SAP ERP Production Planning and Manufacturing (PP)


Certifications Practice Exam - Mini

You got 0 of 40 possible points.


Your score: 0 %

Question Results

Question: Score 0 of 1
(skipped)
A user has entered planning strategy group 10 (make-to-stock
production) in the material master (SAP ECC) of a product. For the coming months,
requirements with requirement type LSF (derived from the main strategy 10) have
been planned.

The user would like to change the requirement type from LSF to VSF planning with
final assembly (in accordance with planning strategy 40) for requirements in the
production plan that have already been saved.

Which of the following statements are applicable in this case?


There are 2 correct answers to this question.

Response:

The user has to change the requirement type for planning strategy 10 to VSF planning
with final assembly in Customizing. The requirement type for all existing requirements
is then changed automatically.

The present requirement for the product can be changed manually from LSF to VSF in
the Requirement Type field in the production plan, so that the new strategy 40
determines the next planning operation.

The user can enter the new planning strategy group 40 in the material master of the
product, but the requirement type is not changed automatically for existing
requirements.

The planning strategy group can be changed from 10 to 40 in the existing production
plan, and the requirement type for all requirements is changed automatically.

Question: Score 0 of 1
(skipped)
In the SAP ECC system, a material is produced using production
orders. The planning table for repetitive manufacturing should be used to plan line
loading for this material. On the initial screen of the planning table, you select this
material and then receive a message informing you that you cannot use the
planning table for this material.

Planning Table Initial Screen: Change Mode

Planning Table

No elements exist for the selection MF50 t37tdc00 INS

What could be the reason?

https://www.erpprep.com/node/873/take 1/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Please choose the correct answer.

Response:

There are no planned orders or production orders present.

The repetitive manufacturing indicator has been set.

There is no valid production version for this material.

There are no requirements present.

Question: Score 0 of 1
(skipped)
How can you convert planned orders into production orders in an SAP
ECC system?
There are 3 correct answers to this question.

Response:

Automatically, in the planning run (MRP)

Set the conversion indicator in Customizing for the planned order.

Use mass processing.

Use the order progress report.

Use background processing.

Question: Score 0 of 1
(skipped)
You are using MRP controllers in an SAP ECC system. Which of the
following statements concerning MRP controllers are correct?
There are 2 correct answers to this question.

Response:

The MRP controller is maintained in production versions.

In multilevel single-item planning, materials are selected using the MRP controller.

An employee responsible for the planning of materials can be assigned to multiple MRP
controllers.

The MRP controller is a central selection criterion for evaluating material requirements
planning.

Question: Score 0 of 1
(skipped)
A project team member analyzes the following situation in SAP ECC in
the stock/requirements list for a finished product: there is only one customer order
and one fixed planned order with a similar quantity amount.
https://www.erpprep.com/node/873/take 2/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

The customer order and the planned order both have deadlines on work days but
not on the same work day; the planned order has a later deadline.

The project team member cannot find a rescheduling message referring to this
deadline misalignment in the stock/requirements list. What reasons could there be
for the missing message?

There are 2 correct answers to this question.

Response:

Requirement planning has not yet been carried out to update the rescheduling
message.

The elements are linked to each other via fixed pegging.

The time misalignment falls within the tolerance window defined in Customizing.

The requirement coverage element is outside the rescheduling horizon.

Question: Score 0 of 1
(skipped)
Which statements about the reorganization of planned independent
requirements in SAP ECC are true?
There are 2 correct answers to this question.

Response:

The reorganization only affects planned independent requirements that lie on a time
axis to the past from a specified key date.

The reorganization can be parameterized using a plant-specific reorganization interval.

The reorganization only deletes planned independent requirements that have no fixed
planned orders to them.

The reorganization is a form of demand adjustment in which non-settled planned


independent requirements for the planning are set to inactive but are not deleted.

Question: Score 0 of 1
(skipped)
Which function is supported by production orders?
Please choose the correct answer.

Response:

Automatic selection of a work center at order release

Automatic creation of transfer orders at order release

Automatic reading of PP master data at order release

Automatic printing of order documents at order creation

https://www.erpprep.com/node/873/take 3/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
In the SAP ECC system, a material is produced with the help of
production orders. Though originally used for rate-based planning only, the
planning table is to be used to plan this material.

On the initial screen of the planning table, you select this material and then receive
a message informing you that you cannot use the planning table for this material.

Which one of the following reasons for this message applies?


Please choose the correct answer.

Response:

The series production indicator has not been set.

There is no valid production version for this material.

There are no planned orders or production orders present.

There are no requirements present.

Question: Score 0 of 1
(skipped)
In SAP ECC, you want to map an in-house production process for
general warehouse production.

