A 5~bskll~ ry 01 Kuwait P'1rlJ'Qle\Jm CorpOl'Bllon
STANDARDS PUBLICATION
KOCSTANDARDFOR
VESSELS PART 1
(Rev. 3)
STANDARDS TEAM
DOC. NO. KOC-P-002 Pt. 1 I Page 1 of 28 Rev. 3
STANDARDS PUBLICATION
KOCSTANDARDFOR
INTERNAL LINING OF TANKS AND
VESSELS PART 1:
GUNITE LINING OF STEEL VESSELS
DOC. NO. KOC-P-002 PT. 1
STANDARDS TEAM
ISSUING AUTHORITY:
STANDARDS TEAM
3 12/03/2015
Issued as KOC
Standard
Task Force
(TF-PC/02 ) Mr. Saeid AI-Duwaisan
-
Issued as KOC
2 18/07/1999 Standard Dr. M. lIyas Dr. M. lIyas Mr. Ali H. Baba
Page No.
FOREWORD 5
1.0 SCOPE 7
2.0 APPLICATION 7
3.0 TERMINOLOGY 7
3.1 Definitions 7
3.2 Abbreviations 8
4.1 Conflicts 8
List of Standards, Codes and ...... rnl"cn 8
.
F==~=.-~~-=======.~=-=-==
~~.==~==================~======================9
Shooting Strips 19
9.9 Curing 19
10.1 General 20
12.0 DOCUMENTATION 23
12.1 General
1 Work Proposal 24
ACKNOWLEDGEMENT 27-28
FOREWORD I3I
This document "KOC Standard for Internal Lining of Tanks and Part 1: Gunite
Lining of Steel Vessels" (KOC-P-002, Pt. 1 Rev.3) the minimum requirements
for material selection, installation, maintenance, inspection and testing of Gunite Lining of
vessels. The earlier document (KOC-P-002, 1 Rev. 2) issued in July 1999, has
been for conformance with revisions of relevant International I National
Standards and incorporation of latest technical requirements in this field.
This Standard is part of the KOC-P-002 Series on "Internal of Tanks and Vessels".
The other parts of this series are:
d) To set out minimum requirements and guidance for monitoring compliance of materials
testing within a Project.
The revision of this Standard has been entrusted by the Standards Technical Committee
(STC) to the Task Force (TF-PC/02) comprising of the following Members:
Mr. Amer Jaragh Insp. & Corr. (N&WK) Team TF Leader Tel. No . 65428
Mr. Mohd. Emam Insp . & Corr. (S&EK) Team Member Tel. No . 65254
Mr. Hasan Sabri Insp. & Corr. (S&EK) Team Member Tel. No. 65434
1
Foreword Revised & Updated.
2
4.2 Revised & Updated.
3
6.0 Revised & Updated.
modified.
4 7.2
New Clause 7.2 Added and subsequent clauses are re
numbered. Table 1 Added.
7.3.1 Sub-Clauses are re-numbered to 7.4.1 & 7.5 (b) and
5
& 7.4 (b) modified .
Sub-Clause 7.5.2 re-numbered to 7.6.2 & modified and
7.5.2, Table 1 is referred .
6
7.6 Clause 7.6 re-numbered to 7.7 & Sub-Clause 7.7.2
& 7.9 modified.
8
8.0 New Clause 8.5 added & subsequent clauses are re
numbered .
9.3.4, 9.4.1,
9 Sub-Clauses are modified.
& 9.5.7
10 9.7 , 9.9 & 9.10 Clauses modified.
1.0 SCOPE
1.2 This Standard covers both new and maintenance works of Gunite Lining of
Vessels.
2.0
1 The materials and equipment used for surface preparation, lining application
Any exceptions or deviations from this Standard, along with their merits and
justification, shall be brought to the attention of KOC's Controlling Team, for their
review, consideration and amendment by Standards (if required).
2.3 Compliance with this KOC Standard does not itself confer immunity from legal
or statutory obligations.
3.0 TERMINOLOGY
3.1
For the purposes of this Standard, the following definitions shall apply:
3,1.1 Coat
1.2 Curing
3,1.3 Gunite
A term used to describe mixture of sand, cement, and water placed into
position under pneumatic pressure by means of a called "Cement Gun."
