You are on page 1of 25

SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam

- Full

You got 80 of 80 possible points.


Your score: 100 %

Question Results

Question: Score 1 of 1

What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
Please choose the correct answer.

Response:

Goods issues

Maintenance notifications

Goods receipts

Confirmations

Question: Score 1 of 1

A material was planned in the context of SAP ECC material requirements planning and the MRP controller
subsequently processed the material by manually converting a specific planned order into a production order.

The MRP controller now accesses the current stock/requirements list and the MRP list for this material and
compares the two. Which of the following statements are true for the two lists at this stage?

There are 2 correct answers to this question.

Response:

The stock/requirements list displays the production order.

The MRP list has the status "processed".

The MRP list displays the production order.

The stock/requirements list was updated at the precise time it was accessed.

Question: Score 1 of 1

What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
Please choose the correct answer.

Response:

It triggers multilevel bottom-up scheduling.

It calculates the delay time which may occur in planning.

It propagates exception messages from a component to the finished product.


It posts planning results to the database automatically.

Question: Score 1 of 1

After a material has been included in a NETCH material requirements planning run you change its BOM (bill of
materials).

Which of the following planning file entries for this material are set by the system?
Please choose the correct answer.

Response:

The BOM explosion and the NETPL planning indicator

The BOM explosion, the NETCH, and the NETPL planning indicators

The NETCH and NETPL planning indicators

The BOM explosion indicator

Question: Score 1 of 1

Which options can you offer someone who uses the SAP ECC system for production orders and requires support for
material supply in production?

There are 3 correct answers to this question.

Response:

Logistics Information System (LIS)

Material directory

Pull list

Pick list

Automatic generation of a transport order

Question: Score 1 of 1

What does SAP ERP mean?


Please choose the correct answer.

Response:

SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.

SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management,
production and so on.

SAP ERP is a planning system in which extended planning processes can be mapped.

Question: Score 1 of 1

A new material with the following properties is to be recorded in SAP ECC. the material is kept in stock, is
externally procured, and is used as a component in the bills of material for various final products. However, this
material may not be purchased directly.

Which standard SAP material type would you use?


Please choose the correct answer.

Response:

FERT (finished product)

NLAG (non-stock material)

HAWA (trading good)

ROH (raw material)

Question: Score 1 of 1

Which of the following are properties of ECC Multi-Site Planning?


There are 2 correct answers to this question.

Response:

Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.

When using one-step stock transfer posting, transfer stock is created in the receiving plant.

The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.

When using two-step stock transport order with delivery, the receiving plant is defined as a customer.

Question: Score 1 of 1

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Response:

Stock transfers

Planned orders

Collective orders

Transfers from batch to batch

Purchase orders

Question: Score 1 of 1

Which of the following master data can be used with process orders?
There are 3 correct answers to this question.

Response:

Master recipes

Production versions

Production/resource tools
Serial numbers

Resources

Question: Score 1 of 1

Which of the following properties applies to multi-site planning in SAP ECC?


Please choose the correct answer.

Response:

The use of "scope of planning" is always mandatory for multi-site planning.

Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.

When using one-step stock transfer posting, transfer stock is created in the receiving plant.

Multi-site planning can be activated using the corresponding planning strategy.

Question: Score 1 of 1

Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus
generate run schedule quantities (RSQ) from normal planned orders?

There are 3 correct answers to this question.

Response:

A planning algorithm from capacity planning

Automatic selection of the production version by applying quota arrangement records in material requirements planning
(MRP)

Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)

Automatic selection of the production version in material requirements planning (MRP) using the selection methods
setting

Manual assignment of planned production quantities in a planning table

Question: Score 1 of 1

Which options can you offer a user of the SAP ECC system for managing costs (costing and settlement) with
regards to production orders?

There are 2 correct answers to this question.

Response:

Order-based costing

Series-based costing

Product cost collecting

Work center-based costing


Question: Score 1 of 1

You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity
bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.

