You are on page 1of 5

GROUND FLOOR

Pressure
Inside Diameter Pipe Length Fittings and Equivalent Friction Loss Pressure
Node Q(gpm) D(in) Qty. Length Total (ft) Friction P^0.5 Notes
(in) (ft) Devices Length (ft) (psi/ft) (psi)
(psi)

BRANCH E1
S27 22.5 16.14

P= 17.796746
k= 5.6
S27 to S28 22.5 1 in. 1.049 10.219 10.219 0.161813 1.653569906 17.80 4.2186
Q= 23.624266

S28 46.12426617 17.80

P= 20.2288423
k= 5.6
S28 to S29 46.12426617 1 1/4 in. 1.38 15.145 15.145 0.160587 2.432096347 20.22884227 4.4976
Q= 25.1868318

S29 71.31109793 20.22884227

Tee/Cross 1 8.4 P= 22.8156566


k= 5.6
S29 to TE 71.31109793 1 1/2 in. 1.61 6.841 15.241 0.169727 2.586814306 22.81565658 4.7766
Q= 26.7488129

TE 98.0599108 22.81565658

S30 22.5 16.14

Tee/Cross 1 8.4 P= 16.428112


k= 5.6
S30 to TE 22.5 1 1/2 in. 1.61 5.784 14.184 0.020089 0.284936112 16.43 4.0532
Q= 22.6977

TE 45.19770025 16.43

K @ TE = 11.151223
Corrected Flow = 53.26464
Total @ TE = 151.324551

Total TE 151.3245505 22.82

Tee/Cross 1 12 P= 27.364915
k= 5.6
Total TE to TF 151.3245505 2 in. 2.067 10.499 22.499 0.202198 4.549258346 27.36 5.2311
Q= 29.294432

TF 180.6189823 27.36

BRANCH E2
S31 22.5 16.14

STD 90 ELBOW 1 2.5 P= 18.0611488


k= 5.6
S31 to S32 22.5 1 in. 1.049 9.353 11.853 0.161813 1.917972805 18.06 4.2498
Q= 23.7991098

S32 46.2991098 1.917972805

P= 19.9341365
k= 5.6
S32 to S33 46.2991098 1 1/4 in. 1.38 11.582 11.582 0.161715 1.872987698 19.93413652 4.4648
Q= 25.0026903

S33 71.30180008 19.93413652

P= 21.6461026
k= 5.6
S33 to S34 71.30180008 1 1/2 in. 1.61 10.089 10.089 0.169686 1.711966057 21.64610258 4.6525
Q= 26.0542084

S34 97.35600851 21.64610258

P= 22.4382405
k= 5.6
S34 to S35 97.35600851 2 in. 2.067 8.859 8.859 0.089416 0.792137943 22.43824052 4.7369
Q= 26.5266512

S35 123.8826597 22.43824052

TEE/CROSS 1 12 P= 24.8540383
k= 6.6
S35 to TF 123.8826597 3 in. 2.067 5.3 17.3 0.139641 2.415797765 24.85403829 4.9854
Q= 32.9035242

TF 156.7861839 24.85403829

S36 22.5 16.14

P= 17.5766799
k= 5.6
S36 to S37 22.5 1 in. 1.049 8.859 8.859 0.161813 1.433503845 17.58 4.1925
Q= 23.4777486
S37 45.97774863 1.433503845

TEE/CROSS 1 12 P= 17.923928
k= 5.6
S37 to TF 45.97774863 2 in. 2.067 3.559 15.559 0.022318 0.347248147 17.92392801 4.2337
Q= 23.7085297

TF 69.68627837 17.92392801

K @ TF = 16.460032
Corrected Flow = 82.059555
Total @ TF = 238.845739

K @ TF = 47.909211
Corrected Flow = 250.6202
Total @ TF From Branch E1 431.239179

Total TF 431.2391795 27.36

Tee/Cross 1 12 P= 55.370664
k= 5.6
Total TF to TG 431.2391795 2 in. 2.067 7.956 19.956 1.403375 28.00574913 55.37 7.4411
Q= 41.670421

TG 472.909601 55.37

BRANCH E3
S38 22.5 16.14

TEE/CROSS 1 6 P= 17.461307
k= 5.6
S38 to TG1 22.5 1 in. 1.049 2.146 8.146 0.161813 1.318130977 17.46 4.1787
Q= 23.400568