3.1.4 Lining
3.1 Pozzolan
MC Moisture Content
4.0
4.1
4.2 131
KOC Standards
KOC.PS.001
Safety Management Manual
6.0 131
6.3 Appropriate Permit to Work (PTW) with applicable Job Safety Analysis (JSA)
document for the work to be carried out and shall prepared in accordance to
KOC.SA004 "Permit to Work prior to commencement of work. The
PTW and JSA documents shall address all relevant HSE requirements specified
by the Coating Manufacturer and applicable KOC HSEMS Procedures. KOC
Policy and all applicable KOC HSEMS procedures shall be adhered to
within KOC areas at all times.
JSA of the work including confined entry shall be in accordance with with
KOC.SA007 into Confined and control measures mentioned in
the JSA documents shall implemented at work site and the pertinent hazards
identified in shall be communicated to all workers before commencing the
work.
6.4 KOC Health, Safety and Environment (HSE) policy, relevant HSE Management
System procedures and other contract HSE requirements, as applicable, shall be
adhered to while carrying out KOC works.
6.7 Contractor I Applicator personnel, shall take necessary approvals from the
relevant safety authority of KOC, where is a risk of flammable atmosphere
being present in a particular work prior to performing preparation
Flame heating equipment shall not used in hazardous areas. Refer to KOC
G-002 "KOC Standard for Hazardous Area Classification", which describes the
area classification for various Facilities. A prior approval from KOC shall
obtained before the use of any flame heating equipment at the job site.
Adequate lighting shall provided using KOC approved high flood lights
or spot lights of voltage to provide good visibility during surface
preparation, lining application, and inspection I testing. The temporary power
supply circuit shall have earth leakage circuit Temporary lighting shall
comply with the requirement specified in KOC.SA007 "Entry into Confined
KOC-P-002 Pt. 1 Page 12 Rev. 3
All chemicals being for surface preparation & lining applications shall have
a Material Safety Data (MSDS) I Safety Data (SDS) in
workplace and and the Contractor or Applicator shall aware of the
MSDSI
All waste (Hazardous I non-hazardous) generated from the subject activities shall
be managed as KOC HSEMS procedure KOC. "Waste Management
13 I
Properties
Clause 7.5.1
Clause 7.9
,-"<AU"",,, 7.10.
sealant
7.3 131
7.3.2 Manufacturer's certificate along with third party laboratory test reports shall be
furnished covering all materials (cement, sand, pozzolan) and shall confirm
that the comply with requirements of Table 1 of this Standard.
7.4
7.4.2 A single brand of cement shall be used throughout any particular work.
Change of brand shall be to KOC's approval.
7.5 Sand
7.5.1 sand shall as per ASTM I C33M and meet the following requirements:
7.6
Water
7.8 131
All reinforcing used in Gunite work shall comply with ASTM A615 I A615M.
8.1 fabrication and surface finish requirements for internal lining work shall
NACE RP 0178.
oil, dirt, temporary protective and chalk shall removed from the
to be . Degreasing shall be out using vapour
equipment or as recommended in SSPC-SP1.
8.4 Mill scale, paint and rust shall be removed by abrasive cleaning in
accordance with NACE 2 I 0 I ISO 8501-1 Sa Abrasive
cleaning follow requirements of KOC-P-001. The profile
shall be between to 1 microns when as per RP 0287.
8.6 cleaning combined with vacuum collection the nozzle can be used to
atmospheric contamination within vessel.
IILJ..... C. NO. KOC-P-002 Pt. Page 16 28 Rev. 3
8.7 All surfaces be lined with Gunite shall cleaned to remove any dust, dirt
residues and debris etc. by using industrial vacuum cleaner prior to Gunite
application.
9.0
9.1
9.1.2 Gunite lining shall follow the shown on the drawings submitted by the
contractor and approved by KOC and shall fulfil all requirements of this
Standard.
9.2
9.3
a) High winds occur which separate the r<.>.rn£;1,'1T from the at the
c) other than a light sprinkle, out the cement from the newly
placed Gunite. In the event of rain, the newly Gunite shall
properly covered until the has hard.
9.5.2 Gunite lining be applied in a uniform manner and the specified thickness
as Clause 9.12, without any sags or any other defects.
When shooting around reinforcing rods or anchor bolts, nozzle shall be moved
to side of the rod and angled to apply Gunite to the back of the rod
9.6
9.7 131
9.8
Curing 131
9.10 131
9.11
9.11.1 The Gunite shall be on to a line near the final which all high
spots shall removed by a sharp-edged screeding device.
