Professional Documents
Culture Documents
Job Information: Engineer Checked Approved Name: Date: Structure Type
Job Information: Engineer Checked Approved Name: Date: Structure Type
Name: vin
Date: 4/16/2023
G3: 2B B2: BEAM ACI 318-05 Beam M44, M45, M46, M47, M48, M49, M50
Beam Spans
Cover
Length Top Btm Side
Member Span Type Link Size
(m) (cm) (cm) (cm)
Beam Supports
Distance Vu Vc Av Required
Span
(m) (kN) (kN) (mm2)
Distance Vu Vc Av Required
Span
(m) (kN) (kN) (mm2)
Distance Vu Vc Av Required
Span
(m) (kN) (kN) (mm2)
Span / Depth