You are on page 1of 15

Doc

No:‐ BIL/MKTG/CHIMNEYS_COMP List of Projects Completed


Revision No:‐02
Rvision Date:‐01‐07‐2017 (Chimneys)

Height Type of No. of


Sl. No. Type No. Location Client Owner Plant Size(MW) Status Year
(m) Flue Flue
Hazira Manufacturing Division
1 220 Steel 2 Taper 2 Reliance Utilities & Power Pvt. Ltd. Reliance Industries Limited 5x90 Completed 2016
Hazira,Gujarat
Dahej Manufacturing Division
2 220 Steel 3&2 Taper 2 Reliance Utilities & Power Pvt. Ltd. Reliance Industries Limited 3x90 Completed 2016
Dahej, Gujarat

3 220 Brick Taper 1 Sikka, Jamnagar (Gujarat) NBCC GSECL Completed 2015

4 275 Brick 1 Taper 1 Bellary (Karnataka) BHEL BHEL 1x700 Completed 2015

5 275 Steel 2 Taper 1 Chandrapur (Maharashtra) Punj Lloyd Ltd. Dhariwal Infrastructure Ltd. 2x300 Completed 2014

6 275 Steel 2 Taper 1 Goindwal Sahib (Punjab) Punj Lloyd Ltd. GVK Power Ltd. 2x270 Completed 2014

7 220 Steel Taper 1 Hazira (Gujarat) Essar Project (I) Ltd. Essar Project (I) Ltd. Completed 2014

8 145 Taper 1 Raigad (Maharashtra) JSW Ispat Ltd. JSW Ispat Ltd. Completed 2014

9 110.5 Taper 1 Rajganjpur (Odisha) Akasva Infrastructure (P) Ltd. OCL Iron & Steel Ltd. Completed 2014

10 106 Taper 1 Paradeep (Odisha) Essar Project (I) Ltd. Essar Steel Odisha Ltd. Completed 2014

11 100 Taper 1 Nalagonda (Andhra Pradesh) Sew Infrastructure Ltd. Completed 2014

12 80 Straight 2 Paradeep (Odisha) Essar Project (I) Ltd. Essar Steel Odisha Ltd. Completed 2014

13 78 Straight 2 Rajganjpur (Odisha) Akasva Infrastructure (P) Ltd. OCL Iron & Steel Ltd. Completed 2014

14 67 Straight 3 Addis Ababa (Ethiopia) Walchand Industries Ltd. Tendaho Sugar Factory Completed 2014

15 220 Steel Taper 1 Jamnagar (Gujarat) Essar Projects (I) Limited Essar Oil Ltd. Completed 2013

16 220 Brick Taper 2 Butibori, Nagpur(Maharashtra) Reliance Infratech Limited Reliance Power Completed 2013

17 101 Taper 2 Khartoum (Sudan) Bharat Heavy Electricals Ltd. National Electricity Corporation Completed 2013

18 92.7 Straight 1 Cuttak (Odisha) Maadurga Thermal Power Co. Ltd. Completed 2013

19 275 Steel 2 Taper 1 Salaya (Guajarat) Essar Projects (I) Limited Essar Power Limited 2X660 Completed 2012

20 275 Steel 2 Taper 1 Mahan (M.P.) Essar Projects (I) Limited Essar Power Limited 2X600 Completed 2012

21 220 Brick Taper 1 Beawer (Rajasthan) Cethar Vessels Ltd. Shree Cements Limited 2x150 Completed 2012

22 220 Steel Taper 1 Gudur (A.P.) Thermax Instrumentation Ltd Completed 2012

23 275 Steel 2 Tapered 1 Udupi (Karnataka) Lanco Infratech Ltd. Udupi Thermal Power Plant 2X600 Completed 2011

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 1 of 5 Approved By:‐Mr.Sharad Asthana


Doc No:‐ BIL/MKTG/CHIMNEYS_COMP List of Projects Completed
Revision No:‐02
Rvision Date:‐01‐07‐2017 (Chimneys)

Height Type of No. of


Sl. No. Type No. Location Client Owner Plant Size(MW) Status Year
(m) Flue Flue
24 100 Tapered 1 Panipat (Haryana) Larsen & Toubro Ltd., EPC Division, Baroda IOCL Panipat Naptha Cracker Project Completed 2009

Tornagallu (Karnataka)
25 275 Tapered 1 Only design, drawing, raft & Supply of Paharpur Cooling Tower Ltd. JSW Energy Ltd. Completed 2008
slipform Equipments

26 165 Tapered 1 Zawar, Udaipur (Rajasthan) Tata Projects Ltd. Hindustan Zinc Ltd. Completed 2008

27 135 Tapered 1 Jamshedpur (Jharkhand) Tarapore & Co.. Tata Power Co. Ltd. Completed 2008

28 114 Tapered 3 Jamnagar (Gujarat) Reliance Petroleum Ltd. Reliance Petroleum Ltd. Completed 2008

29 110 Tapered 1 Durgapur (W.B.) Phillips Carbon Black Ltd. Phillips Carbon Black Ltd. Completed 2008

30 87 Tapered 1 Mahul near Mumbai (Maharashtra) BHPV Ltd. Hindustan Petroleum Co. Ltd. Completed 2008

31 80 Tapered 1 Mandideep, Bhopal (M.P.) HEG Ltd. HEG Ltd. Completed 2008

32 66.3 Straight 4 Jamnagar (Gujarat) Thermax Engg. & Constn. Co. Reliance Petroleum Ltd. Completed 2008

33 120 Tapered 1 Raigarh (Chattisgarh) Monnet Ispat & Energy Ltd. Monnet Ispat & Energy Ltd. Completed 2007

China National Machinery & Equipment


34 110 Tapered 1 Neemuch (Rajasthan) Vikram Cement Power Plant Completed 2007
Import & Export Corpn.

35 90 Tapered 1 Karur (T.N.) Tamil Nadu Newsprint and Papers Ltd. Tamil Nadu Newsprint and Papers Ltd. Completed 2007

36 87 Tapered 1 Shivganga (T.N.) Shakthi Sugars Ltd. Shakthi Sugars Ltd. Completed 2007

37 180 Tapered 1 Barmer (Rajasthan) Unitech Ltd. Rajasthan Vidyut Utpadan Nigam Ltd. Completed 2006

38 130 Tapered 1 Jamnagar (Gujarat) Essar Projects Ltd. Essar Oil Ltd. Completed 2006

39 100 Tapered 1 Panipat (Haryana) Bharat Heavy Electricals Ltd. Indian Oil Corpn. Ltd. Completed 2006

40 100 Straight 1 Jamnagar (Gujarat) Essar Projects Ltd. Essar Oil Ltd. Completed 2006

41 95 Tapered 1 Jharsuguda (Orissa) Bhushan Power & Steel Ltd. . Bhushan Power & Steel Ltd. Completed 2006

42 87 Tapered 1 Sathamangalam, Dist. Tanjavur (T.N.) Kothari Sugars & Chemicals Ltd. Kothari Sugars & Chemicals Ltd. Completed 2006

43 80 Tapered 1 Jamnagar (Gujarat) Essar Projects Ltd. Essar Oil Ltd. Completed 2006

44 72 Straight 1 Raipur (Chattisgarh) Jagdamba Power & Alloys Ltd. Jagdamba Power & Alloys Ltd. Completed 2006

45 72 Straight 1 Raigarh (Chattisgarh) R.R. Energy Pvt. Ltd. R.R. Energy Pvt. Ltd. Completed 2006

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 2 of 5 Approved By:‐Mr.Sharad Asthana


Doc No:‐ BIL/MKTG/CHIMNEYS_COMP List of Projects Completed
Revision No:‐02
Rvision Date:‐01‐07‐2017 (Chimneys)

Height Type of No. of


Sl. No. Type No. Location Client Owner Plant Size(MW) Status Year
(m) Flue Flue
46 60 Straight 1 Jharsuguda (Orissa) Eastern Steel & Power Ltd. Eastern Steel & Power Ltd. Completed 2006

47 46 Tapered 1 Jharsuguda (Orissa) Bhushan Power & Steel Ltd. . Bhushan Power & Steel Ltd. . Completed 2006

48 165 Tapered 1 Chanderiya, Chittorgarh (Rajasthan) Tata Projects Ltd. Hindustan Zinc Ltd. Completed 2005

49 130 Tapered 2 Nani Chher, Bhuj, Kutchh (Gujarat) Gujarat Mineral Development Corpn. Ltd. Gujarat Mineral Development Corpn. Ltd. Completed 2005

50 90 Tapered 1 Alathiyur, Pennadam (T.N.) Thermax Engg. Constn. Co.F108 Madras Cements Ltd. Completed 2005

51 87 Tapered 1 Renukoot (U.P.) Thermax Engg. & Constn. Co Kanoria Chemicals &Indus Ltd. Completed 2005

52 76 Tapered 3 Jharsuguda (Orissa) Bhushan Power & Steel Ltd. Bhushan Power & Steel Ltd. Completed 2005

53 45 Straight 1 Raipur (Chattisgarh) S.K.S. Ispat Ltd. S.K.S. Ispat Ltd. Completed 2005

54 80 Tapered 1 Davangere (Karnataka) Davangere Sugar Co. Ltd. Davangere Sugar Co. Ltd. Completed 2004

55 110 Tapered 1 Khopoli, Raigad (Maharashtra) Bhushan Steel & Strips Ltd. Bhushan Steel & Strips Ltd. Completed 2003

56 100 Tapered 1 Chennai (T.N.) Bharat Heavy Plate & Vessels Ltd. Chennai Petroleum Corpn. Ltd. Completed 2003

57 76 Tapered 1 Nanjangud (Karnataka) Bannari Amman Sugars Ltd. Bannari Amman Sugars Corpn. Ltd. Completed 2003

58 130 Tapered 1 Renusagar, Sonebhadra (U.P.) Larsen & Toubro Ltd. ECC Constn.Division Hindalco Industries Ltd. Renusagar, U.P. Completed 2002

Aditya Cements Ltd. Chittorgarh (Dt.),


59 98 Tapered 1 Shambhupura, Chittor (Rajasthan) GEA Energy System (I) Ltd., Chennai Completed 2002
Rajasthan

60 97 Tapered 1 Eraiyur, Cuddalore (T.N.) Supreme Renewable Energy Ltd., Chennai Shri Ambika Sugars Ltd. Cuddalore (Dt.), T.N. Completed 2002

Shri Cement Ltd. Beawar, Ajmer (Dt.),


61 96 Tapered 1 Beawar, Ajmer (Rajasthan) Thermax Cogen Ltd., Pune, Maharashtra Completed 2002
Rajasthan
Bannari Amman Sugars Ltd., Erode (Dt.), Bannari Amman Sugars Ltd.
62 77 Tapered 1 Sathyamangalam, Erode (T.N.) Completed 2002
Tamil Nadu Sathyamangalam, Erode

63 72 Straight 1 Kottur, Thanjavur (T.N.) Auro Energy Ltd., Chennai Shri Ambika Sugars Ltd. Kottur, Thanjavur, T.N Completed 2002

ACC Cement, Wadi, Gulbarga (Dt.),


64 114 Tapered 1 ACC Wadi (Karnataka) Tata Projects Ltd. Completed 2001
Karnataka
Gem Sugars Ltd., Kundargi, Mudhol,
65 78 Straight 1 Kundargi, Bagalkot (Karnataka) Gem Sugars Ltd. Kundargi, Bagalkot Completed 2001
Bagalkot

66 70 Tapered 1 Sameerwadi, Bagalkot (Karnataka) BSES Ltd., Noida The Godavari Sugar Mills, Ltd. Sameerwadi Completed 2001

67 60 Straight 1 Murum, Osmanabad (Maharashtra) Accent Constn. Shri Vitthal SSK Ltd. Maharashtra Completed 2001

68 43 Straight 1 Karempudi, Guntur (A.P.) Thermax Ltd., Pune Matrix Power Pvt. Ltd. Completed 2001

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 3 of 5 Approved By:‐Mr.Sharad Asthana


Doc No:‐ BIL/MKTG/CHIMNEYS_COMP List of Projects Completed
Revision No:‐02
Rvision Date:‐01‐07‐2017 (Chimneys)

Height Type of No. of


Sl. No. Type No. Location Client Owner Plant Size(MW) Status Year
(m) Flue Flue
69 76 Tapered 1 Nanjangud (Karnataka) Bannari Amman Sugars Ltd. Bannari Amman Sugars Ltd. Completed 2000

70 70 Tapered 1 Songadh, Surat (Gujarat) The Central Pulp Mills Ltd. The Central Pulp Mills Ltd. Completed 2000

71 60 Straight 1 Satana, Nasik (Maharashtra) Dwarkadhish Sakhar Karkhana Ltd. Dwarkadhish Sakhar Karkhana Ltd. Completed 2000

Shri Dnyaneshwar Sahakari Sakhar Shri Dnyaneshwar Sahakari Sakhar Karkhana


72 60 Straight 1 Newasa Ahmadnagar (Maharashtra) Completed 2000
Karkhana Ltd. Ltd.
Sampurnanagar, Belrayan Nanauta
73 45 Straight 3 U.P. State Sugar Corpn. U.P. State Sugar Corpn. Completed 2000
(U.P.)

74 40 Straight 1 Guna (M.P.) Krishak Sahakari Shakkar Karkhana Mydt. Krishak Sahakari Shakkar Karkhana Mydt. Completed 2000

75 125 Tapered 3 Nagda (M.P.) Grasim Industries Ltd., Nagda Grasim Industries Ltd. Completed 1999

76 100 Tapered 1 Porbandar (Gujarat) Birla VXL Ltd., Porbandar Birla VXL Ltd. Completed 1999

77 51 Tapered 1 IFFCO, Kandla (Gujarat) Thermax Ltd. Projects & Development (I) Ltd. Completed 1999

78 114 Tapered 1 Jamnagar (Gujarat) Gammon India Ltd., Mumbai Reliance Petroleum Ltd. Completed 1998

79 100 Tapered 1 Sahibabad (U.P.) Bhushan Steel & Strips Ltd. Bhushan Steel & Strips Ltd. Completed 1997

Mangalore (Karnataka) (repeat


80 94 Tapered 1 Bridge & Roof Co.(I) Ltd. MRPL Completed 1997
order)

81 117 Tapered 1 Madras (T.N.) Thermax Babcock& Wilcox Ltd. Madras Fertilisers Ltd. Completed 1996

82 40 Straight 1 Titawi (U.P.) Titawi Sugar, New Delhi Titawi Sugar Completed 1995

83 94 Tapered 1 Mangalore (Karnataka) Bridge & Roof Co.(I) Ltd. MRPL Completed 1994

84 40 Straight 1 Mawana (U.P.) Mawana Sugar Ltd., Meerut Mawana Sugar Completed 1994

85 40 Straight 1 Ludhiana (Punjab) Nahar Sugar & Allied Ltd. Nahar Sugar & Allied Completed 1994

86 60 Straight 1 Lalkuan (U.P.) Century Pulp & Paper Ltd. Century Pulp & Paper Completed 1993

87 52 Srtaight 1 Agautha (U.P.) Agautha Sugar & Chemicals Agautha Sugar Completed 1993

88 42 Straight 1 Sarjiguda (Orissa) Westen India Sugar & Chemicals Western India Sugar Completed 1993

89 40 Straight 1 Dhampur (U.P.) Dhampur Sugar Mills Ltd. Dhampur Sugar Mills Ltd. Completed 1993

90 40 Straight 1 Titawi (U.P.) Titawi Sugar, New Delhi Titawi Sugar Completed 1993

91 64 Tapered 1 Daund (Maharashtra) OEEC Ltd., New Delhi S.M. Dyechem Ltd. Completed 1992

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 4 of 5 Approved By:‐Mr.Sharad Asthana


Doc No:‐ BIL/MKTG/CHIMNEYS_COMP List of Projects Completed
Revision No:‐02
Rvision Date:‐01‐07‐2017 (Chimneys)

Height Type of No. of


Sl. No. Type No. Location Client Owner Plant Size(MW) Status Year
(m) Flue Flue
92 60 Straight 1 Lalkuan (U.P.) Century Pulp & Paper Ltd. Century Pulp & Paper Completed 1992

93 50 Straight 1 Palia (U.P.) Bajaj Hindustan Ltd., U.P. Bajaj Hindustan Ltd. Completed 1991

94 40 Straight 1 Bhuna (U.P.) The Bhuna Co.op.Sugar Mill The Bhuna Co.op. Completed 1990

95 40 Straight 1 Gorakhpur (U.P.) ATV Projects Ltd., Mathura U.P.State Sugar Corp. Completed 1989

96 100 Tapered 1 Dhrangadhara (Gujarat) Gannon Dunkerly & Co. Ltd.,Mumbai Dharangandha Chem. Completed 1988

97 40 Straight 1 Pulgaon ( Maharashtra) Vidharbha Phosphate Ltd. Completed 1987

98 220 Tapered 2 Shaktinagar (U.P.) NBCC Ltd.,New Delhi NTPC Completed 1986

99 120 Tapered 1 Gandhinagar (Gujarat) K.B.Mehta Ltd., Ahmedabad GEB Completed 1986

100 100 Tapered 1 Verawal ( Gujarat ) Gannon Dunkerly & Co. Ltd.,Mumbai GHCL Completed 1986

101 100 Tapered 1 Panipat (Haryana) Gannon Dunkerly & Co. Ltd.,Mumbai NFL Completed 1986

102 50 Straight 2 Angul (Orissa) Gannon Dunkerly & Co. Ltd.,Mumbai NALCO Completed 1986

103 50 Straight 1 Rampur (U.P.) Rampur Distillery, Rampur Rampur Distillery Completed 1986

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 5 of 5 Approved By:‐Mr.Sharad Asthana


Doc. No:‐ BIL/MKTG/SILO_COMP List of Projects‐ Completed
Revision No:‐ 02
Revision Date:‐ 01‐07‐2017 (Silos)
S. No. HEIGHT TYPE NO. LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

1 41m Iron Ore 1 Bailadila (Chhattisgarh) Shriram EPC Ltd. Shriram EPC Ltd. Completed 2015

2 40m Cement Silo 2 Aurangabad (Bihar) Shree Cements Ltd. Shree Cements Ltd. Completed 2014

3 32m Fly Ash 2 Goidwal (Punjab) Punj Lloyd Ltd. GVK Power & Infrastructure Ltd. Completed 2014

4 29.23 Fly Ash 2 Chandrapur (Maharashtra) Punj Lloyd Ltd. Dhariwal Infrastructure Ltd. Completed 2014

5 36.26m Fly Ash 3 Bhadreshwar (Gujarat) OPG Power Pvt. Ltd. OPG Power Gujarat Pvt. Ltd. Completed 2014

6 31.9m Fly Ash 2 Haldia (West Bengal) Punj Lloyd Ltd. Haldia Energy Limited Completed 2014

#
7 26m Grain Silos 39 Greater Noida (U.P.) Ahuja Builder & Contractors Ltd. Delhi Flour Mills Ltd. Completed 2014

8 21m Fly Ash 2 Rajganjpur (Odisha) Akasva Infrastructure (P) Ltd. OCL Iron & Steel Ltd. Completed 2014

9 36m Bed Ash 1 Rajganjpur (Odisha) Akasva Infrastructure (P) Ltd. OCL Iron & Steel Ltd. Completed 2014

#
10 28m Coal 8 Raigad (Maharashtra) JSW Ispat Ltd. JSW Ispat Ltd. Completed 2014

11 36m Coal # 18 Rourkela (Odisha) McNally Bharat Rourkela Steel Plant (SAIL) Completed 2014

11 Ash silos 3 Salaya,(Gujarat) Essar Projects (India) Ltd. Essar Power Gujarat Ltd. Completed 2011

12 28.5m Ash silos 3 Salaya, Jamnagar (Gujarat) Essar Projects Jamnagar Essar Projects Ltd. Completed 2011

13 28.3m Ash Silos 4 Mahan (M.P.) Essar Projects Mahan Essar Projects Ltd. Completed 2011

14 35 m Cement 2 Pishurdi, (Goa) Alcon Builders Pvt Ltd. Goa ACC Completed 2009

15 24 m Cement 1 (Goa) Desai Cement Co. Pvt. Ltd. Desai Cement Co. Pvt. Ltd. Completed 2006

The Associated Cement Companies


16 40 m Cement 1 Kalamboli, (Maharashtra) Bulk Cement Corpn. (I) Ltd. Completed 2006
Ltd.

17 Ash 1 Sambalpur, (Orissa) Bhushan Ltd. Bhushan Ltd. Completed 2005

West Bengal Power Development Corpn.


18 34 m Ash 5 KTPP, Kolaghat, (W.B.) Mahindra Ashtech Ltd. Completed 2005
Ltd.

19 18m Ash 2 Sameerwadi, (Karnataka) Indure Ltd. New Delhi Godavari Sugar Mills Ltd. Completed 2002

20 24m Cement 1 (Goa) Desai Cement Co. Desai Cement Co. Completed 1998

Prepared By:‐ Rohit Sharma

Checked By:‐Mr.Deepak Katta Page 1 of 3 Approved By:‐Mr.Sharad Asthana


Doc. No:‐ BIL/MKTG/SILO_COMP List of Projects‐ Completed
Revision No:‐ 02
Revision Date:‐ 01‐07‐2017 (Silos)
S. No. HEIGHT TYPE NO. LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

21 30m Cement 2 (Goa) Alcon Cement Ltd. Alcon Cement Ltd. Completed 1997

22 30m Cement 2 Ernakulam (Kerala) Cochin Cement Ltd. Cochin Cement Ltd. Completed 1995

23 79m Blending 1 Bela (M.P.) Jaiprakash Industries Ltd. Jaypee Bela Cement Completed 1995

24 55m Cement 1 Bela (M.P.) Jaiprakash Industries Ltd. Jaypee Bela Cement Completed 1995

25 76m Blending 1 Beawar (Rajasthan) Petron Civil Engg. Ltd. DLF Ltd. Completed 1995

26 53m Clinker 1 Beawar (Rajasthan) Petron Civil Engg. Ltd. DLF Ltd. Completed 1995

27 14m Phosphoric 1 Dharampur (M.P.) CMG Rama Phosphates Completed 1994

Blending
28 77m 1 Gaggal (H.P.) Bridge & Roof Co. (I)Ltd. ACC Ltd. Completed 1993
Prestressed

29 46m Cement 2 Kota (Rajasthan) OEEC Ltd. Mangalam Cement Ltd. Completed 1993

30 46m Cement 2 Gaggal (H.P.) OEEC Ltd. ACC Ltd. Completed 1993

31 Cement 1 Sumerpur (Rajasthan) Entech Consultancy Completed 1992

32 22m Cement 1 Jagdalpur (M.P.) Hira Cement Ltd. Hira Cement Ltd. Completed 1992

33 80m Blending 1 Kota (Rajasthan) OEEC Ltd. Mangalam Cement Ltd. Completed 1992

34 22m Cement 1 Gaggal (H.P.) Petron Civil Engg. Ltd. ACC Ltd. Completed 1992

35 45m Cement 1 Rewa (M.P.) Jaypee Rewa Cement Jaypee Rewa Cement Completed 1990

36 40m Cement 1 Rewa (M.P.) Jaypee Rewa Cement Jaypee Rewa Cement Completed 1990

37 26m Coal 1 Dudhichua (U.P.) Bhasin Associates Pvt.Ltd. Northern Coal Fields Completed 1989

38 80m Blending 1 Rewa (M.P.) Jaypee Rewa Cement Jaypee Rewa Cement Completed 1989

39 20m Clinker 1 Rewa (M.P.) Jaypee Rewa Cement Jaypee Rewa Cement Completed 1989

40 Cement 5 Gotan (Rajasthan) Oriental Electric & Engg. Co. Nihon Nirman Ltd. Completed 1988

41 Cement 3 Nawalgarh (Rajasthan) Thar Cement Ltd. Thar Cement Ltd. Completed 1988

Prepared By:‐ Rohit Sharma

Checked By:‐Mr.Deepak Katta Page 2 of 3 Approved By:‐Mr.Sharad Asthana


Doc. No:‐ BIL/MKTG/SILO_COMP List of Projects‐ Completed
Revision No:‐ 02
Revision Date:‐ 01‐07‐2017 (Silos)
S. No. HEIGHT TYPE NO. LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

42 Cement 3 (Delhi) U.P. Rajkiya Nirman Ltd. Cement Corpn.of (I) Ltd. Completed 1988

43 Cement 2 Kodinar (Gujarat) Gujarat High Tech Cement Ltd. Gujarat High Tech Completed 1987

44 Soda Ash 2 Verawal (Gujarat) Gannon Dunkerley & Co. Ltd. Gujarat Heavy Chemicals Completed 1986

45 Coal 2 Rajmahal (Bihar) Gannon Dunkerley & Co. Ltd. Eastern Coal Fields Ltd. Completed 1986

46 32m Alumina 2 Angul (Orissa) Gannon Dunkerley & Co. Ltd. Nalco, Angul Completed 1985

47 52.5m Blending 1 Tandur (A.P.) National Buildings Const.Corpn. Cement Corpn.of (I) Ltd. Completed 1984

48 44m Clinker 1 Tandur (A.P.) National Buildings Const.Corpn. N.T.P.C. Ltd. Completed 1984

Prepared By:‐ Rohit Sharma

Checked By:‐Mr.Deepak Katta Page 3 of 3 Approved By:‐Mr.Sharad Asthana


Doc. No:‐ BIL/MKTG/PT_COMP
Revision No:‐ 02
List of Projects Completed
(Prilling Tower)
Revision Date :‐ 01‐07‐2017
S. NO. Name of Client Location (India) Type of Project Size(m) Type YEAR

1 Matix Fertilizers Ltd. Burdwan , Durgapur(W.B) Painting, Louver Fixing & Misc jobs 124.5 m Steel 2016

Construction of civil work for RCC Prilling


Tower Assembly & Fixing Of Handle for
2 Essar Projects(I) Ltd. Burdwan , Durgapur(W.B) 124.5 m Steel 2014
operation of Air outlet Louvers in 125 m
High Prilling Tower

Prepared By:‐ Rohit Sharma

Checked By:‐Mr.Deepak Katta Page 1 of 1 Approved By:‐Mr.Sharad Asthana


Doc. No:‐ BIL/MKTG/CT_COMP
Revision No:‐ 02
List of Projects Completed
(Cooling Tower)
Revision Date :‐ 01‐07‐2017
S. NO. DETAILS OF STRUCTURE LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

Construction of 4 Sets of Induced Draught Reinforcement


1 Khartoum (Sudan) Bharat Heavy Electricals Ltd. National Electric Corporation Completed 2014
Cooling Tower

Construction of 7500 MT of Clinker Tank at Roorkee Grinding


2 Roorkee (Uttarakhand) Shree Cement Ltd. Shree Cement Ltd. Completed 2013
Unit and dismantling of existing Gypsum Shed

Prepared By:‐ Rohit Sharma
Issue Date:‐19‐11‐2016
Checked By:‐Mr.Deepak Katta Page 1 of 1 Approved By:‐Mr.Sharad Asthana
Doc.No:‐ BIL/MKTG/CW_COMP
Revision No:‐02
List of Projects Completed
(Civil Works)
Revision Date:‐ 01‐07‐2017
S. NO. DETAILS OF STRUCTURE LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

Balance works of Reservoir Lagoon 2 under Site Leveling and


1 Solapur (Maharashtra) NTPC Ltd. NTPC Ltd. Completed 2015
Infrastructure Works for Solapur STPP.

2 Construction of 25 lac ltr. Capacity Over Head Water Tank Bhayander, Mumbai (Maharashtra) Surindra Engg. Co. Ltd. Maharashtra Jeevan Pradhikaran Completed 2003

Design & Construction of RCC ESR of 28 lac ltr. capacity at


3 Lekhanagar, Nasik along with feeder main 600 mm dia C.I. Nasik (Maharashtra) Nasik Municipal Corpn. Nasik Municipal Corpn. Completed 2003
Pipeline

Design & Construction of RCC ESR of 15 lac ltr. capacity at


4 Nasik Road, Nasik along with rising main 450 mm dia C.I. Nasik (Maharashtra) Nasik Municipal Corpn. Nasik Municipal Corpn. Completed 2002
pipeline, staff qtrs. & fencing

Design & Construction of RCC ESR of 10 lac ltr. capacity at


5 Panchwati, Nasik along with rising main 300 mm dia C.I. Nasik (Maharashtra) Nasik Municipal Corpn. Nasik Municipal Corpn. Completed 2001
pipeline, staff qtrs. & UCR wall

Design & Construction of RCC ESR of 10 lac ltr. capacity at


6 Bhabhanagar, Nasik along with rising main 250 mm dia D.I. Nasik (Maharashtra) Nasik Municipal Corpn. Nasik Municipal Corpn. Completed 2001
pipeline, staff qtrs. & fencing

5 lac ltr. capacity Overhead Water Tank on 30m staging for Karnataka Urban Water Supply & Karnataka Urban Water Supply & Drainage
7 Hospect (Karnataka) Completed 2000
KUWS & DB Drainage Board Board

Construction of Bridge Piers (2 nos.), Sardan Bridge & Bridge


8 Jammu (J & K) T.R. Gupta Contractors Ltd. Northern Railway Completed 2000
No. 26, Udhampur for JURL Railway Bridge

Q Construction of 63m high Bridge Pylons for Cable Stayed Krishnarajapuram Bangalore
9 Afcons/Soham Engg. Hyderabad Ircon Ltd.,Southern Railway Completed 2000
Bridge by Auto Climbing Formwork System. (Karnataka)

Construction of 22.8m long x 11.8m wide x 16.5m deep Jack Mula Dam Pumping Station, Rachna Engineering Ltd. / Larsen & Maharashtra Jeevan Pradhikaran,
10 Completed 2000
Well Ahmednagar (Maharashtra) Toubro Ltd. Ahmednagar

Maharashtra Krishna Valley Development


11 Construction of 50m high Intake Well Structure Chillewadi, Pune (Maharashtra) F.A. Constn., Pune Completed 2000
Corporation

Construction of 22 storeyed Commercial Building, including


12 Gurgaon (Haryana) DLF Commercial Developers Gurgaon DLF Commercial Developers Gurgaon Completed 2000
cores by Auto Climbing Formwork System

56m high Tapered Bridge Piers (2 nos.), Dudhar Bridge,


13 Jammu (J & K) T.R. Gupta Contractors Ltd. Northern Railway Completed 1998
Udhampur for JURL Railway Bridge

14 10 lac ltr. capacity ESR on 30m Staging Hospet (Karnataka) Nagarjuna Constn. Co. Ltd. Bangalore Kalyani Steels Ltd. Completed 1997

15 ESR of 8 lac ltr. capacity Ambernath (Maharashtra) Lok Group Lok Group Completed 1996

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 1 of 4 Approved By:‐Mr.Sharad Asthana


Doc.No:‐ BIL/MKTG/CW_COMP
Revision No:‐02
List of Projects Completed
(Civil Works)
Revision Date:‐ 01‐07‐2017
S. NO. DETAILS OF STRUCTURE LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

17 108m high Urea Prill Tower & Lift Wall Core Guna (M.P.) Bridge & Roof Co. (I) Ltd. National Fertilizers Ltd. Completed 1995

18 23m high CSP Shaft Beawar (Rajasthan) Petron Civil Engg. Ltd. DLF Cement Ltd. Completed 1995

20 Central Core of 22 storeyed building (IFCI Tower) New Delhi (Delhi) Ahluwalia Contracts (I) Ltd. I.F.C.I. Completed 1994

21 25.7m high CSP Shaft Gaggal (H.P.) OEEC Ltd. ACC Ltd. Completed 1993

Kalamboli, New Mumbai


22 24.5m high ESR Shaft Kumar Constn. CIDCO Completed 1993
(Maharashtra)

23 29m high ESR Shaft Sriharikota (A.P.) Nagarjuna Constn. Co. Ltd. ISRO Completed 1993

24 60m high Lift Shaft Bhira (Maharashtra) Sewree Engg. Constn. Pvt. Ltd. Tata Electric Companies Completed 1993

25 20m high ESR Shaft New Panvel (Maharashtra) Satyam Builders CIDCO Completed 1992

Sanpada, New Mumbai


26 19m high ESR Shaft Shah & George CIDCO Completed 1992
(Maharashtra)

27 15m high Aeration Tank Thane, Mumbai (Maharashtra) New Consolidated Constn. Colour Chem Ltd. Completed 1992

28 18m high Tulip type ESR Nagpur (Maharashtra) NBCC Ltd. JNARDDC Completed 1992

29 23m high ESR Babhnan (U.P.) The Babhnan Sugar Mills Ltd. The Babhnan Sugar Mills Ltd. Completed 1992

30 Bridge Piers -60m long x 30m high Mahi, Godhra (Gujarat) Continental Constn. Ltd. Mahi Aqueduct Project Completed 1992

31 Mass housing project involving construction of 1312 tenements Bangalore (Karnataka) Nagarjuna Constn. Co. Ltd. KHB Completed 1992

32 20m high Intake Well Structure Kota (Rajasthan) CFIL Chambal Fertilizers & Chem. Completed 1991

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 2 of 4 Approved By:‐Mr.Sharad Asthana


Doc.No:‐ BIL/MKTG/CW_COMP
Revision No:‐02
List of Projects Completed
(Civil Works)
Revision Date:‐ 01‐07‐2017
S. NO. DETAILS OF STRUCTURE LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

33 U/G Storage Tanks for water Patalganga (Maharashtra) S. N. Thakker MIDC Completed 1991

34 16m high Bridge Piers (solid) . Kota (Rajasthan) RSBCC Ltd. Railways Completed 1991

35 35m high ESP Coloumn and Beam Structure (9 nos.) Rewa (M.P.) Jaypee Rewa Cement Jaypee Rewa Cement Completed 1990

36 24m high ESR Shaft Nerul, New Bombay (Maharashtra) M.B. Mulani CIDCO Completed 1990

Foundation work upto plinth for 21 storeyed residential


37 Mumbai (Maharashtra) Lokhandwala Group Lokhandwala Group Completed 1990
buildings (3 nos.)

38 Rectangular structure Bangalore (Karnataka) NBCC Ltd. CPRI Completed 1989

40 H-type Bridge Piers (14 nos.) Rayagada (Orissa) Bhagheeratha Engg. Ltd. Koraput Rayagada Railway Completed 1989

42 Lift Shaft Verawal (Gujarat) Gannon Dunkerley & Co.Ltd. Completed 1988

43 30m high Lift Shaft Mumbai (Maharashtra) Prempuriji Ashram Trust Prempuriji Ashram Trust Completed 1988

44 Residential building 17 storeyed (5 nos.),Green Acres Mumbai (Maharashtra) Lokhandwala Group Lokhandwala Group Completed 1988

Rectangular Structure for Jet Engine Testing at Indira Gandhi


45 New Delhi (Delhi) Punj Sons Pvt. Ltd. IAA Completed 1987
International Airport

46 30m high ESR Shaft Angul (Orissa) Gannon Dunkerley & Co.Ltd. Nalco Completed 1986

47 70m high TV tower Panjim (Goa) Engineering Projects (I) Ltd. AIR Completed 1985

21m high RCC Structure for Waste-to-Energy Plant. Length of


48 New Delhi (Delhi) Som Dutt Builders Pvt. Ltd. Ministry of Non Conventional Energy Completed 1985
Struts: 105m

49 72m high TV tower Kasauli (H.P.) Engineering Projects (I) Ltd. AIR Completed 1984

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 3 of 4 Approved By:‐Mr.Sharad Asthana


Doc.No:‐ BIL/MKTG/CW_COMP
Revision No:‐02
List of Projects Completed
(Civil Works)
Revision Date:‐ 01‐07‐2017
S. NO. DETAILS OF STRUCTURE LOCATION CLIENT PRINCIPAL CLIENT STATUS YEAR

50 67m high TV tower Nagpur (Maharashtra) Engineering Projects (I) Ltd. AIR Completed 1984

Prepared By:‐ Rohit Sharma

Checked By:‐Mr. Deepak Katta Page 4 of 4 Approved By:‐Mr.Sharad Asthana