TG1 45.9005681 17.46

K @ S38 to TG1 = 10.984485


Corrected Flow = 47.120036

S39 22.5 16.14

TEE/CROSS 1 6 P= 18.401442
k= 5.6
S39 to TG1 22.5 1 in. 1.049 7.956 13.956 0.161813 2.258266132 18.40 4.2897
Q= 24.022265

TG1 46.52226521 18.40

Total @ TG1 = 93.6423016

Total TG1 93.6423016 18.40

P= 21.50458
k= 5.6
Total TG1 to S40 93.6423016 1 1/4 in. 1.38 5.216 5.216 0.595203 3.104580381 21.50 4.6373
Q= 25.968898

S40 119.6111992 21.50

P= 24.001481
k= 6.6
S40 to TG 119.6111992 2 in. 2.067 19.08 19.08 0.130865 2.496900814 24.00 4.8991
Q= 32.334262

TG 151.9454615 24.00

K @ TG from S39 = 31.01478


Corrected Flow = 230.78553
Total @ TG = 703.695131

Total TG 703.6951315 55.37

Tee/Cross 1 12 P= 106.43651
k= 5.6
Total TG to TH 703.6951315 2 in. 2.067 2.707 14.707 3.472213 51.0658437 106.44 10.3168
Q= 57.774119

TH 761.469251 106.44

BRANCH E4
S41 22.5 16.14

P= 17.072308
k= 5.6
S41 to S42 22.5 1 in. 1.049 5.742 5.742 0.161813 0.929131852 17.07 4.1319
Q= 23.138444

S42 45.63844366 17.07

TEE/CROSS 1 12 P= 17.4531572
k= 5.6
S42 to TH 45.63844366 2 in. 2.067 5.3 17.3 0.022014 0.38084928 17.45315715 4.1777
Q= 23.3951065

TH 69.03355016 17.45315715
K @ S41 to TH= 16.524305
Corrected Flow = 69.449329

S43 22.5 16.14

P= 17.25807
k= 5.6
S43 to S44 22.5 1 in. 1.049 6.89 6.89 0.161813 1.114893498 17.26 4.1543
Q= 23.263986

S44 45.76398633 17.26

TEE/CROSS 1 12 P= 17.6640257
k= 5.6
S44 to TH 45.76398633 2 in. 2.067 6.347 18.347 0.022127 0.405956208 17.66402573 4.2029
Q= 23.5360117

TH 69.29999803 17.66402573

Total @ TH = 138.749327
K @ TH= 33.01308
Corrected Flow @ TH = 340.58957
Total @ TH from Origin 1102.05882

Total TH 1102.058825 106.44

STD 90 ELBOW 1 6.9 P= 153.19419


k= 5.6
Total TH to EI 1102.058825 2 1/2 in. 2.469 7.054 13.954 3.350844 46.75768241 153.19 12.3772
Q= 69.312119

EI 1171.370943 153.19

TEE/CROSS 1 16.4 P= 219.44718


k= 6.6
Total EI to TN 1171.370943 3 in. 3.068 34.469 50.869 1.302424 66.25298901 219.45 14.8137
Q= 97.770748

TN 1269.141691 219.45

BRANCH F1
S45 22.5 16.14

P= 18.428789
k= 5.6
S45 to S46 22.5 1 in. 1.049 14.125 14.125 0.161813 2.285612577 18.43 4.2929
Q= 24.040108

S46 46.54010837 18.43

TEE/CROSS 1 7.3 P= 19.8301875


k= 5.6
S46 to TJ 46.54010837 1 1/4 in. 1.38 1.283 8.583 0.163276 1.401398871 19.83018747 4.4531
Q= 24.9374152

TJ 71.47752361 19.83018747

S47 22.5 16.14

TEE/CROSS 1 7.3 P= 16.7106


k= 5.6
S47 to TJ 22.5 1 1/4 in. 1.38 6.033 13.333 0.042558 0.567423759 16.71 4.0879
Q= 22.892016

TJ 45.39201627 16.71

K @ S47 to TJ = 11.104102
Corrected Flow = 49.447788
Total @ TJ = 116.86954

Total TJ 116.8695399 19.83

TEE/CROSS 1 8.4 P= 26.08925


k= 5.6
Total TJ to TK 116.8695399 1 1/2 in. 1.61 6.386 14.786 0.423310 6.259062432 26.09 5.1078
Q= 28.603477

TK 145.4730165 26.09

BRANCH F2
S48 22.5 16.14

TEE/CR0SS 1 8.4 P= 16.433114


k= 5.6
S48 to TK 22.5 1 1/2 in. 1.61 6.033 14.433 0.020089 0.289938163 16.43 4.0538
Q= 22.701155

TK 45.20115549 16.43

K @ S48 to TK = 11.150378
Corrected Flow = 56.953497
Total @ TK = 202.426514

Total TK 202.4265138 26.09


TEE/CROSS 1 8.4 P= 40.640355
k= 5.6
Total TK to TL 202.4265138 1 1/2 in. 1.61 4.042 12.442 1.169515 14.55110559 40.64 6.3750
Q= 35.699882

TL 238.1263954 40.64

BRANCH F3
S49 22.5 16.14

TEE/CR0SS 1 8.4 P= 16.487373


k= 5.6
S49 to TL 22.5 1 1/2 in. 1.61 8.734 17.134 0.020089 0.34419736 16.49 4.0605
Q= 22.738602

TL 45.23860218 16.49

K @ S49 to TL = 11.141238
Corrected Flow = 71.025155
Total @ TL = 309.15155

Total TL 309.1515503 40.64

TEE/CROSS 1 12 P= 56.953732
k= 5.6
Total TL to TM 309.1515503 2 in. 2.067 9.517 21.517 0.758162 16.31337695 56.95 7.5468
Q= 42.26191

TM 351.4134605 56.95

BRANCH F4
S50 22.5 16.14

TEE/CR0SS 1 6 P= 17.618428
k= 5.6
S50 to TM1 22.5 1 in. 1.049 3.117 9.117 0.161813 1.475251672 17.62 4.1974
Q= 23.505614

TM1 46.00561406 17.62

S51 22.5 16.14

TEE/CR0SS 1 6 P= 17.59189
k= 5.6
S51 to TM1 22.5 1 in. 1.049 2.953 8.953 0.161813 1.448714294 17.59 4.1943
Q= 23.487905

TM1 45.98790498 17.59

K @ G25 to TM1 = 10.964463


Corrected Flow = 46.022578
Total @ TM1 = 92.0281924

Total TM1 92.02819236 17.62

TEE/CROSS 1 12 P= 19.352153
k= 5.6
Total TM1 to TM 92.02819236 2 in. 2.067 9.517 21.517 0.080575 1.733725663 19.35 4.3991
Q= 24.635006

TM 116.6631985 19.35

S52 22.5 16.14

TEE/CR0SS 1 6 P= 17.618428
k= 5.6
S52 to TM2 22.5 1 in. 1.049 3.117 9.117 0.161813 1.475251672 17.62 4.1974
Q= 23.505614

TM2 46.00561406 17.62

S53 22.5 16.14

TEE/CR0SS 1 6 P= 17.59189
k= 5.6
S53 to TM2 22.5 1 in. 1.049 2.953 8.953 0.161813 1.448714294 17.59 4.1943
Q= 23.487905

TM2 45.98790498 17.59

K @ G27 to TM2 = 10.964463


Corrected Flow = 46.022578
Total @ TM2 = 92.0281924

Total TM2 92.02819236 17.62


Total TM2 92.02819236 17.62

TEE/CROSS 1 12 P= 19.352153
k= 5.6
Total TM2 to TM 92.02819236 2 in. 2.067 9.517 21.517 0.080575 1.733725663 19.35 4.3991
Q= 24.635006

TM 116.6631985 19.35

Total @ TM from TM1&2 = 233.326397


K @ TM from TM1&2 = 53.039476
Corrected Flow = 400.27671
Total @ TM = 751.690171

Total TM 751.6901707 56.95

TEE/CROSS 1 16.4 P= 71.151265


k= 5.6
Total TM to TN 751.6901707 3 in. 3.068 8.367 24.767 0.573244 14.1975323 71.15 8.4351
Q= 47.236677

TN 798.9268478 71.15

K @ TN = 94.714333
Corrected Flow = 1403.0744
Total @ TN = 2672.2161

MAIN LINE GROUND FLOOR


Total TN 2672.216105 219.45

STD 90 ELBOW 1 7.9 P= 508.13


Gate Valve 1 9.9 k= 5.6
Total TN to GM 2672.216105 3 in. 3.068 13.999 48.199 5.989354 288.680863 508.13 22.5417
TEE/CROSS 1 16.4 Q= 126.2335

GM 2798.449601 508.13

Total GM 4827.766534 508.13

STD 90 ELBOW 1 7.9 P= 774.68


k= 5.6
Total GM to PUMP 4827.766534 3 in. 3.068 7 14.9 17.889497 266.5535056 774.68 27.8331
Q= 155.86537

PUMP 4983.631903 774.68