SCHEDULE OF FOOTING

SIZE
MARK DEPTH REBARS DEPTH OF EXCAVATION
A X B
TOP OF FOOTING IS 1.00m
F-1 1.20 x 1.20 0.25 7 - 16 mm Ø BOTHWAYS
BELOW THE NAT. GRADE LN. 5" CHB WALL (exterior) & 4" CHB
WALL (interior) REINF. W/ 10mmØ
TOP OF FOOTING IS 0.80m VERT. BARS SPACED @ 0.60m OC&
F-2 1.00 x 1.00 0.25 6 - 16 mm Ø BOTHWAYS
BELOW THE NAT. GRADE LN.
10mm Ø HORIZONTAL BARS EVERY
3RD LAYER

TOP OF FOOTING IS 0.60m


F-3 0.60 x 0.60 0.25 4 - 12 mm Ø BOTHWAYS
BELOW THE NAT. GRADE LN.