Footing Size
Length, L = 3 m Perpendicular to Track
Width, B = 3 m Parallel to Track
Footing Thickness, t = 0.3 m
Pedestal Size, s = 0.7 m
2nd Moment Area, Ix = 6.75 m⁴ LB³/12
2nd Moment Area, Iy = 6.75 m⁴ L³B/12
x= 1.5 m L/2
y= 1.5 m B/2
Footing Area, Af = 9.00 m² LB
Pedestal Area, Ap = 0.49 m² s²
Material Density
Soil Density, ys = 20 kN/m³ Average of Ballast, Subballast and Fill
Concrete Density, yc = 24 kN/m³
Settlement Check
Se = 3.83 mm qmaxB [(1-µ²)/Es] If
µ= 0.3 Bowles, 1996
Es = 61.6 MPa 2.8N
If = 0.95 Bowles, 1988 Flexible Footing
Settlement Limit, S = 25 mm Assumed 10-50mm (Unlikely to have Structural Damage)
Material Properties
Conc. Comp. Strength, f'c = 27.6 MPa
Yield Strength of Steel, fy = 414 MPa
width, bw = 3000 mm
Base Thickness, tb = 300 mm
Concrete Cover, c = 50 mm Base
Rebar Diameter, db = 16 mm
Base Depth, d = 242 mm tb-(c+db/2)
Check of Shear
Wide -beam Shear, Vu = 240.03 kN quL[(B-s)/2-d]
Shear Capacity, φVc = 476.76 kN φ1/6√f'cbwd >Vu OK
Strength Reduction, φ = 0.75 Table 421.2.1