Project Contract T207 Thomson-East Coast Line SHIMIZU Corporation

Client LTA Made by Date Page


Location JEB 6/14/2018 1
Checked Revision Job No.
CSK - -
Design of Lifting Hook Reference
Precast Properties
Concrete Design Strength, fcu = 40 N/mm²
Reinforced Concrete Density, ρrc = 25 kN/m³
Base Slab width, bs = 2.3 m
Base Slab Length, ls = 2.3 m
Base Slab Thickness, ts = 0.25 m
Wall Length, lw = 2.3 m
Wall Height, hw = 0.3 m
Wall Thickness, tw = 0.25 m
Slab Volume, vs = 1.32 m³ bslsts
Wall Volume, vw = 0.35 m³ 2lwhwtw

Extended Reinforcement
Reinforcement Density, ρs = 78.5 kN/m³
Extended Length, Le = 0.8 m
Reinforcement Spacing, s = 0.15 m
No. of Row, Nr = 4
Bar Diameter, d = 16 mm
Area, A = 201.06 mm² π/4d²
No. of Rebar per Row, N = 15 lw/s

Total Weight, wt = 42.45 kN ρc(vs+vw)+ρsALeNrN

Lifting Hook Properties


Yield Strength, fy = 460 N/mm²
Bar Diameter, db = 16 mm
Achorage, L = 600 mm
No. of Lifting Hook, n = 4
Load Factor, LF = 2
Inclination, ɸ = 45 degree

Design of Lifting Hook


wt of precast to be lift, Pp = 84.89 kN LFwt
Force per Lifting Hook, P = 30.01 kN Pc/nsinφ

Shear Capacity Check BS5950-1


Shear Force, F = 30.01 kN P
Shear Area, As = 180.96 mm² 0.9π/4db² 4.2.3
Shear Capacity, Fc = 49.94 kN 0.6Asfy >F OK 4.2.3

Tension Capacity Check


No. of Bar in Tension, nt = 2
Tension Force, T = 15.01 kN P/nt
Tensile Area, At = 201.06 mm² π/4db² 6.3.4.2
Tensile Capacity, Pnom = 73.99 kN 0.8Atfy >T OK 6.3.4.2

F/Fc + T/Pnom = 0.80 <1.4 OK 6.3.4.4

Anchorage Length Design CP65


Length Required, l = 94.41 mm T/fbπdb <L 3.12.8.3
fb = 3.16 N/mm² β√fcu 3.12.8.4
β= 0.5 Table 3.26