Report No.: 20031Be Contents: 16 Sheets
Test object: Control and operating mechanism cubicle of three-pole operated outdoor
circuit-breaker
Designation: 3AP1FG - 145 kV - 3150 A - 40 kA - 50 Hz
Rated voltage: - Rated normal current: - Rated frequency: -
According to STL Objectives and Operating Principles PEHLA issues a Test Document following exclusively the above mentioned
standards and the STL Guides wherever applicable.
Tests performed:
Temperature-rise test of the auxiliary and control equipment for temperature class -30 to +55 °C
Test results:
The test object has passed the test stated above without any objection.
ݸ®·¬·¿² Õ®«½¸¿
Management Committee
02PE2001
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 2
General Information
Accreditation
The PEHLA GbR, PEHLA Testing Laboratory Berlin has been approved by DAkkS, the Deutsche Akkreditierungsstelle
GmbH (German Accreditation Body), according to EN ISO/IEC 17025 for tests in the field of high-voltage switchgear
and controlgear and power engineering equipment (Registration No. D-PL-12072-04-00).
STL Member
PEHLA (DE, CH) is a founder member of the SHORT-CIRCUIT TESTING LIAISON (STL) which has been established
in 1969. The STL provides a forum for international collaboration between testing organisations. For further information,
please see www.stl-liaison.org.
PEHLA Documents
A STL Type Test Certificate
is issued for type tests which have successfully been carried out in full compliance with the relevant standards and STL
Guides valid at the time of the test. For these tests the test object must be clearly identified by technical description,
drawings and additional specifications.
A Test Document
is issued for parts of type tests which have successfully been carried out in full compliance with the relevant standards
and STL Guides valid at the time of test. For these tests the test object must be clearly identified by technical description,
drawings and additional specifications.
A Test Report
is issued for all other tests which have been carried out according to standards, specifications and/or additional
instructions. Similarly, this test report contains all test results, details of the conditions under which the tests have been
carried out, also details relating to the behaviour of the test object, and its condition after the tests.
A Test Confirmation
is issued immediately after the tests. It confirms that the tests have been conducted and is valid only until issuing the
detailed results in an entire document.
Uncertainty of the Measurement Systems
The PEHLA Testing Laboratories apply the STL Technical Report “Handling of Measurement Uncertainties in Testing
and Test Documents” for determining the uncertainties of measurement. As long as no explicit statements are made,
the uncertainties required by the relevant standards have been complied with.
Addresses
Office: PEHLA Office Client: Siemens Gas and Power GmbH & Co. KG
Hallenweg 40 GP TP SW R&D TF BD
68219 Mannheim-Rheinau Nonnendammallee 104
Germany 13629 Berlin
www.pehla.com as partner and contractor of PEHLA GbR
02PE2001
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 3
Table of Contents
14PE1710
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 4
Test Engineers:
Representatives of Manufacturer:
Further Participants:
51PE1710
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 5
Test object: Control and operating mechanism cubicle of three-pole operated outdoor
circuit-breaker
Designation: 3AP1FG - 145 kV - 3150 A - 40 kA - 50 Hz
Manufacturer: Siemens High Voltage Circuit Breaker Co., Ltd., Hangzhou
Serial No.: 19/K40042868
Year of manufacture: 2019
Serial No. of drive: 1982 7569 8
Drawing No.: Control and operating mechanism cubicle: 592-01071-603
Circuit diagram: CHN 458 00055 205
Further data:
Dimension of control and operating mechanism cubicle
Height 1082 mm
Width 1020 mm
Depth 490 mm
Essential characteristics: -
Remarks: -
515SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 6
The manufacturer has guaranteed to the testing laboratory that the documents for verification listed in the
following table unambiguously describe the test object.
The testing laboratory has checked that the documents for verification submitted, adequately represent
the test object, but is not responsible for the accuracy of the detailed information.
P/D/F/ Additional
Document No. Rev.1) Title
W information
3HM 427-44102-501 D D Triple-pole circuit-breaker 145kV Sheet 1
1HZ 427-44700-514 K D Circuit-breaker 3AP1 FG-1S 145kV Sheet 1-4
427-44700-514 0I P 3AP1 FG-1S-145kV BOM Sheet 1
1HG 427-44701-001 F1 D Breaker base Sheet 1
1HG 427-44701-001 I1 P Breaker base Sheet 1-3
592-01071-603 OC D cabinet(smart FG-145) Sheet 1, 2 2), 3, 4
CHN 458 00055 205 2D W Circuit Documents Sheet 1-14
Legend: P: Parts list, D: Drawing, F: File, W: Wiring diagram
52PE1710
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 7
449SE1104
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 8
Temperature-rise Test
Auxiliary and Control Equipment
Test performance:
For the temperature-rise test, the components which are active during normal operation of the control
equipment (no switching operation of the related switching apparatus) were connected to their rated
supply voltage of 220 V d.c. The anti-condensation equipment (heating) was supplied by the rated voltage
of 220 V a.c.
At the end of the test the components which are active during operating cycles of the circuit-breaker,
including tripping coils and recharging device of driving mechanism, were energized by their rated supply
voltage and commands were given to operate 10 operating cycles within 10 minutes.
The circuits which are relevant with regard to the temperature-rise test are energized by the following
terminals: X1/450, X1/465, X1/480, X1/481, X1/486, X1/487, X1/503, X1/504, X1/518, X1/519, X1/610,
X1/626, X1/632, X1/646 (Circuit diagram drawing CHN 458 00055 205 2 D).
The measuring sensors are located in 0.5 to 1 cm distance in front of the components.
Remarks: -
416SE1009
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 9
Remarks: 1) The permitted maximum ambient temperatures of components are given by the
manufacturer
417SE1606
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 10
Test Results
Temperature-rise Test
Remarks: 1) Results after 17 hours of normal operation of the control and operating mechanism
cubicle (no switching operation of the related switching apparatus)
2) The permitted temperature rise limits are valid for an ambient air temperature of +55 °C
and are given by the manufacturer (see sheet 9)
418SE1009
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 11
Test Results
Temperature-rise Test
Remarks: 1) Results after 17 hours of normal operation of the control and operating mechanism
cubicle and after 10 switching operation cycles of the related switching apparatus
2) The permitted temperature rise limits are valid for an ambient air temperature of +55 °C
and are given by the manufacturer (see sheet 9)
418aSE1009
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 12
The temperature-rise test was made on a control and operating mechanism cubicle of a three-pole
operated outdoor circuit-breaker.
The values of temperature rise at all measuring points did not exceed the limits specified by IEC 62271-1
nor the limits of components given by the manufacturer.
The permitted temperature rise limits are valid for an ambient air temperature of +55 °C.
After the test, the following observations were made during the visual inspection:
All mechanical parts and parts of auxiliary and control equipment did not show any undue wear nor any
distortion.
461se1503
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 13
Temperature-rise Test
Arrangement of the Temperature Measuring Points
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15
419SE1009
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 14
411SE1104
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 15
411SE1104
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 20031Be Sheet: 16
411SE1104