glazing already installed; the manufacturer (The Marble bricks or blockwork are the reduction in on-site waste

Mosaic Company) arranged with a glazing subcontractor and debris and a quicker finished appearance to the
to preframe and glaze the panels at the precast yard.The building.
panels were installed shortly after completion of the The panel fixings presented a serious challenge. As
cast in-situ frame. The use of scaffolding was largely most of the development is residential there are no
avoided; the panels were craned into position and deep raised floors or suspended ceilings to provide
quickly made watertight with a temporary sealant space to hide the fixings. The precaster developed a
applied to the insides of the joints. To apply external special fixing method that could work in the restricted
sealants, trained workers used abseiling techniques to depth available. Each panel is supported on a pair of
reach the external joints of the panels. By enclosing each stainless steel bearing angles and laterally restrained by
floor with the precast panels speedily, a clean dry being bolted to stainless steel plates which are fixed to
environment was provided for the following trades. channels cast in the slab edge.
Insulation was fitted to the panels as part of a dry
lining package which was applied to the walls, ceilings CREDITS
and floors. The panels are thin and are suspended PRECASTER The Marble Mosaic Company
beyond the floor slab footprint, providing more living
space while achieving a high standard of heat and noise
insulation.
Further advantages of using precast panels instead of