Which sequence category do you use to create the second sequence in the system?
Please choose the correct answer.

Response:

Parallel sequence

Standard sequence

Finish-start relationship

Alternative sequence

Question: Score 1 of 1

In the SAP ECC system, you interpret the result of a routing schedule. When scheduling a routing in the SAP ECC
system which of the following time elements are inter operation times?

There are 2 correct answers to this question.

Response:

Processing time

Move time

Safety time

Floats before and after production

Question: Score 1 of 1

Where can you define the default storage location for the material component of a production order?
There are 3 correct answers to this question.

Response:

Production version (product)

Production supply area of a work center

BOM header (product)

Routing

Material master (component)

Question: Score 1 of 1

What master data do you need for material replenishment using the KANBAN procedure?
There are 2 correct answers to this question.

Response:

Production version
Rate routing

Product cost collector

Control cycle

Production supply area

Question: Score 1 of 1

In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

- Start: 7:00:00 a.m.


- End: 3:00:00 p.m.
- Break duration: 1 hour
- Rate of utilization: 80%
- Overload: 110%
- Number of individual capacities: 1

How large is the standard available capacity?


Please choose the correct answer.

Response:

7 hours

5.6 hours

6.16 hours

8 hours

Question: Score 1 of 1

In production order processing, for which of the following objects can you enter a confirmation?
There are 3 correct answers to this question.

Response:

Work Center

Operation / Suboperation

Individual Capacity

Order

Trigger Point

Question: Score 1 of 1

During the implementation of SAP ECC material requirements planning, the project team defines MRP controller
numbers in Customizing under the entry "Define MRP Controller" that can be assigned to the planners responsible
for the material.

Which of the following statements are correct concerning these MRP controllers?
There are 2 correct answers to this question.

Response:

In multilevel single-item planning, materials are selected using the MRP controller number.
The MRP controller number is assigned using the production version.

A planner responsible for a material can have multiple MRP controller numbers.

The MRP controller number is a central selection

Question: Score 1 of 1

Which of the following requirements for a manufacturing plant can be supported by using production orders?
There are 3 correct answers to this question.

Response:

Customer requirements-dependent production.

Make-to-stock production.

Variable calculation of material quantities (production output, material usage) and operation quantities.

Orderless production.

Integrated display of documents (drawings, texts) in the production process.

Question: Score 1 of 1

An enterprise based in the USA produces an end product that is used with the unit of measure "pound" (LB). The
material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit
kilogram (KG).

Which of the following solutions does SAP ECC offer?


Please choose the correct answer.

Response:

You create a new material with a reference to the original material and assign the metric unit of measure to the new
material master.

There is no need to take any action. There is a general conversion in the central customizing of units of measurements, so
that automatic conversion of pounds to kilograms takes place.

In the material master, you create a conversion factor for converting pounds to kilograms on basic data view 1.

In the basic data customizing, you create a unit of measure group that converts pounds to kilograms. You then assign this
to the material master on basic data view 1.

Question: Score 1 of 1

Which of the following organizational units does the manufacturing, planning, and execution process use?

There are 2 correct answers to this question.

Response:

Sales Area

Storage Location

Purchase Organization
Plant

Question: Score 1 of 1

From what point can you no longer use the Read PP master data in the production order?
Please choose the correct answer.

Response:

After assigning the confirmed quantity of a material component due to carrying out a material availability check.

After the first posting of goods movements or confirmation.

After printing the order papers.

From the release of the production order.

Question: Score 1 of 1

You set a rolling planning time fence (firming type = 1) for a material in an SAP ECC system. When an unforeseen
production failure occurs, firmed planned orders might fall into the past.

How can these firmed planned orders be deleted automatically?


Please choose the correct answer.

Response:

Use an MRP type in which the roll-forward.

Use reorganization.

Activate demand adjustment in Customizing.

