02 1 2 3 4 5 6 7 8

X
1 2 4 5 6 7 8 02

X
23,400 23,400
3,400 3,700 1,550 2,500 1,550 3,700 3,400 3,400 3,700 1,550 2,500 1,550 3,700 3,400 NOTES
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
1,200 4,200 2,700 5,200 2,700 4,200 1,200 8,500 5,200 8,500
Beam below Beam below

200 200

Beam below 200 200


800 8,300 5,200 8,300 800

200 200

200 200
A A

200

200

200
A A

700

700
1200mm high wall with

450
1200mm high wall with 1.All dimensions are in millimetres unless otherwise

650
RWDP SURFACE WATER DRAINAGE 75mm thick coping SURFACE WATER DRAINAGE 75mm thick copingRWDP

200
specified.

Beam below
1,800 x 1,500
+15,300

2,400

2,400

2,400
KITCHEN VOID KITCHEN INAGE

1,800 x 1,500

1,500 x 1,500

PV
+15,300

1,800

1,800
LOUNGE

1,500 x 1,500

1,500

1,500
+3,300
LOUNGE BALCONY 200 VOID 200 1200mm high wall with R DRA

4,000
f.f Non-Ceramic tiles f.f Non-Ceramic tiles TE

3,600

3,600
PV

PV

3,750
3,750

3,750
3,750
A
ACE W

PV
3,600 SUR
3,750

3,750
FT FT f.f Ceramic tiles

E
3,600
5,200 SURF

200 250 200


FAC 75mm thick coping

NAG
SUR
f.f Ceramic tiles svp duct svp duct F f.f Ceramic tiles E WA 2.All dimensions should be checked on site and any

RAI
FAC
F
350 +3,300 900 x 2,400 900 x 2,400 TER

200

200

200
BALCONY

700

900 550
+3,300 DRA discrepancies should be reported to the architect.

RD
900 x 2,400

EW
200
INAG 1200mm high wall with

900 x 2,400

900 x 2,400
900 x 2,400

ATE
PV E

ATE
f.f Ceramic tiles +3,300
900
PV
20075mm thick coping 200

EW
LOBBY LOBBY 200 200 200 200 200

RD
900

1,900

1,900

FAC
PV PV
200 200

200 200
B B 3.All works to be carried out in accordance with the

RAI
f.f Ceramic tiles f.f Ceramic tiles

200

200
200 200 1,200 8,500 2,400 3,600
1200mm high wall with 4,700 1,200
B B

SUR
NAG
300
3,000mm high staircase local authorities regulations.
1,100

900 x 2,400
900 x 2,400

100

100

900 x 2,400
LOBBY

900 x 2,400

900
75mm thick coping

E
PV LOBBY PV

3,300
+3,300 wall

900

200

200
900
200
PV f.f Ceramic tiles PV

2,400

2,400
f.f Ceramic tiles
R.C Slab covering staircase
2,400

2,400
4.Use figured dimensions only do not scale from the

1,800 x 1,500
+3,300
SPLASH

2,200

3,200

3,200
550

550
at level 18,300
1,800 x 1,500
BEDROOM f.f Non-
ROOF TERRACE 5,000 L water ROOF TERRACE drawing.
2,800

PV
1,800

1,800
1,800

800 x 2,400 800 x 2,400

1200mm high wall with


BEDROOM

1,200 x 900

03
Ceramic

2,500
PV

f.f Ceramic tiles

75mm thick coping


WASHROOM

01
C f.f Terrazo screed laid to fall tanks f.f Terrazo screed laid to fall C

PV
DOWN
UP
tiles

1,200

1,200 x 900
1,200
200 FT f.f Ceramic tiles
C +3,300
C
1

FT f.f Non-Ceramic tiles VOID


20
200

PV
5.Walls below 200mm thick to be reinforced with hoop

800

800
2
200

FT FT

03
1,200 2,400 1,200
800

800
FT 19
FT
VOID

14,600

14,600
6,200

6,200
svp duct 200
W W
D D
01

+15,300
3

iron at every alternative course.


14,600

14,600
5,800
18

D VOID D 200 200 200 200 200 200


1,300

1,300
200

5,800

1,700
700
900

700
4

5,300
17

19G x 300
20R x 150
FT 1,400 8,500 2,450 3,750 4,700 1,400
5
FT 16
FT
W W
+15,300

1,200 x 900
FT
LOBBY
200

LOBBY WASHROOM
6
15
WASHROOM
6.DPC to be laid under walls and to be minimum 150

1,600
PV
FT FT

1200mm high wall with


1,200

1,200 x 900
3,000mm high staircase

1,200
7
1,800

1,800 x 1,500
4,100
VOID 200 200 f.f Non-Cer.
14

75mm thick coping


1,050 f.f Ceramic tiles f.f Ceramic tiles f.f Non-Ceramic tiles
mm above finished ground level.

PV
8

3,200
3,200

3,200
3,200
BEDROOM wall
2,800

13
3,300 2,350
BEDROOM
1,800 x 1,500
3,200

3,200
PV
1,800

1,800
SPLASH
1,800

800 x 2,400 12
800 x 2,400
f.f Ceramic tiles f.f Non-Cer.
PV

550

550
10

f.f Ceramic tiles

AGE
2,250
11
250

+3,300 +3,300

900 x 2,400
900 x 2,400

900 x 2,400

900 x 2,400

RAIN
PV LOBBY PV 7.All drainage pipes passing under building and
900
5,000 L water

900
200

+3,300 +3,300
900
200 200

200 200

ER D
f.f Ceramic tiles driveway to be encased in 150mm thick concrete

2,500
PV PV
200 200
900

900
E E

SUR
200

200

200
WAT
100

100
E E tanks
50

200
sorround.
200

200

250

FAC
SU

900 x 2,400
900 x 2,400
900 x 2,400

900 x 2,400
200 3,500 850 2,750
GE RF

FACE

EW
1,100
INA
PV PV LOBBY AC
BALCONY LOBBY +3,300 R.C Slab covering staircase
1,000

1,000
550 900

550 900
LOBBY A

900
200 200

1,100

Beam below

Beam below
E

ATE
DR

SUR
PV 1,200 f.f Ceramic tiles PV
ER WA
f.f Ceramic tiles at level 18,300 8.All inspection chambers in driveway to have

RD
WAT
f.f Ceramic tiles f.f Ceramic tiles TER

200

200
200

RAI
C DR

200
svp duct FA heavy duty covers.

700
200 200 200 200900 x 2,400 F svp duct
SUR AIN

NAG
900 x 2,400
BALCONY

3,750
3,750

3,750
3,750
3,600

3,600
+3,300
600
F
E3,750

3,750
3,600

3,600
1,200 3,600 600 900 1,200 600 AG
VOID
3,600

svp duct

E
+15,300 +15,300 E
1,500 x 1,500

1,800 x 1,500
LOUNGE
FT FT
LOUNGE f.f Ceramic tiles

2,300

2,300
KITCHEN KITCHEN
1,800 x 1,500

1,500 x 1,500
1,700
PV

PV
1,800

1,800
+3,300 +3,300 9.All reinforced concrete works to be in accordance with
2,400

1,500
1,200

f.f Ceramic
+3,300 tiles f.f Non-Ceramic tiles f.f Ceramic tiles 1200mm high wall with 1200mm high wall with VOID 1200mm high wall with
PV

PV
f.f Non-Ceramic tiles RWDP 75mm thick coping 75mm thick coping SURFACE WATER
DRAINAGE RWDP structural engineers details.
SURFACE WATER DRAINAGE 75mm thick coping

200 200

200 200
200
600

F F
200 200

200 200
1,200

200

200
650
200 200

F F
450
700

700
10.1000 gauge polythene (damp proof membrane) and
200 200 Beam below 200 Beam below 200 200
anti-termite treatment to be provided under ground floor
200 200 200 200 200 200 200 200 200 200 13,900 8,500
concrete slab.
1,200 4,200 2,700 5,200 2,700 4,200 1,200 3,400 3,700 1,550 2,500 1,550 3,700 3,400
TYPICAL FLOOR BUILT
3,400 3,700 1,550 2,500 1,550 3,700 3,400 23,400
UP AREA = 279 SQM
23,400
1 2 4 5 6 7 8 1 2 3 4 04 5 6 7 8

X
X

04

ROOF TERRACE FLOOR PLAN (1:100)


TYYPICAL FLOOR PLAN (1:100)
SCEPTIC TANK DETAILS

1 8 450 x 600mm 450 x 600mm

ACCESS ROAD
manhole cover manhole cover
10,000 MM SET BACK FROM BOUNDARY LINE

10,000 MM SET BACK FROM BOUNDARY LINE

150
31,387 11,503 Inlet Outlet Project
10,025 MM SET BACK FROM BOUNDARY LINE

450

E
TO COUNTY SEWER LINE
200

B C

150
150MM HIGH PLINTH +150
43,245 8,060 MM SET BACK FROM BOUNDARY LINE
150 600
French drain to PROPOSED APARTMENT
742

details
Washroom BLOCKS ON L.R NO.
800

f.f Ceramic tiles Kitchennete Guard office


1,200
2,842

Ngong/Ngong/25417
+150 f.f Ceramic tiles D
150MM HIGH PLINTH

+150 ENTRANCE GATE

200
1
600 1,000

f.f Ceramic tiles


FT
+150
SCEPTIC TANK PLAN
1,100

150MM HIGH PLINTH


200

Outlet inspection chamber


10,441

Inlet inspection chamber R8 distribution bars at 200mm c/c


PARKING
8,525

300 IC 6 100 200 ±0

+150
f.f Cabro paving
600 900 1,000 900 900 1,100 ±0
2 200 200 200 200
27 150mm blockwork to
X.

100mm diameter uPVC D12 main distribution 100mm diameter uPVC


DRIVE WAY

6,060
1,300 2,100 1,800 waste pipe to inlet bars at 300mm c/c waste pipe to inlet
details
DRIVE WAY Client
200 600 600 200
f.f Cabro paving

5,341
f.f Cabro paving TOP WATER LEVEL
A 100 B 100 C 200

6,000 4,600 12,700 7,500 4,600 6,000 100mm thick concrete


ACCESS ROAD

100mm thick concrete BRC mesh No. A64


26 ANTHONY NJAGI
150 mm dia pipe at high level

to reinforce the wall


3

F1
150 mm dia pipe at high level

PARKING

F2
02 12mm waterproof
IC 7
IC 5
200
f.f Cabro paving 12mm waterproof cement rendering
200
cement rendering
200mm thick walling to

9,800
details

9,800
9,787
(below beams)

25
(below beams)

±0
4 200mm thick concrete mix
14 15

150MM HIGH PLINTH


DRIVE WAY ±0 SECTION A - A
150MM HIGH PLINTH

f.f Cabro paving ±0


10,000 MM SET BACK FROM BOUNDARY LINE

10,000 MM SET BACK FROM BOUNDARY LINE


Architects
27,500

IC 4 Disludging
5 IC 2 24 CAPACITY Number of intervals Dimensions in millimetres
Gallons Litres persons (time) A B C D E F1 F2
300 1360 UP TO 10 2 years 400 300 1300 2200 700 1000 900
150MM HIGH PLINTH
13 ±0
600 2720 11 - 20 2 years 750 600 1350 2950 900 1150 1100
PARKING +150 +150
16 Sceptic Tank 900 4080 21 - 30 2 years 900 750 1350 3200 1100 1300 1200

22,900
f.f Cabro paving 1200 5440 31 - 40 2 years 900 900 1350 3300 1300 1420 1300
±0
150 mm dia pipe at high level

DOWN
UP

6 23 1500 6800 41 - 50 2 years 1000 950 1350 3500 1400 1530 1400
1

DRIVE WAY
20

150MM HIGH PLINTH


2 years
2

IC 1 19 1800 8160 51 - 60 1100 1000 1350 3700 1500 1630 1500


IC 3
03

f.f Cabro paving


3
+150

18
2100 9520 61 - 70 2 years 1200 1100 1350 3900 1700 1740 1700
01
13,900

4
17
19G x 300
20R x 150

5
16
2400 10880 71 - 80 2 years 1300 1200 1350 4100 1800 1840 1800
2700 12240 81 - 90 2 years 1400 1300
150 mm dia pipe at high level

1350 4300 1900 1940 1900


6
15
7
14
3000 13600 91 - 100 2 years 1500 1400 1350 4500 2100 2040 2100
(below beams)

P.O. BOX 4792-00506 NAIROBI


8

12 +150 3300 14960 101 -110 2 years 2000 2000 1500 5700 2750 2600 2750
13
±0

17,559
+150
17 22
9
12

TEL: +274 723 712952


7
10
11

90000 400 1.5 years 8800 4400 13400 4600 1500 2830
PARKING
f.f Cabro paving
(below beams)

PARKING
f.f Cabro paving ±0

+150
DRIVE WAY
8 21

FOREST LI
f.f Cabro paving
Title
11

NE ROAD
200 18
200 APPROVAL DRAWINGS
9,800 9,800
20
+150

9
PARKING
150MM HIGH PLINTH

04 MEMUSI ROAD MEMUSI ROAD


150MM HIGH PLINTH

f.f Cabro paving MEMUSI ROAD


PARKING Scale Drawn
X.
3,310

3,310

f.f Cabro paving SITE


DRIVE WAY DRIVE WAY DRIVE WAY
3,159

10 f.f Cabro paving ±0 f.f Cabro paving f.f Cabro paving ±0 19 1:100 MUNENE A.

Drawing no Checked

FOR
200

200

200

EST
Y.SCH
ST. JOAN PR

LINE
NGONG CHAPEL

ROA
K.M.

D
3,510 MM SET BACK FROM BOUNDARY LINE 3,510 MM SET BACK FROM BOUNDARY LINE Project no. Date.
43,000 PLOT SIZE = 1024 SQM MAY 2023
1 8 GROUND FLOOR BUILT UP AREA = 279 SQM

GROUND FLOOR PLAN/SITE PLAN (1:100) SITE LOCATION ( Not to Scale)


A B C D E F
3,750 2,400 800 3,200 3,750
NOTES
250
A B C D E F 5,700
250
F E D C B A

1,800

1,800
3,750 2,400 800 3,200 3,750
3,750 3,200 800 2,400 3,750
250 250 75 MM THICK CONCRETE COPING
PV 1.All dimensions are in millimetres unless otherwise

4,535
5,700

1,800

1,800

1,200

1,200

1,200
specified.
250 250 +10,300
75 MM THICK CONCRETE

1,800

1,800
5,700 ROOF TERRACE

600
200 200 COPING PV PV PV PV
1,200

1,200
4,000 6,200 4,000 2.All dimensions should be checked on site and any

1,250
+10,300 75 MM THICK CONCRETE COPING
discrepancies should be reported to the architect.

3,000

3,000
200

1,200

1,200
ROOF TERRACE
600

PV PV PV PV PV PV 4,000 6,200 4,000 900MM HIGH GLASS RAILING ON 250 MM HIGH WALL
+10,300

900
ROOF TERRACE 3.All works to be carried out in accordance with the

600
PV PV PV PV PV PV +10,300 local authorities regulations.
3,000

3,000

250
3,000
2,150

900 x 2400 HARDWOOD DOOR TO SCHEDULE 4 STORY

600
900 MM HIGH GLASS RAILING PV PV PV PV 200 X 600 MM CONCRETE BEAM TO SE's DETAIL
4.Use figured dimensions only do not scale from the

3,000

3,000
900

2,150
ON 250 MM HIGH WALL
drawing.

1,250
+10,300
250

250

3,000

3,000
4 STORY 200 x 600 CONCRETE 900 MM HIGH GLASS RAILING ON 250 MM HIGH WALL
600

STEEL CASEMENT WINDOW TO SCHEDULE


PV PV PV PV PV PV BEAM TO SE's DETAIL +10,300 5.Walls below 200mm thick to be reinforced with hoop

250

900
4 STORY iron at every alternative course.

600
3,800 200 x 600 CONCRETE BEAM TO SE's DETAIL +9,300
PV PV PV PV PV PV
3,000

3,000

250
3,000
2,150

3 STORY PERFORATED WALL TO APPROVAL

600
PV PV PV PV 6.DPC to be laid under walls and to be minimum 150

3,000

3,000
2,150
mm above finished ground level.