9.12
9.13
Where Gunite lining repair is done, the adjacent lining shall overlap
to cover any cracks and shall maintained in a moist conditions for
four using burlap or fabric pads or similar means.
10.0
10.1 General
10.1.2 Surface preparation and lining application shall be subjected to inspection I testing
any by to ensure the compliance with Clauses 8.0 and 9.0 this
Standard.
10.1.3 KOC inspector have right inspect all times any tools, materials or
equipment used in the performance of surface preparation and Gunite application
to ensure the compliance with the requirements of Standard.
DOC. NO. KOC-P-002 Pt. 1
TABLE 2
Test Method I
51. No. Description Frequency
Standard
1
Material Table 1 Batch to Table 1
Certificate
of area Comply to
5 ISO 8502-4
Conditions
Surface
ISO 8501-1 100% of lining area Sa2.5
Prior to coating / as
8 Dust Level 8502-3 < 2
requested by KOC
Level 75 to 125
Lining KOC
11 1 Lining
Visual Inspection Part 1
Gunite Lining
12 40 ±4 mm
1 Lined
iv. laminations.
10.4
10.4.1 the compressive strength of the applied Gunite, three (3) test cylinders
shall be made during the course of the shooting so that representative of
Gunite are obtained.
10.4.2 The cylinders shall be made by shooting the Gunite into a mould of hardware cloth
(W' metal mesh) to make cylinders 150 mm in and 300 mm long.
excess material outside the mould is trimmed off with a sharp edged trowel. The
open mesh mould is to permit the escape of air and rebound sand during
placing and to provide a cylindrical for trimming.
10.4.3 After hours of making the cylinders, hardware cloth shall removed and
cylinders stored under moist curing conditions at about 21°C (70°F) until
testing.
10.4.4 Gunite Mix ratio analysis: When requested by KOC, Contractor shall carry out
the quality control to determine the cement, sand and pozzolan ratios in the
Gunite as instructed by the KOC. I3I
11.0
12.0
12.1 General
12.1.1 All correspondence, instructions, drawings, data sheets, design calculations or any
other written information shall be in the English language. In the case of dual
languages, one language shall be English.
1 1.3 All documents (texts, specifications, data calculations, drawings etc.) shall
be provided in Hard Copies with its electronic in the approved software
(MS Word, Auto Cad All calculations shall be submitted in
approved and widely used software duly approved by KOC.
Page Rev. 3
1 Work Proposal
12.2.1 The Contractor shall submit his proposal for all of work, for the
KOC prior to commencement, which shall include, but limited to the following:
12.3
12.4
Contractor's Name no . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Drawing No..................................... .
Ir-------~-·~----------~ - -..- - - - . - . - - -
A. Surface Preparation
(Visual Standard)
Surface Conditions:
1.
2.
3.
B. Weather Conditions
Relative Humidity
Ii
DOC. NO. KOC-P-002 Rev. 3
D. Lining Materials
Grading I
Packing ................................... .
Fineness modulus........................ .
H!ldrating Water
ASTM-Type .............................. .
Source ................................
Size ................................... .
Application
Pozzolan ........... %
Sand ................ %
Inspection / Testing
Size (length I
Compressive Strength:
At age of 7
ACKNOWLEDGEMENT
This KOC Standard (Rev. 3) has been approved by the Standards Technical Committee
(STC) consisting of the following Members:
The Draft of this Standard (Rev. 3) had been circulated to the KOC User Teams for review
and responses were received from the following Teams:
Team Leader HSE (NK) Team Leader HSE (Exp . Opns. & Mar. Opns .)
Team Leader Health & Environment Team Leader Drlg . & W/Over Tech .Svcs.-11
Team Leader Safety
F=====~================~====================Y==.~... ==~~~===-== . . ..
~=-=
-=~==~
Page 28 of 28 Rev. 3
..
~========~==========~=-=~=-=====-=-===-==c====~====================~
The revision of this Standard (Rev. 3) been entrusted by the Standards Technical
Committee to the Task Force No. (TF-CP/02) comprising of the following Members:
Mr. Amer Jaragh Insp. & Corr. (N&WK) Team TF Tel. No. 65428
Mr. Mohd. Emam Insp. & Corr. (S&EK) Team Member Tel. No.
Mr. Hasan Sabri Insp. & Corr. (S&EK) Member No. 65434
Mr. Umair A Usmani Standards Team Member Tel. No. 61869