PE-3155-EL-QAP-01

CLIENT : M/S GUJARAT FLOUROCHEMICALS LIMITED


PROJECT : MICRO POWDER PLANT
DOCUMENT NO. : APPENDIX D TO PE-3155-ELQAP-01
DOCUMENT TITLE : INSPECTION REPORT FOR INSTALLATION OF LIGHTING AND RAW POWER FIXTURES
REV. NO. : R0

INSPECTION CHECKLIST FOR INSTALLATION OF LIGHTING AND RAW POWER FIXTURES

Sr. Activities Controlling Document Acceptance Criteria Contractor GFL Engineer

The fixture being installed has no physical damage, burn marks,


1 Physical Verification Mandatory Check Verify
cracks, etc. and has been functionally checked before installation.
Proper supports installed to ensure that the Vibration free fixture
2 Physical Verification Check Verify
installation.
FixtureType, number, location & height is as per Layout and
3 Lighting Layout Physical Verification Mandatory Check Verify
installation drawing

4 Light circuit, Power distribution is as per SLD Single Line Diagram Physical Verification Check Verify

Lighting Layout / Single


5 Emergency fixture type & location as per specification & drawing Visual Check Verify
Line Diagram

6 Lighting / Raw Power fixture installed as per classification area. Datasheet Document Verification Check Verify

7 Check light illumination levels & record readings at various locations. Design Basis Visual / Lux Meter Mandatory Check Verify

Circuit distribution diagrams should be clearly labeled in distribution


8 Single Line Diagram Visual Check Verify
boards.

Circuit breaker and safety features conform to specifications and


9 Single Line Diagram Visual Check Verify
drawing.
All welding receptacles and raw power utility sockets are effectively
10 Visual Check Verify
earthed.
Cable termination and gland are firmly installed with no loose point
11 Physical Verification Check Verify
of connection
PE-3155-EL-QAP-01

CLIENT : M/S GUJARAT FLOUROCHEMICALS LIMITED REV. NO. : R0


PROJECT : MICRO POWDER PLANT CREATED BY : AJ
APPENDIX D TO PE-31: APPENDIX B TO PE-3155-ELQAP-01 APPROVED BY : DB
INSPECTION REPORT : INSPECTION REPORT FOR INSTALLATION OF LIGHTING AND RAW POWER FIXTURES

PLANT
UNIT
REFERENCE DRAWINGS A) IFC LIGHTING LAYOUT B) FIXTURE DATASHEETS

SR. NO. FIXTURE TAG / DESCRIPTION SIZE INSTALLATION AREA / GRID REFERENCE REMARKS

NOTES:
REFER CHECKLIST FOR INSPECTION OF LIGHTING AND RAW POWER FIXTURES INSPECTION ENGINEER
REFER LATEST REVISION OF IFC DRAWINGS
DATE AND SIGNATURE