Professional Documents
Culture Documents
Career Report - Timothy
Career Report - Timothy
Submitted by
November, 2020
Career Report Geomatic Engineer
Table of Contents
1.0 INTRODUCTION.............................................................................................................2
PERSONAL DATA......................................................................................................................2
CONTACT ADRESS..................................................................................................................2
2.0 EDUCATION BACKGROUND AND QUALIFICATION..........................................................3
3.0 COMPETENCE..............................................................................................................4
4.0 CHRONOLOGICAL REPORT OF ENGINEERING CAREER...................................................5
5.0 WORK EXPERIENCE......................................................................................................6
5.1 GHANA NATIONAL GAS COMPANY (MARCH 2020 ‐ PRESENT)............................................6
5.1.1 CONSTRUCTION AND SUPERVISION OF 3no GUARD HOUSES (2020).............................6
5.1.2 ANOKYI MAINLINE COMPRESSOR STATION AND ANCILLARY FACILITIES FOR THE
ONSHORE GAS TRANSMISSION PIPELINE (2019-2021).............................................................6
5.1.3 DRIVER’S RESTROOM FACILITY (2020-2021)....................................................................7
5.2 DEPARTMENT OF URBAN ROADS – ACCRA (SEPTEMBER 2017 – AUGUST 2018)..............8
5.3 DEPARTMENT OF URBAN ROADS – ACCRA (JUNE 2016 – AUGUST 2016)
FAS CONSULTANCY – QUEIROZ GALVAO...................................................................................9
6.0 SITE AND TECHNICAL MEETINGS..................................................................................9
7.0 WRITING OF TECHNICAL PROPOSALS & REPORTS.........................................................9
8.0 REFEREES...........................................................................................................................10
9.0 CONCLUSION.....................................................................................................................11
CERTIFICATION..........................................................................................................................11
1|Page
Career Report Geomatic Engineer
1.0 INTRODUCTION
RESEARCH AND PROFEESIONAL EXPERIENCE
My Professional carrier started a year after I enrolled in one of Ghana oldest professional
training institution “Ghana School of Surveying and mapping (GSSM), then Ghana School of
Survey”. I Enrolled in GSSM in 2008 in a bid to pursue HND-Surveying and Mapping and a year
after my enrollment I assumed the position of a Lead Surveyor at Keltim Ideaz Consult. Keltim
Ideaz Consult (KICS) is specialized in providing consultants and engineering services to both
individual and industries.
At KICS we offer our clients with technical advices needed to acquire properties such as land,
buildings (completed /uncompleted, we also provide surveying services such as preparation of
base-map for planning, route surveying for rails, pipelines electricity power transmission lines,
we also demarcate large portions of lands to developer parcel size making sure it conforms
with Land use and spatial planning authority’s plan. We also prepare cadastral plans of varying
sizes of land to be used for registration, engineering surveying services such as setting out of
complex structures and levelling are also part of our core services.
During the year we have provided services to industries such as National Trust Holdings
Company Limited (NTHC), Strategic Properties and Investment Limited, Arab Contractors
Ghana Limited, Integrated Energy BV Ghana Limited and all African shipyard just to mention a
few. We have also served over three hundred individual developers over the years as well.
While serving at KICS, I assumed a statutory position as Survey Technician-National Service
Personnel at the Town and Country Planning department, Shama District Assembly in the
western region of Ghana. Some of my work schedule at T&CPD are, checking and reviewing of
plans, provision of technical support and taking charge of some core land surveying activities
since I was the only one with surveying background there at the time.
In a bid to improve my capacity in my discipline I enrolled in the School of Engineering, KNUST
in 2017 to pursue my degree in Geomatic Engineering and graduated with second class upper
in 2019.
A year after my graduation from KNUST, I got an appointment from Ghana National Gas
Company to serve in the position of a Geomatic Engineer with their Construction Management
Department.
At Ghana Gas my main responsibilities are to provide technical advice and to help in selection
of suitable project site and routes of gas pipelines, resolve any unexpected civil technical
difficulties and other problems that may arise from project site. I’m also responsible for
checking plans, drawings and quantities for accuracy of calculation and review technical
reports submitted by our contractors.
Over the periods, I have also successfully completed the following training and courses in a bid
to build my capacity to be able to adequately discharge my duties. (a) Drone Pilot training from
the University of Mines, Tarkwa, (b) First AID training with National Ambulance Services, (c)
BOSIET CA-EBS at Rigworld Training Center and (d) Project Planning and Management from
GIMPA.
I have also done a few research from with the first one being in 2011 during my days in Ghana
School of Surveying and mapping on the topic “Application of Global Position System (GPS) in
responding to crime, 2011 with the Bank robbery being our case study. I also researched on the
spatial classification of cacao swollen shoot virus (CSSV) in the western north Region of Ghana,
2019, this was submitted to the Geomatic Engineering department (KNUST)in partial fulfilment
of the requirement for me to be awarded Bsc. Geomatic Engineering. I have also undertaken a
2|Page
Career Report Geomatic Engineer
research for Strategic Properties and investment limited on the effect of run-off water over
their 108 acres stretch of land located in Esupon in the western Region of Ghana.
