• System Preparation
• Parameters to be maintained
A Simplified sketch of Lube Oil System
Lube Oil General Daigram
LUBE OIL INLET
HEADER
DISCHARGE
TURBINE COMP
SUCTION
C
TURBINE COMPRESSOR
DRAIN HEADER DRAIN HEADER
LUBE HEADER PRESSURE: 2.5 TO 3.0 KG/CM2 MONITOR DRAIN OIL TEMP.
JOURNAL BEARING PRESSURE : 1.5 TO 1.75 KG/CM2 ENSURE OIL FLOW THROUGH OHT.
• Parameters to follow
Parameters
• Governing oil pressure: 8 atg
• Trip oil pressure : 7 atg
• Sec Oil Pr. : 1.5atg-4.5 atg
• WWG signal : 4MA-20MA
• Valve Lift : 0 mm-full
scale
• Governing oil temp : 50-60 deg c
• Max & Min Extr signal thro’ WWG &
compare with diagram
OS GOVERNOR
MAIN SOLENOID
VALVE OST TESTER TRIPPING
PUMP DUPLEX FILTER DEVICE
STARTING
ESV DEVICE
I / H CONVERTOR
SERVOMOTOR
GOV.
VALVE
WOOD WARD
GOVERNOR
Condensate and evacuation
system
• System preparation
• Parameters to follow
STEAM INLET
TURBINE
GLAND STEAM
INLET
CONDENSER
A B
DEAIRATOR
AIR VENT
HP STAGE LP STAGE
CW CW
HP DRAIN INLET OUTLET
CODENSER
LP DRAIN
Parameters
• Hotwell level -Normal 60%
• CW to condenser- 1.5-2.5 atg
• Condensate pump Disch Pr. 8-10 atg
CW system
Preparation
• CW to Lube oil coolers ready
• CW to condenser ready
• CW to Coppus turbines ready
• C W to ejector condenser
• CW to ejector condenser
Start up diagram
• Typical example
Speed
in
Idle speed
rpm
critical speed
zone
Idle speed
Time in minutes
Start up- Turbine
• Start AOP/MOP
• Fill the OH tank
• Keep Standby pump on auto
• Keep starting device in minimum position
• Keep barring gear on
• Start condensate pump & put hotwell
controller on auto.
• Open the casing drains & line drains.
Start up- Turbine contd..
• Gradually heat up to ESV thro’ warm up
vent
• Heating rate @2-3 Deg C/ min.
• Heat the inlet line @ 70-75% of rated temp
• Start the evacuation system & seal glands
• Energise the solenoid valve
• Energise the tripping device.
• Ensure gradual opening of ESV
Start up- Turbine contd..
• Give start command to governor( auto/semi
auto)
• The speed will rise as per the programme
crossing the critical zones.
• At each speed intervals note
- Bearing Vibrations
-Bearing temperatures
-Abnormal noises if any
Start up- Turbine contd..
• Allow the speed go upto min GOV speed
• Ensure the holding down bolts are free.
• Observe the casing expansion
• Increase the speed further up to max
continuous speed in steps.
• Observe stability of the Gov
system,mechanical stability of the machine.
Bring the machine to full speed.
TBL
CP
COMP
_
_ JB(NDE) TB
JB(DE) 1
2 +
+ SUCTION
A B C
JB: IOURNAL BEARING E : PRIMARY SEAL VENT LINE
ALARM SET POINT 12 NM3/HR
TB: THRUST BEARING. TRIP SET POINT 15 NM3/HR
C: PRIMARY SEAL INLET LINE
D: SECONDARYSEAL VENT LINE
PRIMARY SEAL DP 1 = 0.4 TO 0.6 KG/CM2 PROCESS GAS SHOULD BE NIL