You are on page 1of 1

Preventive Maintenance Schedule

I. Visual Inspection
Description
Expected Results
NO Description Check Results
1 Safety-Relevant label Check Labeling for
completeness
2 Visible Damage To Supply Check Cable And
Lines Plug
3 Condition of safety- Check Visible Screw
relevant Mechanical Parts Connection
4 Contamination Check All Vents
Detrimental To Safety

II. Electrical Safety


Description
Expected Results
No Description Check Results
1 Check the specified value All value within
using the Safety tester specified tolerance
range
2 Check Proper voltage Each Power Socket is
supply To each Power supplied with proper
Socket Using The Voltage
Measuring Device

You might also like