You are on page 1of 3

Version Control Sheet

Document Name : MA Checklist


Document Number : QMS/QA/04
Effective date : 06.01.2020

Author: Reviewer:

EPG Team Kumar Amit

Signature Signature
Electronic copies valid without signature

Document Revision History

Ver. No Effective date Nature of modifica


1.0 Released Version
ol Sheet

Issue Number: 1
Revision Number: 1.0
Document Revision No. 1.0

: Approver:

it Ratan Sah

e Signature
hout signature

n History

Nature of modification
Released Version
Work Products Review Checklist

Measurement & Analysis Checklist

No. Check Item Result


1 Have measurement data collected & documented?
2 Is analysis performed for the deviation and analysis is documented?
3 Have all necessary measures to support project identified?
4 Whether the scale and progress control limits set reasonable
5 Is measures definition aliged with measurement objectives?
6 How measures are collected?
7 How measures are stored?
8 Is measurement analysis done before each milestone?
9 How measurement data used for project management activities?

Document No: QMS/QA/04 | Issue No: 01 | Revision No: 00 | Effective Date: 16 Dec
2016 | Page No: 2

You might also like