You are on page 1of 1

NB Constructions

Sub contractor: Pappu Prasad


FOOTING
Drawing No/Rev No :- M3M-STR-P.FDN.Plan.-02
Date of Receipt (Drg.) Foundation Layout & RC Details
Nos. Of
Total Total Lenght in Mtr Dia wise
Description of Bar DIA Nos. Of Bar/ Cutting
Sl No Nos. of Bend
Bar Mark (mm) Footing Footing Length (in MM)
Bar 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm

X10/Y16 (F10)
Bottom Short
Bar ( along with Ra 25 1 19 19 -100 3895 - - - - - 74.01
Y axis)
20 1 18 18 3990 - - - - 71.82 -
Bottom Long
Bar( along with Rb 25 1 19 19 -100 3895 - - - - - 74.01
X axis)
20 1 18 18 3990 - - - - 71.82 -
0 - - - - - -
Top Short Bar (
along with Y Ra 25 1 19 19 -100 3325 - - - - - 63.18
axis)
20 1 18 18 0 - - - - 0.00 -
Top Long Bar(
along with X Rb 25 1 19 19 -100 3325 - - - - - 63.18
axis)
20 1 18 18 0 - - - - 0.00 -
0 - - - - - -
X16/Y15 (F7) 0 - - - - - -
Bottom Short
Bar ( along with Ra 20 1 60 60 -80 5529 - - - - 331.74 -
Y axis)
0 - - - - - -
Bottom Long
Bar( along with Rb 20 1 60 60 -80 5529 - - - - 331.74 -
X axis)
0 - - - - - -
Side C bar
12 1 31 31 -48 2212 - - 68.560 - - -
12@200 c/c
0 - - - - - -
0 - - - - - -
Side C bar
12 3 31 93 -48 1689 - - 157.086 - - -
12@200 c/c
0 - - - - - -
0 - - - - - -
Face bar
16 4 3 12 4750 - - - 57.00 - -
16@300 c/c
0 - - - - - -
0 - - - - - -
0 - - - - - -
0 - - - - - -
Top short bar Rc 12 1 31 31 -48 5999 - - 185.955 - - -
0 - - - - - -
0 - - - - - -
Top Long bar Rd 12 1 31 31 -48 5999 - - 185.955 - - -
550 0 - - - - - -
1500 0 - - - - - -
Remarks: 0.000 0.000 597.555 57.000 807.120 274.360
0.395 0.617 0.889 1.580 2.469 3.858

0.000 0.000 531.160 90.074 1992.889 1058.488


0.000 0.000 0.531 0.090 1.993 1.058
3.67