MATERIAL HANDLING
MONTH NUMBER OF MOVES
COST
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.562130419944794
R Square 0.315990609027311
Adjusted R Square 0.230489435155725
Standard Error 1923.78176160346
Observations 10
ANOVA
df SS MS F
Regression 1 13677719.8697751 13677719.8698 3.6957458561
Residual 8 29607490.1302249 3700936.26628
Total 9 43285210
Y= a + bx
Y= 1859,265741 + 6,768822924 X
atau Y = 1859,26 + 6,77 X
di mana :
a = biaya tetap
b = biaya variabel
Y = Material Handling Cost
X = Number of Moves
Significance F
0.09077436554
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.648988181892774
R Square 0.421185660236489
Adjusted R Square 0.255810134589771
Standard Error 1891.86605716136
Observations 10
ANOVA
df SS MS F
Regression 2 18231109.7523251 9115554.87616254 2.5468439697
Residual 7 25054100.2476749 3579157.17823928
Total 9 43285210
Y = a+bx1+bx2
Y = 1192,083122 + 4,557377352 X1 + 0,091475954 X2
atau Y = 1192,08 + 4,56 X1 + 0,1 X2
dimana:
Y = Persamaan Biaya
a = Biaya Tetap
b = Biaya Variabel
Y = Material Handling Cost
X1 = Number of Moves
X2 = Pounds Moved
Significance F
0.14753242698