You are on page 1of 7

ASSESSMENT OF A POSSIBLE ENCHROACHMENT ON THE

KARPOWERSHIP RIGHT OF WAY.

ASSESSMENT REPORT

PREPARED BY
T.K.A-CMD-GNGC

SEPTEMBER, 2021
Table of Contents
1.0 Introduction ...................................................................................................................................... 3
2.0 Site Assessment ................................................................................................................................ 3
3.0 Recommendation and Conclusion .................................................................................................... 2
APPENDIX ................................................................................................. Error! Bookmark not defined.
1.0 Introduction

On Tuesday August 17, 2021 the community team responsible for the monitoring the
KARPOWERSHIP pipeline right of way (R.O.W) detected a possible encroachment on the
R.O.W and requested the Construction department for a technical assessment of the situation.
Upon a visit to the site it was discovered that a constructions project has been commenced by
a private developer whose parcel boundary per her documents overlaps with the R.O.W.

ONGOING DEVELOPMENT

PIPELINE MARKER

Figure 1. Image showing the position of pipeline marker and the encroached development.
2.0 Site Assessment
After the visual assessment of the ground information it became imperative for a joint survey
to be conducted by GNGC’s team and the developer’s Surveyor to properly ascertain the
situation and to resolve it.
It was revealed that there is some discrepant between the developers document and the trend
of development on ground, But the developer’s boundary positions on ground were
established based on their documents without considering the trend of physical development
on ground leading to the error.
The developer’s surveyor argues that the portion under contention was properly acquired by
her client as evidenced by their document and that Ghana Gas rather encroached on their
property unlawfully.
The source of data upon which their land documentation is based on derails every argument
pertaining to it correctness. The site plan attached to their document was extracted from a
planning scheme covering that area without referencing to the ground information.
Below are graphical representation of the of the situation at hand.

Figure 2. Diagram showing the extent of overlap/encroachment on the Karpowership R.O.W by the developer
Figure 3. Details of the overlapping region in perspective.

POINT B

R.O.W BOUNDARY POINT A

Figure 4. Graphical representation of encroachment. (a) The red line between the two points (A & B) indicates the R.O.W
boundary line.
3.0 Recommendation and Conclusion
After a thorough assessment of the situation and considering the potential financial
repercussion it may pose, we have outlined the following recommendations for your
consideration.
a. To make a slight detour on the southern part of the R.O.W at the affected area to
accommodate this developer about (2.5- 3) m within the R.O.W.
b. Incase suggestion (a) is adopted an M.O.U should be signed by both GNGC and the
developer indicating the farthest her development can go.
c. The developer may then proceed with development within the agreed bounds base on
(a) and (b)
Below is a graphical representation of our recommendations for your reference.

Figure 5. Diagram showing the recommended detour on the ROW to accommodate the developer.
APPENDIX.

Figure 6. Engagement of the developer and neighbours by the GNGC team.

Developer site

Karpowership R.O.W

Figure 6. R.O.W Pillar located around the site. Figure 7. Showing how development affected the R.O.W