JWO No~820
CANOPUS
INDONESIA
Serving The Oil Industry With Professional Touch
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 61/2" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-08/APSNI/2014
OD< 6" 1.S.2.5
OD 6"-7 7/8" 2.25--2.75
Type Oflnspection: NDT - Visual and Dimensional ;:: OD 8" 2.S-3.2 PO No.: TWO/O 11/APS/VI/2014
~ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ API Spec.7 D Wet Visible MPI D AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity: 1300 w/cm
2
0 APIRP7G
---- 0 Wet Fluorescent MPI 0 DC-Residual D Metric D Transverse 0 CI-TP-MPT-02 0 Batch Cone. : 0.3 /!OOml
ODS! Cat: D DryMPI D DC-Continous D CI-TP-LPT-03 D Comparator Test Pie-;;--
D Cust.Spec D Dye Penetrant D Other 0 Dwell time: minutes
\..
f'
- - - -
I
p
H
X-Over Saver Oil 3 l/2IF 5 7/16" TD Thread Damage
8 I
NN B ST 5 7/16"
9 114" 13 3/16"
I - I I I I I -
I I -
OK Ready to used
RF:refaced TD:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:stress relief groove BB:boreback SB:swollen (belled) box NRF:no relielfeatures RB:re-beVel RC:recut ECC:eccentric S/S : Shoulder to Shoulder PT: pitted thread
Summary:
Total Conn Inspected : 1 Connections
Perfonned cleaning prior to inspection a part inspected by wet MP/ with Black Light on connection
found defect indication crack on bodyPin and Blade, Seal Damage on Box Connection and not Acceptable.
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 6 112" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-07IAPSNI/2014
* OD< 6" 1.8-2.5
*OD 6"-7 718" 2.25-2.75
Type Of Inspection : NDT - Visual and Dimensional ;:: OD 8" 2.5-3.2 PO No.: TWO/Ol l/APSNI/2014
~ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ API Spec.7 0 Wet Visible MPI D AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1100 w/cm
2
0APIRP7G
---- D Wet Fluorescent MPI 0 DC-Residual D Metric D Transverse 0 CI-TP-MPT-02 0 Batch Cone. : ---o.3"""
/IOOml
0DSI Cat: 3 D DryMPI D DC-Continous D CI-TP-LPT-03 D Comparator Test Pie~
D Cust.Spec D Dye Penetrant D Other D Dwell time : ______ minutes
-- -- -.'.5.~.. .
*The result of tool inspected by the company to the customer represent good faith opinions and arc not to be considered warranties or guarantees of quality, classification or usability of tool inspected.
f"--~j'..~.::. ~ ,'
{j~
:'~l. ' ~
.t(~
. $
1t~i~l1Wj
Item
No.
Description
Serial Number
Connection
-- Total
Length
ID
B.Back/SRG Bevel
Diameter
Thread
length I C.Bore
I
Diameter Depth IFloat Bore
Diameter I
Float Length I ~lade
Diameter
Tong
Space
BSR
Final
Cond
Remarks
Type I OD Diameter I Length
I
-5 li2 I
X-Over Sub P FHMDS 6 1/2"
7 -- 15" 3 1/2"
20-1501 Bl 4 1/2 IF I 61/2" OK Ready to used
RF:relaced TO:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:stress relief groove BB:boreback SB:swollen (belled) box NRF:no relieffeatures RB:re-bevel RC:recut ECC:eccentric SIS : Shoulder to Shoulder PT: pitted thread
SUmmary:
Total Conn Inspected : 2 Connections
Perfonned cleaning prior to inspection a part inspected by wet MP/ with Black Light on connection
not found defect indication and Acceptable.
~
I Oocunent No.: Cl.Tub 4-4-1 I Revision : 03 I EffectiVe-Cfati:~2 .. rn--, Page , d T I
PT. C-L\UPLS l.\DO.\ES!.A.
Jin. Ciater Raya BSD gang Otong Enjos No.108
kampungMaruga-Ciater Serpong-Tangsel 15310
Phone: 021-75873222,75873223,75873224
Fax: 021-75873225
INSPECTION REPORT
~.:-
EGPE~~
.
Ct-r:1fc-L~ ~, lfij
" ~ ~
-
J' .,.
t'
l LI
E-mail : info@cauopusindonesia.com 008
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CA.KUNG Date: June 27, 2014
Description : CORE BARREL UNIT 6 112" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-06/APSNI/2014
* OD < 6" 1.8-2.S
*OD 6"7 718" 2.25-2.75
Type Oflnspection : NDT - Visual and Dimensional 2: OD 8" 2.5-3.2 PO No.: TWO/O 11/APSNI/2014
~ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ API Spec.7 0 Wet Visible MPI 0 AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm 2
0APIRP7G
---- 0 WetFluorescentMPI 0 DC-Residual 0 Metric 0 Transverse 0 CI-TP-MPT-02 0 Batch Cone. : -rr /IOOml
0DSJ Cat: D DryMPI 0 DC-Continous D CI-TP-LPT-03 0 Comparator Test Pie-;;--
---
0 0 0 0
Cust.Spec Dye Penetrant Other Dwell time:
------ minutes
*The result of tool inspected by the company to the customer represent good faith opinions and are not to be considered wammties or guarantees of quality, classillcation or usability of tool inspected.
~~ 31;~
Item
No.
I Description
Serial Number
I
Connection
Type I OD
I Total
Length
I ID
B.Back/SRG
Diameter Length
Bevel
Diameter
I Thread
length
C.Bore
Diameter Depth
Fl~at Bore
Diameter
I Float Length I ~lade I
Diameter
Tong
Space I BSR I Final I
Cond
Remarks
=5 112
Core Barrel Tube p
FHMDS
6 9116" I I - I I I I I I I I I I OK I Ready to used
6 I 157 1/8" 4 5116"
5 112
20-2675/2 B
FHMDS
6 9116" I I I I - I - I I I I I I I OK I Ready to used
RF:refaced TD:thread damaged SD: seal I shoulder damaged GT:=galled thread SRG:Stress relief groove BB: bareback SB:swollen (belled) box NRF:no reliel!ea!ures RB: re-bevel RC:recut ECG: eccentric SIS: Shoulder to Shoulder PT: pitted thread
Summary:
Total Conn Inspected : 2 Connections
Colllmem: Performed cleaning prior to inspection a part inspected by wet MP! with Black Light on connection
not found defect indication and Acceptable.
I Document No.: Cl. Tub 4-4-1 I Revision : 03 I Effeciive Date : 04/06l2012 r--- - - -P!ge .- - 1 -ril- - ,- - - .J
-
~ ~..-::~ '."'!:.., ~~ .... 'i ==-~- ~;
ta~
INSPECTION REPORT
~ ~
-~-!
um~~ "4"~- ....:CCU:- ~:SW--~
,.,._"lbr :; .. .r'.::;:; ~.1-,.::;' ~.r...:::~
:.n. ~:1.-~-.':.:_5
E-m.a:il . m10'3'~csu.oom ll08
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 61/2" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-05/APSNI/2014
OD< 6" 1.S-2.5
OD 6" -7 718" 2.25-2. 75
Type Of Inspection : NDT - Visual and Dimensional ?! OD 8" 2.5-3.2 PO No.: TWO/O 11/APSNl/2014
~ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LlAPISpec.7 0 Wet Visible MPI 0 AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm 2
0 WetFluorescentMPI 0 DC-Residual 0 Metric 0 Transverse 0 CJ.TP-MPT-02 0 Batch Cone.:
0APIRP7G
0 DSI Cat: ---- D DryMPI 0 DC-Continous D CI-TP-LPT-03 0 Comparator Test Pi~
0.3 /IOOml
Item
No.
I Description
Serial Number
I
Connection
Type I OD
I I
Total
Length
ID
B.Back/SRG
Diameter Length
Bevel
Diameter
I Thread
length
C.Bore
Diameter Depth
fl~ Bore
Diameter
I float Length I ~lade I
Diameter
Tong
Space I BSR I Final
Cond
I Remarks
=
5 112
Barrel Connector Sub p
FlIMDS
6112" I I I - I I I - I I I I I I OK I Ready to used
5 I 40" 3 112"
5 112
20-2677 B
FlIMDS
6 112" I I I - I I - I - I I I I - I I OK I Ready to used
RF:refaced TD:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:stress relief groove BB:boreback SB: swollen (belled) box NRF:no relieffeatures RB:re-bevel RC:recut ECC:eccentric SIS : Shoulder to Shoulder PT: pitted thread
Performed cleaning prior to inspection a part inspected by wet MP! with Black Light on connection
not found deffect indication and Acceptable.
Customer: PT .ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 61/2" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-04/APSNI/2014
* OD < 6" 1.8-2.5
* OD 6" -7 7/8" 2.25-2.75
Type Of Inspection : NDT - Visual and Dimensional 2'. OD 8" 2.5-3.2 PO No.: TWO/Ol l/APSNI/2014
~ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ API Spec.7 D Wet Visible MPI D AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm 2
0APIRP7G
---- 0 Wet Fluorescent MPI 0 DC-Residual D Metric D Transverse 0 CI-TP-MPT-02 0 Batch Cone. : ---o.'3 /!OOml
D DSI Cat: D DryMPI D DC-Continous D CI-TP-LPT-03 D Comparator Test Pie-;--
D Cust.Spec D Dye Penetrant D Other D Dwell time : ------ minutes
*The result of tool inspected by the company to the customer represent good faith opinions and are not to be considered warranties or guarantees of quality, classification or usability of tool inspected.
Item
No.
I Description
Serial Number
I Type
Connection
I OD
I I
Total
Length
ID
B.Back/SRG
Diameter Length
Bevel
Diameter
I I Thread
length I
C.Bore I I I I
float Bore Blade
Diameter Depth Diameter float Length Diameter
Tong
Space I BSR I Final
Cond
I Remarks
=
5 112
Core Barrel Tube p
FHMDS
6 9/16" I - I I I - I - I - I I I I I I OK I Ready to used
4 I 157 1/8" 4 5116"
5 112
20-267511 B
FHMDS
6 9116" I I I - I - I I I I I I - I I OK I Ready to used
Legend RF:refaced TD:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:Stress relief groove BB:boreback SB:swollen (belled) box NRF:no relieffeatures RB:re-bevel RC:recut ECC:eccentric SIS : Shoulder to Shoulder PT: pitted thread . ~
Sunmary:
Total Conn Inspected: 2 Connections
Perfonned cleaningprior_ to inspectioTJ_a p_att inspected by wet MP/ with Black Light on connection
not found defect indication and Acceptable.
INSPECTION REPORT
.
g
-~~li~I
< ~
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 6 1/2" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-03/APSNI/2014
OD < 6" 1.8-2.5
OD 6"-7 718" 2.25-2.75
Type Of Inspection : NDT - Visual and Dimensional ;:: OD 8" 2.S-3.2 PO No.: TWO/Ol l/APS/VI/2014
~ification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ AP!Spec.7 0 Wet Visible MP! 0 AC-Active 0 Inch 0 Longitudinal 0 CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm 2
0 0 Wet Fluorescent MPI 0 DC-Residual 0 Metric 0 Transverse 0 CI-TP-MPT-02 0 Batch Cone.: ~
APIRP7G
ODS! Cat:
---- 0 DryMPI 0 DC-Continous 0 CI-TP-LPT-03 0 Comparator Test Pi~
/IOOml
--~-- - -
*The result of tool inspected by the company to the customer represent good faith opinions and arc not to be considered warranties or guarantees of quality, classification or usability of tool inspected.
. -"''"'--. "'--~ ~~-:"
Item
No.
I Description
Serial Number
I Type
Connection
I OD
I Total
Length
I ID
B.Back/SRG
Diameter Length
Bevel
Diameter
I I Thread
length
C.Bore
I
Diameter Depth
I Flool Bore
Diameter
I float I Blade
Length Diameter
I Tong
Space I BSR I Final I
Cond
Remarks
--
5 112
Inner Tube Latch Sub p
FlIMDS
6 112" I I I I I - I - I I I I I I OK I Ready to used
3 I 10 1/2" 3 17/32"
5 1/2
20-2679 B
FHMDS
6 112" I I I - I I I I I I I I I OK I Ready to used
legend RF:refaced TD:thread damaged SD:seal I shoulder damaged GT'.=galled thread SRG'.stress relief groove BB:boreback SB'.swollen (belled) box NRF'.no relietleatures RB:re-bevel RC:recut ECC:eccenlric SIS "Shoulder to Shoulder PT: pitted thread
Summary:
Total Conn Inspected : 2 Connections
Comment: Performed cleaning prior to inspection a part inspected by wet MP! with Black Light on connection
not found defect indication and Acceptable.
I Document No.: Cl.Tub 4-4-1 I Revision: 03 I Effective Date: 0410612012 ----=i-- --- Page: 1 of 1 I
Jn ;_.:.#Ira ;.z._, ~;:) ~ '-~ '!.Jtc. '*:-. :11
ll=:p;og ~~?-Lt&1a' ~7~ 1~310
INSPECTION REPORT
-- --------------
-tA~I~ ~~
v I ; G
,. : I
Pbme: 02 l-i5873222.75873223.75873224
Fax: 021-75873225
lllllqp
E-mail: info@canopusindooesiacom 008
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 6 112" Size: 61/2" OD DS-1 Recommended BSRRange Report No.: 820-02/APSNI/2014
* OD< 6" 1.8-2.5
*OD 6"-7 718" 2.25-2.75
Type Of Inspection : NDT - Visual and Dimensional ;:: OD 8'' 2.S-3.2 PO No.: TWO/O 11/APS/VI/2014
.ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Performance :
LJ API Spec. 7 0 Wet Visible MPI D AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm
2
@APIRP7G
---- D Wet Fluorescent MPI 0 DC-Residual D Metric D Transverse 0 CI-TP-MPT-02 0 Batch Cone.: ~ /IOOml
0DS1 Cat: D DryMPI D DC-Continous D CI-TP-LPT-03 D Comparator Test Pie:;--
D Cust.Spec D Dye Penetrant D Other 0 Dwell time : minutes
*The result of tool inspected by the company to the customer represent good faith opinions and arc not to be considered warranties or guarantees of quality, classification or usability of tool inspected
Item
No.
I Description
Serial Number
I
I Type
Connection
OD
Total
Length
ID
B.Back/SRG
Diameter Length
Bevel
Diameter
Thread
length
Diameter
C.Bore I float Bore I Blade
Depth I Diameter Float Length Diameter
I I Tong
Space I BSR I Final
Cond
I Remarks
Legend RF:refaced TD:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:stress relief groove BB:boreback SB:swollen (belled) box NRF:no relieffealures RB:~ RC:recut ECC:eccentric SIS : Shoulder to Shoulder PT: pitted thread
Summary:
Total Conn Inspected : 2 Connections
Comment: Perfonned cleaning prior to inspection a part inspected by wet MP/ with Black Light on connection and
on body Blade with AC Yoke used WCP2 and 7HF ink,Blade OD not dismantle measurement
found defect indication crack on bodyPin and Blade, Seal Damage on Box Connection and not Acceptable.
-fl:r.
'
.b (..-r ~ 3:>.:J !""'! ~ !~ ~ : :~
Ut::J~~U::-ap-Coascr~Tmpd 15310
INSPECTION REPORT
Pbooc: 021-75873222. 75873223.75873224
Fax: 021-75873225
E-mail : info@canopusindooesia.com
~~
008
Customer: PT.ANDALAS PETROLEUM SERVICE Location: PT.APS WORKSHOP-CAKUNG Date: June 27, 2014
Description : CORE BARREL UNIT 6 1/2" Size: 61/2" OD DS-1 Recommended BSR Range Report No.: 820-01/APSNI/2014
OD< 6" 1.8-2.5
OD 6"-7 718" 2.25-2.75
Type Of Inspection : NDT - Visual and Dimensional ~ OD 8" 2.5-3.2 PO No.: TWO/Ol 1/APSNI/2014
.1!.ecification: Inspection Methode: Field Type: Units Field Orientasi: Procedure: Petformance :
LJAPISpec.7 @ Wet Visible MPI 0 AC-Active 0 Inch 0 Longitudinal D CI-TP-MPT-01 0 UV light Intensity : 1300 w/cm 2
@APIRP7G
---- 0 Wet Fluorescent MPI 0 DC-Residual 0 Metric 0 Transverse @ CI-TP-MPT-02 0 Batch Cone. : ----oT /IOOml
0 DSl Cat: D DryMPI 0 DC-Continous D CI-TP-LPT-03 0 Comparator Test Pi~
0 Cust.Spec 0 Dye Penetrant 0 Other 0 Dwell time : minutes
*The result of tool inspected by the company to the customer represent good faith opinions and are not to be considered warranties or guarantees of quality, classification or usability of tool inspected.
Item
No.
I Description
Serial Number
I
I
Connection Total
Length
ID
B.Back/SRG
Diameter I
Bevel
Diameter
Thread
length
I C.Bore
I
Diameter Depth I Float Bore
Diameter IFloat Length Io!3a'.:er Tong
Space
BSR
Final
Cond
Remarks
Type I OD Length
=5 112
Lifting Sub
NIN
I:1 FHMDS I
6 112"
311/2" ( 225/32"1----+----+-----11---t----t---1
7 718" OK Ready to used
Legend RF:refaced TD:thread damaged SD:seal I shoulder damaged GT:=galled thread SRG:stress relief groove BB:boreback SB:swollen (belled) box NRF:no relieffealures RB:re-bevel RC:recut ECC:eccentric SIS : Shoulder to Shoulder PT: pitted thread
Summary:
Total Conn Inspected : 1 Connections
Comment: Performed cleaning prior to inspection a part inspected by wet MP/ with Black Light on connection and
on body lift with AC Yoke used WCP2 and 7HF ink,not found deffect indication and Acceptable.
SERVICE REPORT
t t ~ l'OMER : PT.ANDALAS PETROLEUM SERVICE Date: June 27, 2014
U ...._ I .OCATION : PT. APS - WORKSHOP - CAKUNG POI WO No. TWO/ Ol l/APSNI/2014
'" -.1 HIPTION : CORE BARREL SET SIZE 6 1/2" OD
RESULT OF INSPECTION
!
I NO . . [~:>!;;:~c:}r;/~. t; ,~i/'}
:''ff
r:.:e;' U
":. . XrJ.
:;;,_, . >''.:'.' ... .\"
QTY
----
--
-
I
--
--------------------1---1-------1-------+---------l
-------------------1-----1-------+-----+---------1
.--------------------1----f-----+------+---------I
-------------------1---------1-------+----------1
Approved by :
'"'"'"'No Cl Fonn 1l(fub1-212013 Revision No: 0I Date : September 23, 2013 Pugo: I of
PT CANOPUS INDONESIA
QUAUTY INSPECllON AND TESllNG SERVICE
Jln.Ciater Raya BSD-Gg.Otong Enjos No.108
Tangerang Selatan 15310 - Indonesia
Phone: 021-75873222 (Hunting) Fax: 021-75873225
E-mail : info@canopusindonesia.com "'
SUMMARY OF TOOL INSPECTION
The Results of Tool inspection Reported By the Company To the Customer Represent Good Faith Opinions only
And Are not to be Considered Warranties Or Guarantees Of Quality, Classification, Or Usability Of Tool Inspected
t 1111rr : PT. ANDALAS PETROLEUM SERVICE Date : June 26, 2014
\tf-~1.J ICIK : PT. APS Workshop - Cakung J.W.0# : 820/APS/Vl/2014
Cust W.O # : T.w.01011/JDl/Vl/2014
page: 1of1
... .
1=... H
-
. 1
J~~ll ,i
-
: } .
.
.
Acceptable
SD on Box &
tlh 6 1/2" Upper Reamer SN 20-2680, lnsp ace to API RP 7G - 1 - Crack Body PIN
" 6 1/2" Inner Tube Latch Sub SN 20-2679, lnsp ace to API RP 7G 1 - - Acceptable
'" 6 1/2" Core Barrel Tube SN 20-2675/1, lnsp ace to API RP 7G 1 - - Acceptable
'" 6 1/2" Barrel Connector Sub SN 20-2677, lnsp ace to API RP 7G 1 - - Acceptable
......'" 6 1/2" X-Over Saver Oil NSN, lnsp ace to API RP7G - 1 - TD on Pin Conn
""
I Comment : According to API RP 7G
Services by : Mashuda