MATERIAL TRACEABILITY REPORT

Pekerjaan Jasa Pembangunan Tangki Timbun


LPG, Piping dan Instrument Di Depot Dumai
Kapasitas 2 x 3000 MT.

Date : 18/09/2021
Report no : MTR/X/BBB/071
Isometric dwg no.: 500-16-FW-A1A-210
Sheet : 03

MATERIAL TRACEABILITY REPORT


Length
No. Spool no Mark Material Specification Diameter Heat no. Mill Certificate No.
(mm)
FLANGE WN, 150#, RF,
1 1 16"
BTMP, A105
PIPE, ERW, SCH STD,
1 16" 969
API 5L GR.B
FLANGE WN, 150#, RF,
16"
BTMP, A105
FLANGE WN, 150#, RF,
2 2 16"
BTMP, A105
PIPE, ERW, SCH STD,
2 16" 2918
API 5L GR.B

Prepared / Inspected by: Witnessed / Reviewed by:


PT. BANGUN BEJANA BAJA PT. PERTAMINA (PERSERO)

Date: Date: