Start up and shut down for STG

Bharat Heavy Electricals Limited


Hyderabad
Wensday 17/03/2004
Systems
• Lube oil system
• Governing oil system
• Condensate and evacuation system
• Cooling water system
• control system
Lube Oil System
• Oil Specification

• System Preparation

• Parameters to be maintained
A Simplified sketch of Lube Oil System
Lube Oil General Daigram
LUBE OIL INLET
HEADER

FROM OHT FROM OHT

DISCHARGE

TURBINE COMP

SUCTION
C

TURBINE COMPRESSOR
DRAIN HEADER DRAIN HEADER

LUBE HEADER PRESSURE: 2.5 TO 3.0 KG/CM2 MONITOR DRAIN OIL TEMP.

JOURNAL BEARING PRESSURE : 1.5 TO 1.75 KG/CM2 ENSURE OIL FLOW THROUGH OHT.

THRUST BEARING PRESSURE = 0. .5 10 0.8 KG/CM2 MONITOR DP ACROSS FILTER.

MAINTAIN LUBE OIL TEMP. AFTER COOLER 40 DEG


CENTIGRADE

MONITOR LUBE OIL TANK LEVEL


Simplex Filter
DUPLEX FILTER
Accumulators
Parameters
• Pump Discharge pr. 9.0 atg
• Gov.oil pressure 8.0 atg
• Lube.oil header pressure 2.5 atg
• L.O to J.B 1.2-1-5 atg
• L.O to T.B 0.3-0.8 atg
• Diff.pr across filters 1.2 atg (Change filter)
• C.W Pressure 1.5 atg-2.5 atg
Parameters contd..
• Oil temp after cooler 40 deg C
• Expected drain oil temp 60-65 deg C
• Centrifuge operation One Shift/day
(clarifier & purifier alternately)
• Oil sample analysis periodically
Governing system
• System preparation

• Parameters to follow
Parameters
• Governing oil pressure: 8 atg
• Trip oil pressure : 7 atg
• Sec Oil Pr. : 1.5atg-4.5 atg
• WWG signal : 4MA-20MA
• Valve Lift : 0 mm-full
scale
• Governing oil temp : 50-60 deg c
• Max & Min Extr signal thro’ WWG &
compare with diagram
OS GOVERNOR

MAIN SOLENOID
VALVE OST TESTER TRIPPING
PUMP DUPLEX FILTER DEVICE

STARTING
ESV DEVICE

I / H CONVERTOR

SERVOMOTOR

GOV.
VALVE

WOOD WARD
GOVERNOR
Condensate and evacuation
system
• System preparation

• Parameters to follow
STEAM INLET

TURBINE

GLAND STEAM
INLET

CONDENSER

A B
DEAIRATOR
AIR VENT

HP STAGE LP STAGE

CW CW
HP DRAIN INLET OUTLET

CODENSER

LP DRAIN
Parameters
• Hotwell level -Normal 60%
• CW to condenser- 1.5-2.5 atg
• Condensate pump Disch Pr. 8-10 atg
CW system
Preparation
• CW to Lube oil coolers ready
• CW to condenser ready
• CW to Coppus turbines ready
• C W to ejector condenser
• CW to ejector condenser
Start up diagram
• Typical example
Speed
in
Idle speed
rpm
critical speed
zone

Idle speed

Time in minutes
Start up- Turbine

• Start AOP/MOP
• Fill the OH tank
• Keep Standby pump on auto
• Keep starting device in minimum position
• Keep barring gear on
• Start condensate pump & put hotwell
controller on auto.
• Open the casing drains & line drains.
Start up- Turbine contd..
• Gradually heat up to ESV thro’ warm up
vent
• Heating rate @2-3 Deg C/ min.
• Heat the inlet line @ 70-75% of rated temp
• Start the evacuation system & seal glands
• Energise the solenoid valve
• Energise the tripping device.
• Ensure gradual opening of ESV
Start up- Turbine contd..
• Give start command to governor( auto/semi
auto)
• The speed will rise as per the programme
crossing the critical zones.
• At each speed intervals note
- Bearing Vibrations
-Bearing temperatures
-Abnormal noises if any
Start up- Turbine contd..
• Allow the speed go upto min GOV speed
• Ensure the holding down bolts are free.
• Observe the casing expansion
• Increase the speed further up to max
continuous speed in steps.
• Observe stability of the Gov
system,mechanical stability of the machine.
Bring the machine to full speed.

Check stability of Gov system and give


clearance for synchronisation.
Monitor all bearing temp, drain oil temp, brg
metal temperature, brg vibartion, hot well
level, vacuum, lube oil temp for each stage of
loading.

Compare if available with earlier data.


ALARM AND TRIP SET
POINTS
• Exhaust Pr. Low - 0.6/-0.3 atg
• Lube oil Pr.low 1.5/1.0 atg
• Control oil Pr.Low 6.5/4.5 atg
• Trip oil Pr.Low-low 2.0atg
• BRG.Temp High 100/110 deg c
• Vibration High 75/ 100 mic
• Axial Displ High 0.5/0.7 mm
Shut Down procedure
Bring generator o/p Minimum and open breaker.

Take normal shut down in WWG

Put Machine on barring

open all turbine casing drains

Isolate ejector steam, main steam and gland steam

Open all drain main steam line ejector line and


gland steam line.

Maintain the hot well level


Maintain Lube oil temp to 40 deg Centigrade.

Run CEP for 2 hrs If Condensate is used as


Cooling water for ejector. If not stop immediately. But
condenser level should go up.

Ensure main steam line @ 80 deg centigrade and stop


barring.
DGS General Diagram
D E
DISCHARGE

TBL

CP
COMP

_
_ JB(NDE) TB
JB(DE) 1
2 +
+ SUCTION

A B C
JB: IOURNAL BEARING E : PRIMARY SEAL VENT LINE
ALARM SET POINT 12 NM3/HR
TB: THRUST BEARING. TRIP SET POINT 15 NM3/HR
C: PRIMARY SEAL INLET LINE
D: SECONDARYSEAL VENT LINE
PRIMARY SEAL DP 1 = 0.4 TO 0.6 KG/CM2 PROCESS GAS SHOULD BE NIL

(DP BET WEEN C &TBL) DP 2 BETWEEN B & E =500 TO 800 MMWC


B: SEC SEAL INLET LINE
SEC SEAL INLET FLOW =2.0 TO 2.5 NM3/HR

A: BARRIER SEAL INLET LINE


BARRIER SEAL PR=0.4 TO 0.6 KG/CM2