The fields in the area of the lot size-dependent in-house production time are to be
populated when the material master for the final product is created.

These fields can be maintained by updating from the scheduling result for the
associated routing. You now think that there could be significant changes to the
production times in the routing and decide against updating the material master.

What problem could this lead to?


Please choose the correct answer.

Response:

Subsequent capacity planning is no longer possible due to the obsolete scheduling


parameters.

Requirements planning runs up against an exception message in basic dates


scheduling because the material master parameters do not match the scheduling
result from the routing.

In the course of basic dates scheduling with requirements planning, dependent


requirements request the components from the bill of materials at the wrong times.

Lead time scheduling, which occurs by the time that a planned order is converted into
a production order (at the latest), cannot take place on the basis of incorrect basic
dates.

Question: Score 0 of 1
(skipped)
A user of the SAP ECC system wants a rolling planning time fence
(firming type = 1) to be set up for a material; in other words, new planned orders
are firmed within a planning time fence.

https://www.erpprep.com/node/873/take 4/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

When an unforeseen production failure occurs, it can happen that such firmed
planned orders are not being processed because time passes.

What solution would automatically delete firmed planned orders?


Please choose the correct answer.

Response:

In the material master, an MRP type is used in which the roll-forward mechanism is
activated (Customizing for requirements planning).

The demand adjustment activated in the Customizing for demand adjustment is used.

Firmed planned orders can only ever be deleted manually because of the header data
firming.

Question: Score 0 of 1
(skipped)
What features related to process orders can be used to fulfill Good
Manufacturing Practices (GMP) requirements?
There are 3 correct answers to this question.

Response:

Availability check

Digital signature

Resource selection

Electronic batch record

Approved master recipes

Question: Score 0 of 1
(skipped)
What could be a consequence of confirming an operation?
Please choose the correct answer.

Response:

The planned costs are updated

The capacity requirements are updated

The production order is rescheduled

The actual costs are settled

Question: Score 0 of 1
(skipped)
In which ways can you implement confirmations for production
orders?

https://www.erpprep.com/node/873/take 5/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

There are 2 correct answers to this question.

Response:

Through a SAP Manufacturing Intelligence and Integration (SAP MII) server

Through the Advanced Planning and Optimization (APO) component

Through the SAP Integrated Business Planning (SAP IBP) cloud solution

Through automatic process messages using SAP NetWeaver Process Integration (PI)

Question: Score 0 of 1
(skipped)
How can you limit the number of master data objects to be created
when the manufacturing process is the same for many different products?
Please choose the correct answer.

Response:

By creating routings with parallel sequences

By assigning the same production version to different materials

By creating routings with alternative sequences

By assigning different materials to the same routing

Question: Score 0 of 1
(skipped)
You want to create a new material that - is kept in stock- is externally
procured- is used as a component in the bills of material for various final products-
must not be sold directly.

Which standard SAP material type do you use?


Please choose the correct answer.

Response:

NLAG (non-stock material)

FERT (finished product)

ROH (raw material)

HAWA (trading good)

Question: Score 0 of 1
(skipped)
Which of the following master data do you need to provide for process
manufacturing?
There are 3 correct answers to this question.

Response:
https://www.erpprep.com/node/873/take 6/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Resources

Master recipe

Serial numbers

Product cost collector

Production versions

Question: Score 0 of 1
(skipped)
A finished material is to be planned in a controlled manner in the SAP
ECC system in the context of requirements planning. The planned orders are
scheduled using what is known as basic date scheduling (not lead-time
scheduling).

Which of the following statements is true for the resulting dependent


requirements?
Please choose the correct answer.

Response:

When a customer order is created for the finished product, the dependent
requirements are automatically triggered for the components in the bill of material
without a planning run.

In multi-level backward scheduling, dependent requirements are triggered at the start


date for the higher-level assembly.

In multi-level backward scheduling, dependent requirements are triggered at the start


date for the higher-level assembly planned order.

If individual material components are explicitly assigned to operations during BOM and
routing maintenance, the requirement dates of the dependent requirements for these
components are scheduled at each of the operation start dates.

Question: Score 0 of 1
(skipped)
You want to procure your material components based on a forecast for
the finished material derived from historical sales. When customers order, you
produce the finished product and reserve it for that particular order.

Which is the appropriate planning strategy to use?


Please choose the correct answer.

Response:

Planning with final assembly (40)

Make-to-order production (20)

Planning without final assembly (50)

Production by lot size (30)

https://www.erpprep.com/node/873/take 7/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
Which of the following situations occur when a production order is set
to Technically Complete (TECO)?
There are 3 correct answers to this question.

Response:

The order and its operations receive the system status Locked (LKD).