Use an MRP type in which the roll-backwards mechanism is activated.

Question: Score 1 of 1

What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and thus
generate Run Schedule Quantities (RSQ) from normal planned orders?
There are 3 correct answers to this question.

Response:

Manual assignment of planned production quantities in a planning table.

Using a planning algorithm from capacity planning.

Automatic selection of the production version by applying quota arrangement records in material requirements planning
(MRP).

Automatic selection of the production version in material requirements planning (MRP) using Selection Methods setting.

Selecting a suitable repetitive manufacturing profile that contains an option for automatic line selection.

Question: Score 1 of 1

Which one of the following scheduling types cannot be assigned as default to an order type (production order)?
Please choose the correct answer.
Response:

Midpoint

Forward

Only capacity requirements

Backward

Question: Score 1 of 1

In which ways can you implement confirmations for production orders?


There are 2 correct answers to this question.

Response:

Through a SAP Manufacturing Intelligence and Integration (SAP MII) server

Through the Advanced Planning and Optimization (APO) component

Through automatic process messages using SAP NetWeaver Process Integration (PI)

Through the SAP Integrated Business Planning (SAP IBP) cloud solution

Question: Score 1 of 1

Which of the following requirements is supported by using process orders?


Please choose the correct answer.

Response:

Documentation of the production using an electronic batch record

Use of production/resource tools

Linkage of documents to orders

Use of reference operation sets

Question: Score 1 of 1

An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The
material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit
"kilogram" (KG).

What is the easiest way to fulfill this requirement?


Please choose the correct answer.

Response:

Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.

Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the
material master on basic data view 1.

There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.

Create a new material with a reference to the original material and assign the metric unit of measure to the new material
master.

Question: Score 1 of 1

Which of the following elements do you have to prepare for costing of a production order to function without
errors?
There are 3 correct answers to this question.

Response:

Enter formulas for costing in the work center.

Assign a production scheduling profile to the material master (product).

Use an operation control key with the indicator costing-relevant.

Assign costing variants to order type.

Propose a standard text key in work center.

Question: Score 1 of 1

Which function is supported by production orders?


Please choose the correct answer.

Response:

Automatic printing of order documents at order creation

Automatic creation of transfer orders at order release

Automatic selection of a work center at order release

Automatic reading of PP master data at order release

Question: Score 1 of 1

The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
Please choose the correct answer.

Response:

Planning with final assembly (strategy 40)

Planning at the assembly level (strategy 70)

Planning with make-to-stock (strategy 10)

Planning without final assembly (strategy 50)

Question: Score 1 of 1

Which of the following master data do you need to provide for process manufacturing?
There are 3 correct answers to this question.

Response:
Resources

Product cost collector

Master recipe

Production versions

Serial numbers

Question: Score 1 of 1

Which objects can affect the calculation of capacity requirements for an operation?
There are 3 correct answers to this question.

Response:

Formulas (work center)

Operation control key (routing)

Transport time (routing)

Standard values (routing)

In-house production time (material master)

Question: Score 1 of 1

What options for selecting a routing exist when creating a production order?
There are 3 correct answers to this question.

Response:

Selection on the basis of the production control profile

Automatic selection, controlled via settings in Customizing

Manual selection

Selection on the basis of the routing number in the material master for the material to be produced

Question: Score 1 of 1

Which of the following functions are available in the SAP ECC system for leveling overloads in individual work
centers with the capacity planning tools?
There are 3 correct answers to this question.

Response:

Setup time reduction

Lot size optimization

Midpoint scheduling

Batch size optimization


Finite capacity scheduling

Question: Score 1 of 1

Which of the following properties about the planning functions available in SAP ECC applies?
Please choose the correct answer.

Response:

Material requirements planning (MRP) includes automatic capacity leveling.

Master production scheduling (MPS) refers to preferred planning of important materials.

In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.

