Site Name: QC2 

Apr 1, 2023 - Apr 30, 2023 ▼

Client Name: Alibaba


Location: 3rd Floor DH1 & DH2 
UPTIME Average Aggregated Temp.  Average Supply Air Temp.  Average Aggregated RH Average Supply Air RH 
( 18°C - 27°C ) ( 20°C - 24°C )  ( 30% - 70% ) ( 40% - 60% )
Scorecard
100% 23.6°C 23.5 °C 55 % 55 %

Average Supply Temperature & Relative Humidity

Average Supply Air Temp Average Supply Air RH


100

50

0
… … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
23 23 23 23 23 23 23 23 23 23 23 23 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02
, 20 , 20 , 20 , 20 , 20 , 20 , 20 , 20 , 20 , 20 , 20 , 20 0, 2 1, 2 2, 2 2, 2 3, 2 4, 2 5, 2 6, 2 6, 2 7, 2 8, 2 9, 2 0, 2 0, 2 1, 2 2, 2 3, 2 3, 2 4, 2 5, 2 6, 2 7, 2 7, 2 8, 2 9, 2 0, 2
1 1 2 3 4 4 5 6 7 8 8 9 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 3
p r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r

Average Aggregated Temperature & Relative Humidity

Aggregated Temp… Aggregated Humidity…


60

40

20

0
23 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023 023
20
r 1, r 1, 2 r 2, 2 r 2, 2 r 3, 2 r 3, 2 r 4, 2 r 4, 2 r 5, 2 r 5, 2 r 6, 2 r 6, 2 r 7, 2 r 8, 2 r 8, 2 r 9, 2 r 9, 2 10, 2 10, 2 11, 2 11, 2 12, 2 12, 2 13, 2 14, 2 14, 2 15, 2 15, 2 16, 2 16, 2 17, 2 17, 2 18, 2 18, 2 19, 2 19, 2 20, 2 21, 2 21, 2
Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r Ap r

Power Status

UPS A1 UPS B1

100% Load on Inverter 100% Load on Inverter

EQUIPMENT PREVENTIVE MAINTENANCE


TIMESTAMP ▼
EQUIPMENT PM STATUS REMARKS
No data

FACILITY ACTIVITIES
TIMESTAMP ▼
ACTIVITY NAME ACTIVITY STATUS REMARKS
1… Apr 27, 2023 Quarterly Preventive Maintenance of 3F UPS A and 3F UPS B (Non-Intr… DONE ACTIVITY WAS SUCCESSFULLY COMPLETED.

2… Apr 24, 2023 Quarterly Preventive Maintenance of Chiller 1 & Chiller 2 DONE ACTIVITY WAS SUCCESSFULLY COMPLETED.

3… Apr 22, 2023 Monthly Genset Testing with Building Loads DONE ACTIVITY WAS SUCCESSFULLY COMPLETED.

                             CONFIDENTIAL - PROPRIETARY 1-3/3 < >


Unauthorized disclosure internally or externally is prohibited.
Apr 1, 2023 - Apr 30, 2023 ▼

MONTHLY ELECTRICAL CONSUMPTION (KWHR)


KWHR
20K

17,038
15K

10K

5K

0
Apr 1, 2023

MONTHS

CUT - OFF DATES ▼


ELECTICAL PANELS PREVIOUS READING PRESENT READING POWER CONSUMPTION TOTAL CONSUMPTION
1. Mar. 26, 2023 - Apr. 25 ,2023 DP-3F-DH1-RA-B 101410 106750 5340 17,038
2. Mar. 26, 2023 - Apr. 25 ,2023 DP-3F-DH1-RA-A 101300 106630 5330

3. Mar. 26, 2023 - Apr. 25 ,2023 DP-3F-DH1-RB-A 57902 60853 2951

4. Mar. 26, 2023 - Apr. 25 ,2023 DP-3F-DH1-RB-B 66661 70078 3417

1-4/4
< >
                             CONFIDENTIAL - PROPRIETARY
Unauthorized disclosure internally or externally is prohibited.
POWER METER  - MARCH 26, 2023 - APRIL 25, 2023 (PHOTO REFERENCE)

PREVIOUS READING PRESENT READING PREVIOUS READING PRESENT READING

DP-DH1-RB-B DP-DH1-RB-A
POWER METER  - MARCH 26, 2023 - APRIL 25, 2023 (PHOTO REFERENCE)

PREVIOUS READING PRESENT READING PREVIOUS READING PRESENT READING

DP-DH1-RA-B DP-DH1-RA-A