Status of EIC supply orders for BF-2

Total no. of
Sl No. Supply Package Description Ordered TR released Delivered Remarks
orders
1 ECR & R-I/O rooms 23 16 18 6 ACDB for UPS & MV soft starter
2 Field Electrics 37 9 10 3 Lot - 1 Cables for BF - 2
3 Field Instruments 27 13 14 2 Analysers
4 OEM Packages 7 1 1 0
5 Total 94 39 11

Status of EIC Contracts for BF - 2


Total no. of Resource
Sl No. EIC Contracts Ordered TR released Remarks
orders available
1 EIC installation packages 3 1 2 1 Balance TR by 12-May-23
2 OEM Services 8 0 0 0
3 Supervision Services
4 Electromechanical Services
5 TSK - In House 2 NA NA 0
6 Total 13 1 1
Status of EIC equipment supplies in ECR's & R-I/O rooms of BF - 2
Sl No Item Description Status PO/ RFQ No.

1 6.6KV Switchboard & RCP Ordered 2300050319


2 Dry Type Transformers Ordered 2300051999
3 415V, PCC & Bus Duct Ordered 2300052919
4 Intelligent MCC/ PMCC Ordered 2300056470
5 220V Charger, DCDB & Battery Ordered 2300051821
6 UPS & Battery Ordered 2300053210
7 ACDB for UPS (RFQ - 4914) Not Ordered TR: 31.03.23
8 Maintenance PDB & MLDB Ordered 3700875268
9 MLDB & Maint. PDB Ordered 3700875267
10 Relay Panel Ordered 2300057919
11 PLC & R-I/O Panels Ordered 2300049885
12 MV VFD for CH Dedusting Ordered 2300052235
13 LV VFD (In EM Scope of supply) Ordered Ordered
14 MV Soft starter for ID Fan (RFQ - 3713) Not Ordered TR: 09.03.23
15 600KVA DG with Sync. Panel Ordered 2300056392
16 iMCC EvapCo./ PCI iMCC (RFQ - 2744) Not Ordered TR: 15.05.23
17 BLT Drive Ordered 2300052563
18 11KV Bus Duct & Metering panel for TRT Ordered 2300063235
19 DC Starter panel for TRT Ordered 2300055944
20 Belt watch panel Not Ordered
21 Operator desk & Large video wall Not Ordered
22 R-I/O panels for PCI Not Ordered
23 Weighing system for PCI Not Ordered
& R-I/O rooms of BF - 2
Cost estimate
Remarks
(in crores)

Expedite order placement 0.86

Change Order for delivery/ validity extension


Change Order for delivery/ validity extension

Expedite order placement 0.7

Expedite TR for order placement 0.65

0.5
Status of EIC equipment supp
Sl No Item Description Status PO/ RFQ No. Agency

1 R-I/O Panels Ordered 2300049885 M/s ABB


2 Relay Panels Ordered 2300057919 M/s Pyrotech Electronics
3 Control/ Operator desks
Status of EIC equipment supplies in R-I/O rooms & Pulpit of BF - 2
Furnace Top 0.0 Mtr 4.0 Mtr Cast House PCI R-I/O
Delivery Date Stoves
R-I/O R-I/O R-I/O Pulpit E-Room

31-Mar-23 Delivered Delivered Delivered Jul-23 Jul-23 Aug '23


30-Sep-22 NA NA NA NA Aug-23 NA
Jun-23 Jun-23 NA NA Aug-23 NA
Remarks
Status of Field Electrics supplies of BF - 2

SL. No. Package Description Ordering Status

Lot - 1 Ordered
COBP Surplus items Ordered
1 Cable Tray & Earthing Strip
Lot - 2 Not Ordered
Lot - 3 Not Ordered
Lot - 1 Not Ordered
2 Cables
Lot - 2 Not Ordered
Conventional Not Ordered
3 PJB, CJB, IJB
Special application Not Ordered
4 PDBs for Hoist and Maint. Package Ordered
5 Lighting Transformer Package Not Ordered

Lighting Distribution Boards Lot - 1 Not Ordered


6
(SLDB/ MCB DB) Lot - 2 Not Ordered
Ordered
Lot - 1 Ordered
Ordered
7 Light Fixtures
Not Ordered
Lot - 2 Not Ordered
Not Ordered
Light fittings Not Ordered
Enclosures/ PJB/ CJB Not Ordered
8 Flame proof fixtures
LCS/ LPBS Not Ordered
Power Receptacles Not Ordered
9 Aviation Light with CP Package Not Ordered
10 Power receptacles Package Not Ordered
ZSS Ordered
PCS Not Ordered
11 Conveyor Protection devices BSS Not Ordered
BRS Not Ordered
CBS/ MJM Ordered
12 MHM & MTM for MCC Package Ordered
13 Limit Switch(LS) & HD LS Package Not Ordered
14 LCS/ LPBS Package Ordered
15 Hooter Panel Package Ordered
16 Hooter Package Not Ordered
17 Lightning Protection Package Not Ordered
18 Termination Kit Package Not Ordered
19 Fire Safety Fire extingusher Not Ordered
20 Fire Protection Board/ Paint/ Sealant Not Ordered
21 Insulation mat HV/ MV/ LV Not Ordered
Padlocks Not Ordered
22 Positive Isolation system
Isolation boxes Not Ordered
trics supplies of BF - 2
Pur. Order/ Cost Estimate
Vendor Name ARC Reference ARC Validity
Del. Order (in crores)
M/s Premiere NA NA 2300062646 5.4
NA NA NA NA 3.58
NA NA 1.9
NA NA 8
NA NA 21.7
NA NA 25
M/s Rupa Electrical 4700103164 28-Jul-23 0.52
NA NA 0.2
M/s Rupa Electrical NA NA 2300058175
0.13
4700111994 1.28
4700111994 1.41
M/s Havells 4700106690 30-Nov-23
M/s Trimurty 4700106693 30-Nov-23 0.23
M/s Techno Electr. 4700106691 30-Nov-23
M/s Havells 4700106690 30-Nov-23
M/s Trimurty 4700106693 30-Nov-23 0.46
M/s Techno Electr. 4700106691 30-Nov-23

0.7

Sigma Sales 4700096580 31-Mar-23 0.25


0.3
M/s Jayashree NA NA 2300053715

0.04

Jayshree 2300055679
M/s Anand Utilities 2300056743
0.01
M/s Manish Trading 4700094603 31-Dec-22
Rupa Electrics 2300055825
0.03
M/s Gayatri 4700105178 30-Sep-25 4700105178 0.4
M/s Shreelaxmi 4700095334 30-Oct-24 4700083167 0.5

0.2

0.04

0.02
Statu

SL. No. Package Description Ordering Status

1 PT, FT, DPT, TT Pkg - 1 Ordered


2 Gauges & Switch Pkg - 2 Ordered
3 B&S Type Thermocouple Pkg - 3 Ordered
RTD Not Ordered
4 RTD & Thermocouple
Thermocouple Not Ordered
5 Moisture Tx Pkg - 5 Ordered
6 Gas Monitors Pkg - 6 Ordered
7 Venturi & flow elements Pkg - 7 Ordered
8 Instrument erection hardware Pkg - 8 Not Ordered
9 Pyrometer Pkg - 9 Ordered
10 Dip Temperature lance Pkg - 10 Ordered
11 Analyzers Pkg - 11 Not Ordered
12 Burner control flame detection Pkg - 12 Ordered
13 LCP for shut-off valve & sub-DB Pkg - 13 Ordered
Level switch Ordered
14 Level measuring inst.
Radar transmitter Ordered
15 Load Cell & Belt Scale Package Ordered
16 Wireless transmitters Package Not Ordered
17 Tripper positioning system Package Not Ordered
18 Level - 2 with tuyere cam monitoring Package Not Ordered
19 Process historian Package Not Ordered
20 Network cables & accessories Package Not Ordered
21 Instrument package - PCI existing Package Not Ordered
22 Weigning system - PCI existing Package Not Ordered
23 R-I/O panels - PCI existing Package Not Ordered
24 Sub-DB's for UPS Package Not Ordered
25 Vibration monitoring Package Not Ordered
26 Furnace top camera monitoring Package Not Ordered
Status of Field Electrics supplies of BF - 2
Pur. Order/
Vendor Name Lead time ARC Reference ARC Validity Delivery date
Del. Order
M/s Endress Hauser 3 months 2300062700 8/23/2023
M/s Forbes Marshall 2 months NA NA 2300058638 31-Dec-22
M/s Yamari India 3 months NA NA 2300057482 31-Mar-23
4700096014 31-Mar-23
4700096014 31-Mar-23
M/s Berthold Tech. 3 months NA NA 2400002160 5-Aug-20
M/s Amit Enterprises 2300063055 8/26/2023
M/s Engg. Specialities 2 months NA NA 2300057629 7/11/2022