Long-term planning (LTP) is a long-term form of forecasting.

Question: Score 1 of 1

Which of the following requirements for a manufacturing plant can be supported by using process manufacturing?

There are 3 correct answers to this question.

Response:

Material requirements planning for production resources.

Master recipe-based manufacturing.

Variable calculation of material quantities (product output, material usage).

Manufacturing without orders.

Manufacturing in charge quantities.

Question: Score 1 of 1

Which of the following organizational efforts can be minimized using the KANBAN procedure?
Please choose the correct answer.

Response:

Effort for Sales and Operations Planning (SOP)

Effort for material staging

Effort for capacity planning

Effort for master data maintenance

Question: Score 1 of 1

In the SAP ECC system, a material is produced using production orders. The planning table for repetitive
manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you
select this material and then receive a message informing you that you cannot use the planning table for this
material.

Planning Table Initial Screen: Change Mode


Planning Table

No elements exist for the selection MF50 t37tdc00 INS

What could be the reason?

Please choose the correct answer.

Response:

There is no valid production version for this material.

The repetitive manufacturing indicator has been set.

There are no planned orders or production orders present.

There are no requirements present.

Question: Score 1 of 1

For which planning strategy does the reduction of planned independent requirements always occur with the goods
receipt?
Please choose the correct answer.

Response:

Planning with final assembly (40)

Gross requirements planning (11)

Planning without final assembly (50)

Net requirements planning (10)

Question: Score 1 of 1

Which functions lead to a reduction in the capacity requirement for an individual operation at a work center?
There are 3 correct answers to this question.

Response:

Rescheduling the operation

Confirming the operation

Posting the goods receipt for the production order

Reducing the order quantity

Setting the status technically complete (TECO)

Question: Score 1 of 1

In modeling in-house production using SAP ECC, bills of material (BOM) are to be recorded in the system. On which
business levels can you create a BOM?
There are 2 correct answers to this question.

Response:

At the client level


At the business area level

At the plant level

At the company code level

Question: Score 1 of 1

Which of the following statements is true for the simulation mode in the context of material requirements planning
in SAP ECC?
Please choose the correct answer.

Response:

The simulation mode opens the analysis of the delay time. Manual rescheduling of the receipt in the finished product and
subsequent requirements planning lead to a solution that is feasible from the requirements planning perspective.
However, this solution may lead to a date/time violation in the finished product.

Assuming a delay time in the critical path, the simulation mode triggers multilevel bottom-up scheduling through to the
finished product, which therefore receives a delayed receipt.

The simulation mode represents an interactive multilevel form of planning, the result of which is automatically posted to
the database after the planning run.

The simulation mode is used in scenarios in which requirements planning created the procurement element prematurely
in terms of demand.

Question: Score 1 of 1

In the course of a customer project, you are confronted with an SAP ECC system that shows the error message
displayed below when you test requirements planning in plant 1000.

Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate
requirements planning in the Customizing for plant 1000.

What further steps must you take before you can put requirements planning in plant 1000 into operation in SAP
ECC?
Please choose the correct answer.

Response:

Implement the planning files in Customizing- Specify the plant parameters for plant 1000 in Customizing

Activate requirements planning in Customizing for MRP areas in plant 1000- Specify the plant parameters for plant 1000
in the requirement planning views

Implement the planning files in Customizing- Specify the plant parameters for plant 1000 in the requirement planning
views

Create a planning file in Customizing- Specify the plant parameters for plant 1000 in Customizing

Question: Score 1 of 1

The company that you advise does not want to manage certain value-intensive materials in the warehouse stock.
Instead, the user wishes to control material provision in such a way that these materials are procured directly for
the production and/or process order.

How can you fulfill this request?


There are 2 correct answers to this question.