Reservations are deleted.

Purchase orders for external operations or non-stock materials are deleted.

The order is no longer relevant for Material Requirements Planning.

Capacity requirements are deleted.

Question: Score 0 of 1
(skipped)
Which of the following master data do you always have to make
available for material replenishment using the KANBAN procedure?
There are 2 correct answers to this question.

Response:

Control cycles

Production supply areas

Product cost collector

Rate routings

Production versions

Question: Score 0 of 1
(skipped)
Which of the following are properties of ECC Multi-Site Planning?
There are 2 correct answers to this question.

Response:

Both withdrawal from alternative plant and withdrawal from another plant are defined
via special procurement keys.

The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site
Planning.

When using one-step stock transfer posting, transfer stock is created in the receiving
plant.

https://www.erpprep.com/node/873/take 8/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

When using two-step stock transport order with delivery, the receiving plant is defined
as a customer.

Question: Score 0 of 1
(skipped)
What repetitive manufacturing options can you use to carry out line
loading in the SAP ECC system and thus generate Run Schedule Quantities (RSQ)
from normal planned orders?
There are 3 correct answers to this question.

Response:

Automatic selection of the production version in material requirements planning (MRP)


using Selection Methods setting.

Manual assignment of planned production quantities in a planning table.

Automatic selection of the production version by applying quota arrangement records


in material requirements planning (MRP).

Using a planning algorithm from capacity planning.

Selecting a suitable repetitive manufacturing profile that contains an option for


automatic line selection.

Question: Score 0 of 1
(skipped)
For which of the following objects can you enter a confirmation?
There are 2 correct answers to this question.

Response:

Production order

Production order operation

Trigger Point

Work Center

Question: Score 0 of 1
(skipped)
From what point can you no longer use the Read PP master data in the
production order?
Please choose the correct answer.

Response:

After printing the order papers.

After the first posting of goods movements or confirmation.

From the release of the production order.

https://www.erpprep.com/node/873/take 9/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

After assigning the confirmed quantity of a material component due to carrying out a
material availability check.

Question: Score 0 of 1
(skipped)
In which scenario following error message occur?

Routing selection P-100

No routing found:

Material - P-1000
Plant - 1000
Quantity - 10 PC
Explosion Date - 05.06.2009

Please choose the correct answer.

Response:

The selection method is set to "selection only by production version" in the material
master.

The routing is not valid at the explosion date.

The Customizing for the order type is set to manual routing selection and a valid
routing exists.

The material master is set to manual routing selection and a valid routing exists.

Question: Score 0 of 1
(skipped)
What does SAP ERP mean?
Please choose the correct answer.

Response:

SAP ERP is a planning system in which extended planning processes can be mapped.

SAP ERP is a system hardware that includes modules for purchasing, sales and
distribution, materials management, production and so on.

SAP ERP is a technological platform, on the basis of which customer-specific


extensions can be imported.

SAP ERP is an application that an enterprise can use to manage its business processes
efficiently.

Question: Score 0 of 1
(skipped)
Where are the standard operation times for an operation defined?
Please choose the correct answer.

Response:

https://www.erpprep.com/node/873/take 10/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Work Center

Material Master

Routing

Production Resource/Tool (PRT)

Question: Score 0 of 1
(skipped)
An enterprise based in the US produces an end product that is used
with the unit of measure "pound" (LB). The material is now to be marketed in the
EU. A prerequisite for this is that the material can be sold with the unit "kilogram"
(KG).

What is the easiest way to fulfill this requirement?


Please choose the correct answer.

Response:

Define a unit of measure group that converts pounds to kilograms in the basic data
customizing and assign it to the material master on basic data view 1.

Add a conversion factor for converting pounds to kilograms on basic data view 1 in the
material master.

Create a new material with a reference to the original material and assign the metric
unit of measure to the new material master.

There is no need to take any action. In this scenario, the conversion of units of
measurements is done automatically.

Question: Score 0 of 1
(skipped)
You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter
a plant reference. Which of the following statements describes what happens when
you try to save it?

Please choose the correct answer.

Response:

When saving the BOM, a group BOM is created which can, under certain conditions, be
assigned to a plant later.

When saving the BOM, a dialog box appears prompting the user to enter a plant.

When saving the BOM, an error message appears stating that it is not possible to save
a BOM without a plant reference.

When saving the BOM, a warning message appears. In the corresponding dialog box, it
is possible to create a plant-specific engineering BOM.

https://www.erpprep.com/node/873/take 11/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
In which of the following objects can you activate back flushing for
production orders?
There are 3 correct answers to this question.

Response:

Work center

Routing

Material master (finished product)

Material master (component)

Production scheduling profile

Question: Score 0 of 1
(skipped)
During the processing of production orders planned and actual costs
are determined. On which of the following objects can you collect these costs?

