11
17
Assure
MWDR527 MWDR 25 KALIKOT Yes 2022/11/21
18 solutions
19 MWDR548 VSV MWDR 25 KALIKOT Yes 2022/11/18
21
22
Assure
23 MWDR581 MWDR 25 RUKUM_E Yes 2022/3/23
Solutions
24 MWDR583 ABC MWDR 25 RUKUM_E Yes 2022/3/26
25
26 MWDR600 SUNSHINE MWDR 25 BANKE Yes 2021/11/18
Assure
27 MWDR609 MWDR 25 DAILEKH Yes 2022/8/11
solutions
28
36
37
Heramb/
38 MWDR667 MWDR 25 PYUTHAN Yes 2022/10/22
Colt
39
Khadka
CDR934 CDR 25 KAVRE Yes 2022/10/15
Engineering
40
41 CDR1047 GENESIS CDR 25 SINDHUPALCHOWK Yes 2022/8/24
42
43 CDR1098 DIP Kiran CDR 25 SINDHULI Yes 2022/9/25
Snag Details
Responsible pers Material requirement
Cable 35sqmm
1. LA value is high.
Shanta
3. TGB-1 busbar missing.
4. EGB to TGB YG cable missing. 45
2. LA=35
Shanta
3. Phase L3 not in supply
Shanta
6. NEA cable should route properly.
1. LA value high
2. Earth PIT construction not done. Shanta
21. NEA power connection from pole to submeter not routed properly, extra
cable left hanging,
Shanta NA
27. Earthing not measured/no megger (no subcon on site),
Grounding value
45
power problem
earthing PIT
45
to be solved on mutual understanding
power problem
NA power problem
45 grounding value
grounding value
35
35 grounding value
grounding value
grounding value
grounding value
grounding value
35 AWL cable
grounding value
grounding value
45 AWL
35 Grounding value
Grounding value
SPD
Grounding value
35 SPD CW
NA Grounding value
35 3
Grounding value
Grounding value
Grounding value
575
on timeline
Site ID Snags Responsible Person
Apr-week 2
power problem
grounding value Apr-week 2
Apr-week 2
grounding value
Apr-week 3
45 45
CW Apr-week 2
Grounding value Apr-week 3
Apr-week 3
AWL, LA rod
Grounding value Apr-week 3
Apr-week 3