The hydrotesting report summarizes the results of pressure testing of 27 sections of pipeline with a total length of 3224 meters in the Makhapur scheme of Phoolpur block, Azamgarh district. The pipelines ranged between 63-90 mm diameters and were tested at 6 kg/sqcm pressure on April 26, 2023. All 27 pipeline sections passed the pressure test with no reported leakages. The contractor and third party inspector representatives signed off on the successful completion of hydrotesting.
The hydrotesting report summarizes the results of pressure testing of 27 sections of pipeline with a total length of 3224 meters in the Makhapur scheme of Phoolpur block, Azamgarh district. The pipelines ranged between 63-90 mm diameters and were tested at 6 kg/sqcm pressure on April 26, 2023. All 27 pipeline sections passed the pressure test with no reported leakages. The contractor and third party inspector representatives signed off on the successful completion of hydrotesting.
The hydrotesting report summarizes the results of pressure testing of 27 sections of pipeline with a total length of 3224 meters in the Makhapur scheme of Phoolpur block, Azamgarh district. The pipelines ranged between 63-90 mm diameters and were tested at 6 kg/sqcm pressure on April 26, 2023. All 27 pipeline sections passed the pressure test with no reported leakages. The contractor and third party inspector representatives signed off on the successful completion of hydrotesting.
Name of Work : Jal Jeevan Mission Phase-3 Agreement No. & Date : 29/ED/Phase-3/2021-22/08-01-2022 District : Azamgarh Name of Block : Phoolpur Pipe Type:HDPE PE-100 PN6 Name of Scheme : Makhapur Test Pressure: 6 Kg/sqcm Node/JN Water Teasting Pipe line Dia of TOTAL Leakages S.N. Filling Pressure Tested on REMARKS From To Pipe LENGTH Observed Starting attend ON Pressure 1 J- 56 J - 49 63 435 26-04-23 6kg/sqcm 6kg/sqcm No Leakage
Total 3224 Total Length of Pipe(63MM) 2807 Total Length of Pipe(75MM) 219 Total Length of Pipe(90MM) 198 Total Length of Pipe(110MM) 0 Total Length of Pipe(125MM) 0 Total Length of Pipe(140MM) 0 Total Length of Pipe(160MM) 0 Total Length of Pipe(180MM) 0 Total Length of Pipe(200MM) 0 TOTAL 3224 Conclusion: Hydrotesting has passed successfully