There are 2 correct answers to this question.

Response:

Production order

Product cost collector

Work center

Planned order

Question: Score 0 of 1
(skipped)
Which functions can be triggered before releasing a production order?
There are 3 correct answers to this question.

Response:

Confirmation

Selection of a routing

Scheduling

Stock determination

Selection of a BOM

https://www.erpprep.com/node/873/take 12/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Question: Score 0 of 1
(skipped)
Which of the following organizational units does the manufacturing,
planning, and execution process use?

There are 2 correct answers to this question.

Response:

Storage Location

Sales Area

Purchase Organization

Plant

Question: Score 0 of 1
(skipped)
Which of the following master data do you need to make available for
repetitive manufacturing?
There are 3 correct answers to this question.

Response:

Master records for serial numbers

Repetitive manufacturing profile

Production supply area

Production versions

Product cost collector

Question: Score 0 of 1
(skipped)
A customer has been using planning strategies 30 (production by lots)
and 10 (anonymous make-to-stock production) in SAP ECC. The customer wishes to
move in part to planning strategy 40 (planning with final assembly). The issue of
consumption has an effect here for the first time.

Which properties apply for consumption with planning strategy 40?


There are 2 correct answers to this question.

Response:

Consumption can lead to an increase of the originally planned overall production


quantity.

Consumption can result in the subsequent specification and adjustment of planning


elements in terms of quantity and date, by means of customer orders that arrive.

Consumption can reduce the originally planned production quantity.

Consumption creates a static and binding assignment, between the planned


https://www.erpprep.com/node/873/take 13/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

independent requirements recorded in advance and the customer requirements that


arrive, for the entire procurement process.

Question: Score 0 of 1
(skipped)
Which issue can occur if the lot size-dependent in-house production
time in the material master is not updated after changing the routing?
Please choose the correct answer.

Response:

Lead time scheduling cannot take place.

Dependent requirements request the components from the bill of materials at wrong
times when using basic dates scheduling.

Requirements planning creates an appropriate exception message in basic dates


scheduling.

Subsequent capacity planning is no longer possible due to the obsolete scheduling


parameters.

Question: Score 0 of 1
(skipped)
Which of the following master data is necessary for the creation of
material reservations for production orders?
Please choose the correct answer.

Response:

Material master records

Production/resource tools

Routings

Production versions

Question: Score 0 of 1
(skipped)
In the SAP ECC system, you interpret the result of a routing
schedule. When scheduling a routing in the SAP ECC system which of the following
time elements are inter operation times?

There are 2 correct answers to this question.

Response:

Safety time

Floats before and after production

Processing time

https://www.erpprep.com/node/873/take 14/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep

Move time

Question: Score 0 of 1
(skipped)
You want to produce a finished product only when it is requested by a
customer order in make-to-order production. However, all assemblies need to be
procured beforehand.

How can you fulfill these requirements in SAP ECC?


There are 2 correct answers to this question.

Response:

Use strategy 50 (planning without final assembly) for the finished product and no
strategy for all assemblies in the bill of material.

Use strategy 30 (production by lots) for the finished product and strategy 70 (planning
at the assembly level) for all assemblies in the bill of material.

Use strategy 20 (make-to-order production) for the finished product and strategy 70
(planning at the assembly level) for all assemblies in the bill of material.

Use strategy 40 (planning with final assembly) for the finished product and strategy 70
(planning at the assembly level) for all assemblies in the bill of material.

Question: Score 0 of 1
(skipped)
A customer wishes to only produce a finished product when customer
orders for it are present. Final assembly should then be carried out at short notice
in make-to-order production.

Up until this point, the important assemblies needed in final assembly should
already be available in stock. Provision of these assemblies should therefore be
triggered by planning.

Which options could you offer the customer as useful alternatives in SAP ECC?
There are 2 correct answers to this question.

Response:

The finished product uses strategy 40 (planning with final assembly) and all the
important assemblies in the bill of material for the finished product should have
strategy 70 (planning at the assembly level).

The finished product uses strategy 30 (production by lots) and all the important
assemblies in the bill of material for the finished product should have strategy 70
(planning at the assembly level).

The finished product uses strategy 20 (make-to-order production) and all the
important assemblies in the bill of material for the finished product should have
strategy 70 (planning at the assembly level).

The finished product uses strategy 50 (planning without final assembly) and all the
assemblies in the bill of material for the finished product have no strategy.

https://www.erpprep.com/node/873/take 15/16
3/3/2020 SAP ERP Production Planning and Manufacturing (PP) Certifications Practice Exam - Mini | ERPPrep