Professional Documents
Culture Documents
SKV-ML-MR-01
Rev, No. 0
MASTER LIST OF DOCUMENT CUM DISTRIBUTION Eff. Date: 01.02.2023
PROCESS WI FORMAT DRAWING PCS CONTROL PLAN CHECK SHEET SOP MASTER LIST
PREPARED BY APPROVED BY
Doc. No. SKV-ML-MR-01
Rev, No. 0
MASTER LIST OF DOCUMENT CUM DISTRIBUTION Eff. Date: 01.02.2023
PROCESS WI FORMAT DRAWING PCS CONTROL PLAN CHECK SHEET SOP MASTER LIST
PREPARED BY APPROVED BY
Document Change Request
Reason
Approvals
Yes No
Rev. from : to
Intimated Back to
Note: Whenever no change in document updation, Rev No. and Effective date will not change ; only due date of updation will change.
Months
S.No. Process Remarks
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
0
Page
Conclusion
Auditor : Auditee:
MAJOR NON CONFORMITY:
* Any noncompliance that would result in * probable shipment of non conforming product,
MINOR NONCONFORMITY:
* Any noncompliance that would result in working atmosphere needs action
OPPORTUNITY FOR IMPROVEMENT :
Based upon the auditor's judgment and experience in that commodity, are not optimal.
SECTION A: Description of the Non Conformity : Clause No. : ISO 9001 / Customer specific
(To be filled by Auditor) requirement
A2. Failure :
Section C: Root Cause Analysis (Use 5 Why / Fishbone Diagram in seprate sheet, if required)
(To be filled by auditee)
Section E : Implementation of Corrective Action and Horizontal Deployment (To be filled by area incharge)
Section G : Update Risk and Opportunity determined during planning (if any) (To be filled by MR)
Section H : Changes to Quality Management System (if any) (to be filled by MR)
Members to be communicated :
Let it be known to all concern that Management review meeting to be held as per following schedule.
Please attend the same as per schedule mentioned below : -
Date:
Time:
Venue:
S No. Agenda for Management review Details of Input Data Review frequency Responsibility
Prepared by Approved by
Members Present :
Sl. Resource
Agenda for Management Review Document Evidence Discussion Details Actions to be Taken Responsibility Target date
No.. Requirement, if any
Review Inputs
REVIEW OF OUTPUTS
Analysis:
P Q C D S M E 5S H&S Others
Root Cause :
Scope and Plan for Horizontal Deployment :
Target
Machine Scope Date Resp Status
Idea :
Implemented By :
QPMC-FM-MR-10, Rev No.00, Rev. Date: 08.06.2022
Doc. No. QPMC-ML-MR-01
Rev, No. 0
MASTER LIST OF DOCUMENT CUM DISTRIBUTION Eff. Date: 08.06.2022
PROCESS WI FORMAT DRAWING PCS CONTROL PLAN CHECK SHEET SOP MASTER LIST
PREPARED BY APPROVED BY
Page : 13 of 14
Doc. No. QPMC-ML-MR-02
Rev, No. 0
Master List of External Documents Eff. Date: 08.06.2022
Customer/
National or
Sr No Name of Document/Part Name Document Revision/Edition Date/Year
International
body
Doc. No. SKV-ML-MR-03
Rev. No. 0
MASTER LIST OF RECORDS Eff. Date: 01.02.2023
Next due date of updation:
01.02.2024
RETENTION DISPOSAL SYSTEM
S.NO. DOCUMENT NO. DOCUMENT DESCRIPTION MAINTAINED BY
PERIOD MODE AUTHORITY
1 SKV-FM-QA-01 Equipment cum calibration plan with status One year QA Tear-off QA
3 SKV-FM-QA-03 Verification and validation plan of jig and fixture One year QA Tear-off QA
4 SKV-FM-QA-04 Verification and validation report of attribute gauge, jig / fixture One year QA Tear-off QA
7 SKV-FM-QA-07 Sampling plan for receiving inspection Till next change QA Tear-off QA
17 SKV-FM-QA-17 Defect analysis register for BOP part (monthly) One year QA Tear-off QA
23
Note: Whenever no change in document updation, Rev No. and Effective date will not change ; only due date of updation will change.