PERSONAL DATA
Name: Timothy Adzati
Date of Birth: 21st June, 1987
Place of Birth: Ho
Nationality: Ghanaian
Sex: Male
Marital Status: Married
CONTACT ADDRESS
Home address: WR-357-3118
Email: timothyadzati@gmail.com
Mobile: +233 267178844
3|Page
Career Report Geomatic Engineer
4|Page
Career Report Geomatic Engineer
5|Page
Career Report Geomatic Engineer
6|Page
Career Report Geomatic Engineer
7|Page
Career Report Geomatic Engineer
Ghana National Gas Company requested for Technical & Financial Proposals from eligible
Service Providers; Meridian Logistics Engineering (MLE), KAMSAD (Civil contractor), ACON
(Civil Consultant) to conduct the engineering, procurement, construction and commissioning
of the Anokyi Mainline Compressor Station (AMCS) at Atuabo to optimize the full capacity of
the existing onshore gas transmission pipeline.
This will facilitate the projected increased gas flows (including TEN gas evacuations) from the
Atuabo Gas Processing Plant (GPP) as well as control (pressure control) the gas flow from ENI
8|Page
Career Report Geomatic Engineer
Ghana Onshore Receiving Facilities (ORF). This project begun in 2019, I joined the project
team halfway through construction when I gained employment. The project is almost at the
pre-commission and commission stage.
WORKS
Supervised the construction of drains and culvert on site
Supervised the excavation and backfilling of trenches
Supervised the construction of concrete road network in the compressor station
Coordinated and facilitated the relocation of underground electrical cables
Prepare construction update reports and updated the site diary
Assisted in the inspection of all materials and equipment packages received on site
Review drawings as per company specifications to what contractor has done on site
Promptly alerting the project development team in case of major construction
problems
Supervised razor wire fencing works on site
Ensured wrapping of joints on the firefighting lines after hydrotest completion were
done properly without any leakages
Supervised the fabrication of water treatment shelter and fire extinguisher sheds on
site
Supervised coating and painting work on the gas process pipes
Attend site walkthrough meetings and relevant project meetings
To ease the stress and burden on the drivers of the LPG, Lean Gas and Condensate off-
takers, Ghana Gas took it upon themselves to construct a restroom facility with beds and a
washroom near its loading gantry to accommodate these drivers after long hours of drive.
WORKS
Supervised the clearing on site
Supervised grading works (filling, compaction and field density test)
Setting out of works in accordance with the drawings and specifications
Liaising with the contactor and project team to ensure all materials for the project
are purchased
Checking materials and work in progress for compliance with the specified
requirements
9|Page
Career Report Geomatic Engineer
The Department of Urban Roads (DUR) was established in January, 1988 by the Executive
Arm of Government, for the Administration, Planning, Development and maintenance of the
urban road network. The Urban Roads Department:
Collect data for planning and development of road infrastructure in the district.
Monitor to ensure that funds from the road fund and other sources are used for
the designated roads in line with approved standards
Register and maintain records of classified contractors and consultants in the urban
roads construction industry within the district
Assist with the evaluation of road designs by the consultants and facilitate capacity
building of contractors and stakeholders within the district
Prepare progress and annual reports on road works as well as provide inputs into the
preparation of budget for road maintenance activities
With the setting up of the Local Government Service, DUR head office is a division
under the Ministry of Roads and Highways while DUR Units in the municipalities are
to be fully integrated into the District Assembly System
WORKS
Road marking and visibility inspection
Traffic count on the Spintex Road to East Legon tunnel to determine number of cars
plying the route which aided in the construction of the tunnel
Traffic count survey in traffic prone areas of the Metropolis (Lapaz, Accra central and
Adjiriganor)
Road signalling inspection in the Accra Metropolis
Sensitization and referencing of project affected persons (PAPs) along the Spintex
Road 1 corridor
Report writing, Data collection and Analysis
10 | P a g e
Career Report Geomatic Engineer
WORKS
Supervision of civil construction works during the construction of the Kwame
Nkrumah Circle flyover
Inspection of Drains
Asphalt and concrete Testing in the lab
Testing of soil samples in the lab
Office work on data collection
11 | P a g e
Career Report Geomatic Engineer
8.0 REFEREES
ING. ISAAC OKINE
ASSISTANT MANAGER (MECHANICAL ENGINEER)
GHANA NATIONAL GAS COMPANY
ATUABO
TEL: +233 50 161 1198 / +233 24 472 6707
JENNIFER WALDEN
MANAGER (CIVIL ENGINEER)
GHANA NATIONAL GAS COMPANY
ATUABO
TEL: +233 50 155 3532 / 034 227 0780
12 | P a g e
Career Report Geomatic Engineer
9.0 CONCLUSION
My career objective is to be a Professional Civil Engineer, particularly in the area of
construction project management, Project design and execution with the help of the
technical skills I am acquiring.
I am very keen on taking new responsibilities with bigger operations and high challenges
which will help solve both old and new engineering problems in society. This will help me
gain the needed experience to drive my career forward.
CERTIFICATION
I hereby do certify that to the best of my knowledge and belief, this report correctly
describes my qualifications, my competence, my experience and my professional career
profile. I understand that any wilful misstatement described herein may lead to my
disqualification, if considered.
……..……………………………………..
NATHANIEL ADAMAH
9TH JUNE 2021
13 | P a g e