Doc.

NO F/PD/02
CONTROL PLAN
REV. NO 00/01.09.22

Control Plan Number Key Contact Phone: Issue No. 1 Rev. 0


Prototype Pre-launch Production Date (Original) Date (Revised)

Part no./ Latest change no Rev.NO:- Core Team:- Customer Engineering approval /Date if required

Part Name / Description- Pin Door Lock Control Link Customer Quality Approval Date (if required)

Supplier /Plant Supplier Code- Other Approval Date(if required) Other Approval /Date (if required)

Part / Process Name / Machine Characteristics Spl


Method
Process Operation Device No. Product Process Char. Product / Process Evaluation/ Reaction
No. Description Jig, Tools class Specification in mm Measurement production Q.C. Control Plan
Sample
For Mfg. Tolerance Technique Frequency Resp. Sample size Frequency Resp. method
size

Spl.Class Characteristics :- Critical - ©


Prepared By: Approved By: