This document is a quote from Triple JJJ Bldg for the supply and installation of motorized roll up shutter doors. It provides details on the customer, location, specifications of the doors being quoted including size and materials. The total cost is PHP 235,000 to supply and install two 6m x 5m motorized roll up shutter doors. Payment will be made in three stages - 30% down payment, 40% on delivery and installation, and 100% on completion. A 6-month warranty is included on the motors and accessories.
This document is a quote from Triple JJJ Bldg for the supply and installation of motorized roll up shutter doors. It provides details on the customer, location, specifications of the doors being quoted including size and materials. The total cost is PHP 235,000 to supply and install two 6m x 5m motorized roll up shutter doors. Payment will be made in three stages - 30% down payment, 40% on delivery and installation, and 100% on completion. A 6-month warranty is included on the motors and accessories.
This document is a quote from Triple JJJ Bldg for the supply and installation of motorized roll up shutter doors. It provides details on the customer, location, specifications of the doors being quoted including size and materials. The total cost is PHP 235,000 to supply and install two 6m x 5m motorized roll up shutter doors. Payment will be made in three stages - 30% down payment, 40% on delivery and installation, and 100% on completion. A 6-month warranty is included on the motors and accessories.
MARKET SITE, SAN JOSE, BALANGA CITY, BATAAN QUOTE # 20220707 (Beside Geno`s Ice Cream) CUSTOMER NAME: MR. ALEC CALMA BALUYOT +63 9756359261 LOCATION / ADDRESS: PNOC - BATANGAS 2, MARIVELES +63 9501027514 SUPPLY AND INSTALL OF MOTORIZED ROLL UP SHUTTER DOOR SIZE/DIMENSION (047) 300 0307 ILLUSTATION/DESCRIPTION (WxH in mts.) QTY. UNIT AMOUNT TOTAL AMOUNT
SUPPLY OF 100mm 1.5mm
thk. ROLL UP SHUTTER TERMS: Inclusions:
30% Down Payment 800kgs. MOTOR w/ limiter
Upon Acceptance switch
of this Quote Remote Transmitter and
Receiver Set w/ Outdoor Button 6.0 x 5.0 2 sets Php 117,500.00 Php 235,000.00 40% Progress Billing switch w/ lockset Upon Delivery to site Removable Mid Post and Installation. Exclusions: 100% Full Payment Upon Completion H-Frame and Scaffolding Access PPE 6 months Warranty on Other Requirements and Permits Motors and Accessories Covid-19 Tests and Other VAT Exclusive related requirements.