCRIPTION QTY. 26-May-22 Page 2 of 4
NO: Date:
1 2 3 4

Note: "Document has been Electronically Reviewed & Approved through Database"
1 2 3 4 6 7 8

REVISION
CTQ Critical to Quality Visual check/Inspect CTTP Critical to Process Step/Activity # SAFETY
ECO# REV DESCRIPTION DATE

A
DO: A

DO:
EE-14,1&4 Pin, 1.1mH, ±5%, 300mV, 1KHz (RoHS)

1
After Taping Completed, Check & Inspect the Coil.
Defects to be Ensured

CTQ

C C

D D

NOTE: In case of any Doubt or Non-Conformities please inform the Line Leader/ Line Quality immediately. Tools/Equipments
10
9 OPERATION WORK STANDARD FOR COIL TAPING
8
7
Model : EE-14, 1 & 4 Pin , 1.1mH, ±5% (RoHS)
6
5
NA
4 Assembly: Coil Taping Process Rev: A
F 3
2 Reference
Doc. No: BOM
1 Document:
ITEM Release
PART NO: PART DESCRIPTION QTY. 26-May-22 Page 3 of 4
NO: Date:
1 2 3 4

Note: "Document has been Electronically Reviewed & Approved through Database"
TITLE: DOC. No.: REV NO. 00

Revision History Details DATE: 26/05/2022 PAGE 4 of 4


DEPARTMENT:

QMS - Quality Assurance


Doc No. Doc Title

Coil Taping Process.

REV Date Modification History Prepared By Reviwer Approved By

K.Mehaboob
0 26-May-22 Initial release
basha