1,250
+9,300
250

3,000

3,000
3 STORY 2OOMM THICK PROTRUDING WALL
600

PV PV PV PV PV PV +9,300 7.All drainage pipes passing under building and

250
200 200 200 200 250 400

900
3 STORY 2OOMM THICK PROTRUDING WALL
600 4,050 1,800 900 1,800 3,400 600
STEEL CASEMENT WINDOW PV PV PV PV PV PV +6,300 driveway to be encased in 150mm thick concrete
3,000

3,000

250
3,000
sorround.
2,150

TO SCHEDULE 2 STORY

600
STEEL CASEMENT WINDOW TO SCHEDULE PV PV PV PV

2,750
3,000

3,000
2OOMM THICK PROTRUDING 900 x 2400 HARDWOOD DOOR TO SCHEDULE
WALL 8.All inspection chambers in driveway to have

1,250
+6,300
250

heavy duty covers.

3,000

3,000
400 200 200 200 200 400
2 STORY
600

600 3,650 1,800 900 1,800 3,650 600


PV PV PV PV PV PV +6,300 2OOMM THICK PROTRUDING WALL

250

900
200MM WALL PLASTERED AND RENDERED WITH 3 COATS
2 STORY 9.All reinforced concrete works to be in accordance with

600
PV PV PV PV PV PV +3,300 OF PAINT TO APPROVAL
3,000

3,000
structural engineers details.

250
3,065
2,150

1 STORY

600
3,000

3,000
2,200 10.1000 gauge polythene (damp proof membrane) and

2,150
800

+3,300 anti-termite treatment to be provided under ground floor


250

3,300

3,300
1 STORY 200 x 600 CONCRETE BEAM
concrete slab.
600

2,550
TO SE's DETAIL +3,300

250

1,550
1 STORY

600
200 x 600 CONCRETE BEAM TO SE's DETAIL

150
3,300

3,300

+0

150
150MM HIGH CONCRETE PLINTH
2,700

GROUND LEVEL

3,300

3,300
+0
GROUND LEVEL
3,750 2,400 800 3,200 3,750
+0
GROUND LEVEL
A B C D E F 3,750 3,200 800 2,400 3,750 3,750 2,400 800 3,200 3,750

F E D C B A A B C D E F

ELEVATION 01 (1:100) ELEVATION 03 (1:100) SECTION X-X (1:100)


Project

PROPOSED APARTMENT
BLOCKS ON L.R NO.
Ngong/Ngong/25417

1 2 3 4 5 6 7 8 Client
1 2 3 4 5 6 7 8 3,400 3,700 1,550 2,500 1,550 3,700 3,400
3,400 3,700 1,550 2,500 1,550 3,700 3,400

ANTHONY NJAGI
1,800

75 MM THICK CONCRETE COPING


75 MM THICK CONCRETE COPING
+10,300
200 200
1,200

1,200

ROOF TERRACE
8,900 5,200 8,900
+10,300
ROOF TERRACE
600

600

3,000

3,000
800 21,800 800
1,250
3,000

3,000

900 MM HIGH GLASS RAILING ON 250 MM HIGH WALL


+10,300 Architects
900

900 MM HIGH GLASS RAILING ON 250 MM HIGH WALL 4 STORY


+10,300
250

4 STORY
3,000

3,000
1,850

PERFORATED WALL TO APPROVAL


3,000

3,000

+9,300
900

3 STORY
+9,300 200 x 600 CONCRETE BEAM TO SE's DETAIL
250

3 STORY
11,400

600

200 X 600 MM CONCRETE BEAM TO SE's DETAIL


3,000

3,000
P.O. BOX 4792-00506 NAIROBI
1,250
3,000

3,000

TEL: +274 723 712952


+6,300
900

2 STORY
+6,300
250

2 STORY
600

200 x 600 CONCRETE BEAM TO SE's DETAIL


3,000

3,000
Title
1,250
3,000

3,000

+3,300
APPROVAL DRAWINGS
900

1 STORY 200 x 600 CONCRETE BEAM TO SE's DETAIL


+3,300
250

1 STORY
600

600

200 x 600 CONCRETE BEAM TO SE's DETAIL


3,300

3,300
3,300

3,300
2,700

Scale Drawn
+0
GROUND LEVEL
+0 1:100 MUNENE A.
GROUND LEVEL 3,400 3,700 1,550 2,500 1,550 3,700 3,400
3,400 3,700 1,550 2,500 1,550 3,700 3,400 Drawing no Checked
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 K.M.

Project no. Date.


MAY 2023
ELEVATION 04 (1:100)
ELEVATION 02 (1:100)