Response:
Using the special procurement key direct procurement/external procurement in the material master for the component

Using the special procurement key subcontracting in the material master for the component

Using the item type non-stock item in the bill of material for the material in question

Using the procurement type external procurement in the material master for the component

Controlling the material in question as a co-product

Question: Score 1 of 1

An enterprise wants to absorb the uncertainty caused by fluctuating demand for a finished product by means of a
buffer variable in SAP ECC. They suggest a dynamic safety stock.

What specifications are used to calculate the dynamic safety stock?


Please choose the correct answer.

Response:

The static safety stock and a material forecast

The average daily demand and the desired days supply

The static safety stock per day and the safety time

The average daily demand and the safety time

Question: Score 1 of 1

How can you convert planned orders into production orders in an SAP ECC system?
There are 3 correct answers to this question.

Response:

Set the conversion indicator in Customizing for the planned order.

Use the order progress report.

Automatically, in the planning run (MRP)

Use mass processing.

Use background processing.

Question: Score 1 of 1

Which data forms the basis for calculating the capacity requirement for an operation?
There are 3 correct answers to this question.

Response:

In-house production time (material master)

Transport time (routing)

Formulas (work center)


Standard values (routing)

Operation control key (routing)

Question: Score 1 of 1

Which of the following structural elements does a process order have?


There are 3 correct answers to this question.

Response:

Parallel sequences

Characteristic-based process instructions

Item data

Phases

Relationships

Question: Score 1 of 1

Which of the following organizational units can be used for planning and manufacturing in an SAP ECC system?
There are 3 correct answers to this question.

Response:

Storage location

MRP area

Distribution channel

Sales Location

Sales area

Question: Score 1 of 1

Which issue can occur if the lot size-dependent in-house production time in the material master is not updated
after changing the routing?
Please choose the correct answer.

Response:

Dependent requirements request the components from the bill of materials at wrong times when using basic dates
scheduling.

Requirements planning creates an appropriate exception message in basic dates scheduling.

Lead time scheduling cannot take place.

Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

Question: Score 1 of 1
A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements
planning. The planned orders are scheduled using what is known as basic date scheduling (not lead-time
scheduling).

Which of the following statements is true for the resulting dependent requirements?
Please choose the correct answer.

Response:

In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly.

If individual material components are explicitly assigned to operations during BOM and routing maintenance, the
requirement dates of the dependent requirements for these components are scheduled at each of the operation start
dates.

When a customer order is created for the finished product, the dependent requirements are automatically triggered for
the components in the bill of material without a planning run.

In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly
planned order.

Question: Score 1 of 1

Which of the following statements about the planning functions available in SAP ECC are true?
There are 2 correct answers to this question.

Response:

Long-term planning (LTP) is a long-term form of forecast planning.

In demand management (DM) material shortage situations are identified and given requirement coverage elements.

Master production scheduling (MPS) refers to preferred planning of important materials.

Material requirements planning (MRP) does not include automatic capacity leveling.

Question: Score 1 of 1

You want to procure your material components based on a forecast for the finished material derived from historical
sales. When customers order, you produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

Planning with final assembly (40)

Make-to-order production (20)

Planning without final assembly (50)

Production by lot size (30)

Question: Score 1 of 1

In your company planning strategies are used in the SAP-ECC demand management that are based on
consumption. Which of the following statements about consumption is true?

There are 2 correct answers to this question.

Response:
Consumption can also take place between order reservations and planned independent requirements, depending on the
strategy.

The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the
MRP group.

Consumption always takes place on the material level between the planned independent requirements and the planned
orders.

A consumption situation is dynamic and is always restructured with the planning run.

Question: Score 1 of 1

How can you limit the number of master data objects to be created when the manufacturing process is the same
for many different products?
Please choose the correct answer.

Response:

By assigning the same production version to different materials

By assigning different materials to the same routing

By creating routings with alternative sequences

By creating routings with parallel sequences

Question: Score 1 of 1

Your customer does not want to manage value-intensive materials in the warehouse. These materials should be
procured directly for the production order.

Which BOM item category must you set to fulfill this requirement?
Please choose the correct answer.

Response:

D (document item)

E (external procurement)

M (phantom material)

N (non-stock item)

Question: Score 1 of 1

You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-
specific actual data from an external process control system to SAP ECC.

How can you fulfill this requirement?


Please choose the correct answer.

Response:

Use the PI-PCS interface.

Use the PP-PDC interface.

Use the service application interface (SAPI).


Use the core interface (CIF).

Question: Score 1 of 1

In which master data object do you set the standard values for an operation?
Please choose the correct answer.

Response:

Work Center

Material Master

Routing

Production Resource/Tool (PRT)

Question: Score 1 of 1

What sequence do you follow in master data maintenance to define the production of a material?
Please choose the correct answer.

Response:

Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing

Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center

Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing

Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center

Question: Score 1 of 1

A final assembly process takes place at three work centers, one after the other. The routing, which consists of
three associated operations (10, 20 and 30), plans for a specific BOM component to be installed during operation
30 and not before. The component should therefore only be requested at the start of operation 30.

What sequence do you follow in master data maintenance in SAP ECC to make this component available in line with
operations during final assembly?

Please choose the correct answer.

Response:

1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component assignment in BOM or routing

1. Create BOM 2. Create work centers 3. Create routing 4. Carry out component assignment in work center

1. Create routing 2. Create work centers 3. Create BOM 4. Carry out component assignment in BOM or routing

1. Create work centers 2. Create routing 3. Create BOM 4. Carry out component assignment in work center

Question: Score 1 of 1

What are characteristics of repetitive manufacturing?


There are 3 correct answers to this question.
Response:

Period-based planning of the quantities to be produced

Automatic line loading based on capacity limits across all production lines

Production without using production orders and without status management

Shop fabrication

Continuous material consumption, production flow and output

Question: Score 1 of 1

What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements?
There are 3 correct answers to this question.

Response:

Resource selection

Approved master recipes

Digital signature

Electronic batch record

Availability check

Question: Score 1 of 1

Where can you define the valid receivers for production order costs?
Please choose the correct answer.

Response:

In the production scheduling profile

In the valuation variant

In the costing variant

In the settlement profile

Question: Score 1 of 1

Which of the following are characteristics of ECC master production scheduling (MPS)?
There are 3 correct answers to this question.

Response:

Non-MPS items can be taken into consideration by an MPS run.

The planning of MPS and non-MPS items is always carried out in one planning run.

MPS items can be defined on MRP area level.

MPS items are planned in a standard MRP run.


MPS items can be defined on plant level.

Question: Score 1 of 1

In SAP ECC, a customer tests the firming options for planned orders. The customer first sets the manual firming
date from the stock/requirements list to firm planned orders that shall occur in the short term.

In the material master, a rolling planning time horizon with firming type 1 is active. Some planned orders have
also been firmed manually already.

Which statement applies for the resultant firming situation?


Please choose the correct answer.

Response:

The firming interval is specified by the firming mechanism that currently stretches further into the future and which firms
planned orders that are within it; all the manually firmed planned orders are firmed independently of this.

The firming interval is specified by the planning time fence from the material master, because this always overrides the
manual firming date; all the manually firmed planned orders are firmed independently of this.

The firming interval is specified by the firming mechanism that currently stretches further into the future; all the planned
orders within this horizon are firmed only if they were previously firmed manually.

The firming interval is specified by the manual firming date because it always overrides the planning time fence from the
material master; all the manually firmed planned orders are firmed independently of this.

Question: Score 1 of 1

Which BOM selection possibilities are available for opening a production order?
There are 2 correct answers to this question.

Response:

Selection using a production version

Selection using the production scheduling profile

Selection by BOM number in the material master of the material to be produced

Automatic selection controlled with Customizing settings

Manual selection

Question: Score 1 of 1

A customer wishes to only produce a finished product when customer orders for it are present. Final assembly
should then be carried out at short notice in make-to-order production.

Up until this point, the important assemblies needed in final assembly should already be available in stock.
Provision of these assemblies should therefore be triggered by planning.

Which options could you offer the customer as useful alternatives in SAP ECC?
There are 2 correct answers to this question.

Response:

The finished product uses strategy 30 (production by lots) and all the important assemblies in the bill of material for the
finished product should have strategy 70 (planning at the assembly level).

The finished product uses strategy 40 (planning with final assembly) and all the important assemblies in the bill of
material for the finished product should have strategy 70 (planning at the assembly level).

The finished product uses strategy 50 (planning without final assembly) and all the assemblies in the bill of material for
the finished product have no strategy.

The finished product uses strategy 20 (make-to-order production) and all the important assemblies in the bill of material
for the finished product should have strategy 70 (planning at the assembly level).

Question: Score 1 of 1

You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning
procedures?

Please choose the correct answer.

Response:

Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning ->
Capacity planning

Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material
requirements planning

Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning ->
Capacity planning

Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning ->
Capacity planning

Question: Score 1 of 1

You want to use the function "Read PP master data" in the production order. However, while calling the function
you receive an error message. What could be the reason?
Please choose the correct answer.

Response:

Goods movements have been posted.

The material availability check has been performed.

Order papers have been printed.

The production order has been released.

Question: Score 1 of 1

Which of the following master data do you need to make available for repetitive manufacturing?
There are 3 correct answers to this question.

Response:

Master records for serial numbers

Product cost collector

Production supply area

Production versions
Repetitive manufacturing profile

Question: Score 1 of 1

You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting
planned orders should be scheduled using basic date scheduling (not lead-time scheduling).

Which of the following properties for the resulting dependent requirements applies?
Please choose the correct answer.

Response:

In multi-level backward scheduling, dependent requirements are calculated to the exact second.

When a customer order is created for the finished material, the dependent requirements are automatically triggered for
the components in the bill of material without a planning run.

In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the
finished material.

If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the
dependent requirements are scheduled at each start date of the operations.

Question: Score 1 of 1

What can you use to organize material staging for production orders?
There are 3 correct answers to this question.

Response:

Material documents

Logistics Information System (LIS)

Pull list

KANBAN

Transfer orders

Question: Score 1 of 1

Where are the standard operation times for an operation defined?


Please choose the correct answer.

Response:

Routing

Material Master

Production Resource/Tool (PRT)

Work Center

Question: Score 1 of 1

Which information is contained in production versions for selecting routings and bills of material?
Please choose the correct answer.

Response:

The plant for which the routing and BOM have to be created

All the control parameters for selecting routings and bills of material

The routing and BOM alternatives to be used for production

The explosion date on which the validity of the routing and bill of material is checked

Question: Score 1 of 1

In the SAP ECC system, a material is produced with the help of production orders. Though originally used for rate-
based planning only, the planning table is to be used to plan this material.

On the initial screen of the planning table, you select this material and then receive a message informing you that
you cannot use the planning table for this material.

Which one of the following reasons for this message applies?


Please choose the correct answer.

Response:

The series production indicator has not been set.

There are no requirements present.

There are no planned orders or production orders present.

There is no valid production version for this material.

Question: Score 1 of 1

What happens when a repetitive manufacturing planned order is assigned to a production line in the planning
table?
There are 2 correct answers to this question.

Response:

The system status of the planned order changes.

The planned order type changes.

The planned order generates capacity requirements.

The planned order is converted to a production order.

Question: Score 1 of 1

You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills
of material for various final products- must not be sold directly.

Which standard SAP material type do you use?


Please choose the correct answer.

Response:

NLAG (non-stock material)


HAWA (trading good)

FERT (finished product)

ROH (raw material)

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us Contact Us

You might also like