You are on page 1of 1

ANCHOR BOLT INSTALLATION REPORT

PROJECT: PENTA OCEAN-PROPOSED ERECTION OF A 20 STOREY ELECTIVE CARE CENTRE


AND NATIONAL DENTAL CENTRE WITH 4 BASEMENTS AT SECOND HOSPITAL AVENUE
(BUKIT MERAH)
LOCATION: PLOT H8

Dear MR/Mrs,

This following item was installed and completed as per reference drawing. To be noted that
our scope for installation of anchor bolt.

S/N GRID LINE TOTAL ANCHOR BOLT PER FOOTING


1 DA1/6 6
2 C/6D/15 6
3 B/6D/15A 610
4 D/817 610
5 D/1018 610
6 D/1219 610
7 D/1320 6
8 D/14C/20 6
9 A1/8B/20 6
10 A1/1014 6
11 A1/1215 6
12 A1/1315A 610
13 A1/17 10
14 A1/18 10
15 A1/19 10
16 A1/20 6

Please refer to the attached drawing.


Thanks,

Regards,

TOH LEONG SENG DATE:


59/5/2023
SENIOR PROJECT MANAGER
DLE STEEL INTERNATIONAL PTE LTD