Scope of work:
visual inspection, dimensional inspection,
Inspection result:
Satisfactory partial non-conforming rejected aborted
Documentation:
Complete and in order not complete (please see report details)
Deviations found:
None to contract to drawings to ITP / QCP / PO
(Please see separate nonconformance report)
Remarks:
The inspector has carried out visual inspection, dimensional check and documents review during
inspection.
1. The markings & the appearance of the coating of the checked samples were in comply with the
specification of DIN 30670: Polyethylene Coating, without obviously defect was found out during
inspection.
2. All pipes have been completed and ready for shipment, coated & printed marks during inspection.
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 2 of 19
INSPECTION DETAILS
Specification
Item Actual
Description Length/
No. Q’ty O.D/mm W.T/mm
m
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
1 5 508.0 6.35 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
2 6 457.2 6.35 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
3 9 406.4 6.35 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
4 4 114.3 3.05 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
5 28 406.4 9.53 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
6 7 114.3 6.02 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
7 3 114.3 6.02 11.8
coated
Carbon Steel ERW pipe API5L X65 PSL1 + 3LPE
8 1 88.9 3.05 6
coated
Total 63
Acc. to VERITELL INC Work Order scope of inspection 127xxxxxx-xxx, object of the inspection was:
1. Visual inspection
The markings & coating of all checked sample pipes were in comply with specification,
without any obviously defect was found during inspection.
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 3 of 19
cm on minor pipes
3. Documents Review
the manufacturer have provided the following documents & certificates for review during inspection.
(Please list all standards used during inspection and all documentation received, which must be
numbered and attached accordingly)
Witnessed Tests:
(Please list all tests witnessed as requested; also indicate whether at hold or witness point)
INSPECTION ACIVITIES
2. Dimension Inspection
Result: satisfactory
4.
Result: ………………………..
5.
Result: ………………………..
Documentation Control:
Non Conformities:
Please list all found non conformities and refer to the separate non conformity report including the
report number.
1. there were 2 pipes which ends with tiny damaged during inspection. And the manufacturer
promised that they will repair it before shipment.
Disclaimer:
This report reflects our findings during inspection in time and place according to the agreed scope of our performance
or deliverables and does not release buyer and/or seller from their contractual responsibilities. This report does not
construe any guarantee or warranty that the purchase contract between buyer and seller is fulfilled correctly and all
performances have been delivered without any defect. Furthermore the report and its results does not affect any
potential buyer’s right to claim for compensation or remedy towards the seller/supplier of apparent or hidden defects
not detected during our inspection or occurred afterwards.
PICTURES:
Picture Description:
Appearance of pipes
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 11 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 12 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 13 of 19
Reviewed documents
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 14 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 15 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 16 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 17 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 18 of 19
BEIJING VERITELL
INSPECTION & VENDOR INSPECTION
TECHNOLOGY INC. REPORT
Report No.: VT-LTL-20141105-PSI-01A Date : 05/11/2014
Inspector: Mr. Tom Tu Page : 19 of 19