Professional Documents
Culture Documents
1 20 cm
Q
2 30 cm Ya
30
Garis NETRAL
5 40 50 cm
240 cm
I_netral
28723845.56
12565897.189024
1423576.9242682
11584007.968802
54529711.4806508
28798.7484471354
-578531.718978379
-798020.620032412
-393894.831986846
-489692.538428125
106595698.1584
99.137605165311 cm
140.862394834689 cm
106595698.1584 cm4
>> interface segmen 1 dan 2
q= 4.0817523 t qxL=
P1 = 20 t P2 = 35
j1 = 6 9 5
bentang 20 m
(20/30/40) m
R sendi = 63.567523
R roll = 73.067523
SFD
63.57 39.0770092
19.077009
6 5
-17.66
-52.66
t
5 = j2 Vmax = 73.067523
tau max = 2.1996226 kg/cm2
-73.07
GIRDER
bentang 20
20/30/40m
LIVE LOAD akibat LALU-LINTAS (MINIMAL 5000 kg/m - maksimal 10000 kg/m)
Ya = 99.137605165311 cm
Yb = 140.8623948347 cm
I beam = 106595698.1584 cm^4
SIGMA ATAS =
SIGMA BAWAH =
MUTU BETON >>> fc' 450
0.5 AKAR FC'
kuat tarik max beton = 10.6
0.45 fc' = 202.5
Kesimpulan
Dibutuhkan stressing yang menimbulkan
tegangan tarik serat tepi bawah maks
m
=MOMEN*Ya/(I)
32.7849939
46.583460945243
kg/cm^2 KG/CM^2
400/450/500 KG/CM^2
kg/cm^2 TIDAK OK
tekan max OK