M/s Fox Solutions 3 months NA NA 2300060013 31-Mar-23


M/s Arrdy Engg. & Innovn. 2300061655 22-Feb-23

M/s Industrial Sales & Ser. 3 months NA NA 2300058736 1/15/2023


M/s Pyrotech Electronics 3 months NA NA 2300058132 30-Sep-22
M/s Nivo Control NA NA 2300060141 31-Mar-23
M/s Vega NA NA 2300060143 31-Mar-23
M/s Minebea Intec NA NA 2300058226 30-Sep-22

4700095965 28-Nov-23
Material
Engg. Status Mfg. Clearance Remarks
Delivery/ Rqd.
Completed
Completed Released Awaited Delivery extension reqd.
Completed Released Awaited Delivery extension reqd.
ARC validity extension reqd.
ARC validity extension reqd.
Completed Awaited Delivery extension with PV reqd.
Completed
Completed Released Part Delivered 80-110; 300-360; 410-420

Completed Awaited Delivery extension reqd.


Delivery extension reqd.
Completed Essentiality Note under approval
Completed Delivered
Completed Released Awaited Delivery extension with PV reqd.
Completed Released Delivered
Completed Released Awaited Delivery extension reqd.
Completed Released Awaited Delivery extension reqd.
TR under preparation
TR under preparation
Under tech. discussion
Under tech. discussion
ARC req. to meet exigencies
To be confirmed
To be confirmed
TR under preparation

TR under preparation
Status of Field Ele

SL. No. Package Description Ordering Status Vendor Name Lead time

Fire detection & Alarm Lot - 1 Not Ordered M/s Siemens 2 months
1
System Lot - 2 Not Ordered 2 months
2 Wireless Communication Package Not Ordered 3 months
3 PA System Package Not Ordered 3 months
4 CCTV System Package Not Ordered 3 months
5 Telephone System Package Not Ordered 3 months
6 Cable entry sealing Package Not Ordered 3 months
7 Communication backbone Package Not Ordered 2 months
Status of Field Electrics supplies of BF - 2
Pur. Order/ Material
ARC Reference ARC Validity Delivery date Engg. Status Mfg. Clearance
Del. Order Delivery/ Rqd.
Remarks

Change order in progress


List of Ser
Sl No Type Order Description
1 Erection EIC installation in DU - 1
2 Erection EIC installation in DU - 2
3 Erection EIC installation in DU - 3- Stockhouse & PCI
4 Erection EIC installation in DU - 3- Blower
5 OEM Services Communication packages of BF-2
6 OEM Services Fire detection & Alarm System
7 OEM Services Wireless Communication
8 OEM Services PA System
9 OEM Services CCTV System
10 OEM Services Telephone System
11 OEM Services Cable entry sealing
12 OEM Services Straight through joint & end termination
13 Supervision Installation, testing & commissioning of 6.6KV Board
14 Supervision Installation, testing & commissioning of LCSS
15 Supervision Installation, testing & commissioning of PMCC/ iMCC
16 Supervision Installation, testing & commissioning of 220V DC System
17 Supervision Installation, testing & commissioning of UPS
18 Supervision Installation, testing & commissioning of ABB Automation system
19 Supervision Installation, testing & commissioning of control desks & video wall
20 Supervision Testing & commissioning of Relay Panels
21 Supervision Testing & commissioning of R-I/O panels for PCI
22 Supervision Installation, testing & commissioning of BLT drive
23 Supervision Installation, testing & commissioning of MV VFD
24 Supervision Installation, testing & commissioning of LV VFD
25 Supervision Installation, testing & commissioning of MV Softstarter
26 Supervision Installation, testing & commissioning of DG Set
27 Supervision Installation, testing & commissioning of iMCC EvapCo./ PCI iMCC
28 Supervision Testing & commissioning of PCS/ BSS/ ZSS/ BRS/ MJM/ Belt watch
29 Supervision Installation, testing & commissioning of weighing system
30 Supervision Installation, testing & commissioning of Belt scales
31 Supervision Installation, testing & commissioning of MHM & MTM of MCC
32 Supervision Testing & commissioning of Shut-off valves
33 Supervision
34 Supervision
35 Supervision
36 Supervision
37 Supervision
38 Supervision
39 Supervision
40 Supervision
41 Supervision
42 Supervision
43 Supervision
44 Supervision
45 TSK In-house Testing of all Electrics & Motors
46 TSK In-house CEI drawing approval & inspection

Ordering Completed
Procurement Action reqd.
List of Service contracts for BF - 2
Area Estimated cost ARC Work Order/
Agency ARC Validity
(Unique/ Global) (in crores) Reference Delivery Order
Unique 11 M/s Miraj
Unique 14
Unique 10
Unique 6
Unique
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Global
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Unique
Completion
Remarks/ Status
Date

You might also like