You are on page 1of 2

AT - SRIBANTA PUR, P.

O- HARIDASH PUR
DIST- JAJPUR. Odisha- PIN (755024)
8327771903, 9556406900
santoshnayak6900@gmail.com

SANTOSH NAYAK

OBJECTIVE Electrical Engineer with more than 8years of Experience in Rural Electrification Projects,
Power Distribution works and Operation & Maintenance activities. Currently working as
District Coordinator (Meter Management Group) in ‘Shyam Indus Power Solutions Pvt. Ltd’
in Baudh District of Odisha(TPSODL). Self-motivated and determined for timely Execution
and completion of assignments. ‘Line Man MV’ License Holder from Electrical Licensing
Board of Govt. of Odisha.

SKILLS & Rural Electrification, Power Distribution, Operation & Maintenance, Site Execution, Electrical Erection &
ABILITIES Commissioning, Energy Meter Management, EPC Project, DDUGJY, SOUBHAGYA, IPDS.

EXPERIENCE DISTRICT COORDINATOR (MMG) IN SHYAM INDUS POWER SOLUTIONS PVT. LTD. (TPSODL)
23rd Jan 2023 to Present
 Responsible for planning and monitoring of Meter Management Group for daily meter
installation in all HT and LT consumer premises as per the instruction from TPSODL.
 Responsible for new consumer number creation and reporting to TPSODL with proper
documentation as per OERC guidelines.
 Performed installation of HT metering unit and LTCT unit for 3-ph consumers with Prepaid meter
Installation in HT and Commercial consumers.
 Performed survey for new domestic consumers, un-meter consumers, Defective meter
consumers and prepare CIS for the same.
 Performed smart meter installation and with proper documentation as per TPSODL guidelines.
 Performed DT metering with LTCT operated DLMS meters with GSM modems.
SUPERVISOR (DIVISION IN-CHARGE) IN IMPELCO ELECTRIC COMPANY
27th May 2022 to 21st Jan 2023
 Turnkey Electrical Maintenance Project for strengthening of Existing Electrical Infrastructure in
TPCODL - Angul Division, TPCODL Erstwhile CESU – ODISHA.
 Performed operation and maintenance activity of all existing 33kv HT line, 11kv HT Line, LT Line,
33/11kv Sub-Station of TPCODL-Angul division.
 Conducting Survey of Existing Electrical Infrastructure for fault tracing in 33KV Feeder Lines and
33/11kv Sub-Station and responsible for fault restoration.
 Monitoring SOP of Safety at site when work execution proceeds under shutdown.
 Managing Site manpower as per requirement of work.

SITE ENGINEER IN MANIPAL ENERGY AND INFRA LIMITED


3rd Aug 2020 to 21st May 2022
 Conducting Survey of Existing 33KV & 11KV Lines in the Specified Elephant Movement Area for
conversion work from existing bare ACSR Conductor to XLPE HT AB Cables.
 Preparing SLD as per survey conducted and estimating materials to be consumed.
 Helping my senior for preparing BoQ and finalising all required material quantity.
 Monitoring Safety at site when work execution proceeds under shutdown.
 Preparing Daily progress report and reporting to my project manager regularly.
 Preparing SLD with material consumption and material reconciliation of Subcontractors.
JUNIOR ENGINEER IN SRI GOPIKRISHNA INFRASTRUCTURE PVT LTD.
19th Sep 2017 to 31st July 2020
 Rural Electrification Project SOUBHAGYA & DDUGJY, Lohardaga, Jharkhand.
 Conducting Survey of Villages for new Rural Electrification Infrastructure work including
Distribution Transformer, New LT Lines, HT Lines & Consumer survey For Energy Meter
Installation.
 Performing Distribution Transformer installation with LV switchgear panel installation.
 Surveying for New 11KV Agricultural Feeders and Domestic feeders preparing Survey SLD.
 Preparing SLD and Material Consumption for JMC and Engaged in Execution activities of
Agricultural feeders and new 33KV Lines and Power Sub-stations.
 Taking Responsibility of all planning Execution activity of Rural Electrification infrastructure.
 Regular Coordinating with sub-contractors for progress and issuing of materials time to time for
uninterruptible work.

JUNIOR ENGINEER IN GUPTA POWER INFRASTRUCTURE LTD.


Aug 2016 to Sep 2017
 Responsible for Survey of villages for Rural Electrification works and all Electrification
infrastructure, Activities including LT, 11KV & New Energy Meter connections.
 Planning for Execution activity in Villages with priority basis as directed by client.
 Maintaining daily progress report & regularly reporting to Project Manager.
 Cooperating Sub-Contractors for execution activities, planning for DTR installation.
 Surveying for New 11KV Feeders and Domestic feeders preparing Survey SLD.
 Preparing SLD and Material Consumption for JMC for Billing to my company.

TECHNICIAN IN FEEDBACK DISTRIBUTION COMPANY LTD.


Aug 2013 to July 2014
 Single phase & Three phase Energy Meter Installation in Domestic as well as Commercial
Connection.
 LTDB (LT Switchgear Box) and LTCT Metering unit Installation in Distribution transformers.
 Regular inspection and checking for Energy Theft and Coordinating Vigilance staff mainly for
Energy theft.
 Cooperating Sub-Contractors for execution activities, planning for DTR installation.
 Making Cable connection and joint proper and Individual responsible for LT Line Maintenance
activity in particular area assigned.

EDUCATION  Kalinga Institute Engineering & Technology F.C Project, Jajpur (Odisha)- Diploma in Electrical Engg.
 Ganesh Institution of Engineering and Technology Jajpur (Odisha)- ITI Electrician
 Secondary/10th – Board of Secondary Education, Odisha.

COMPUTER & IT  Post Graduate Diploma in computer Application (PGDCA).


SKILLS  Microsoft Office, Windows-7, Windows-8, Windows- 10.

PERSONAL  FATHER’S NAME: BABAJI CHARAN NAYAK


DETAILS  Marital Status: Unmarried  DOB: 28/12/1992
 Nationality: Indian  Gender: Male
 Language Known: Odia, Hindi, English.  Religion: Hindu

DECLARATION I do hereby declare that all the information provided by me is true to the best of my knowledge.

Name: Santosh Nayak signature:

Page 2

You might also like