No Discipline System Feed Stage Detailed Stage Changes Impact Imacted Discipline RFQ by Additional MTO piping comments Cost in Feed Cost after change Variation in Cost

Flow rate: 148500 Nm³/yr = 26.73 Nm³/hr Flow rate: 518400 Nm³/yr = 60 Nm³/hr As per client email, 08-Sep-22, client increased the hydrogen working capacity and Positive impact in cost
Supply pressure : 0.5 barg Supply pressure : 7 barg operating pressure as per the confirmation recieved against RFI-31.

Due to these changes, the storage capacity of one H2 vessel is increased from 70
³m/hr to 110 m³/hr (approx. 37 % capacity increament observed in each vessel) it
results in positive cost impact.

Mechanical
1 Process Hydrogen Civil Mechanical All
Piping

1" connection to tube plant is available in P&ID Client asked to remove the connection Pipe and fittings reduce Negative impact in cost

2 Process Hydrogen Piping Piping

All pipe & fittings including metering skids are 4" in size. All 4 inch lines and fittings including metering skids are reduced in size from 4 inch a) Pipe and fittings size reduce Negative impact in cost
to 2 inch. After performing hydraulic calculation on true operating conditions b) Instrumentation

1) Piping
3 Process Natural Gas Piping
2) Instrumentation

No Tie-In details like wise flow rate, pressure etc. of natural gas As per the shared information from SPARK in RFI-08 it was found out that the a) 2 PSVs Positive impact in cost.
were available, due to this 150# rating was considered for the design SPARK line was designed on 300 #, for the safety of line two PSVs along with PT b) one PIT and fittings are added
and the securities were given accordingly in FEED. The same is are added in detail engineering on u/s of metering skid. c) Some pipe and fittings
mentioned in FEED package drawing's note-1

1) Instrumentation
4 Process Natural Gas Instrument All
2) piping

No securities were considered to save the heat treatment plant users To avoide any unforseen safety concern & for safe operation two PSVs along with a) 2 PSVs Positive impact in cost.
PT are added in detail engineering on d/s of PCV. As no information / drawings are b) one PIT and fittings are added
available inside the SeAH plant to study existing safeties. c) Some pipe and fittings

1) Instrumentation
5 Process Natural Gas Instrument All
2) piping

Distribution line for end users were shown in Feed documents All distribution lines deleted from Sendan scope. Sendan has to provide only main a) Pipe and fittings are reduced Negative impact in cost
header 6 inch and one isolation valve at tie-in. All the instrument installed on these b) Instruments de-scoped
lines are also de-scoped
(Confirmed by Shibily)

1) Instrumentation
6 Process Instrument Air All Old ISO not available
2) piping

In Feed the I/A requirement was mentioned 3000 m³/hr however As per client reply on 24-10-22 the capacity was increased from 1700 m³/hr to 3000 One more compressor is added Positive impact in cost
during the stage of bid clarification response # 523 revcieved from m³/hr
SeAH to consider only 1700 m³/hr I/A flow for the design

Mechanical
7 Process Instrument Air Civil Mechanical All

1/2
S.No Discipline System Feed Stage Detailed Stage Changes Impact Imacted Discipline RFQ by Additional MTO piping comments Cost in Feed Cost after change Variation in Cost

In feed only dry air was considered for the SeAH plant operation In detail engineering, it was found that I/A of having -20 C dew point is also required a) Desccant dryer Positive impact in cost
requirement i.e. 3 C dew point. for the instruments. Due to this one desccant dryer and one I/A reciever of 2m³ b) I/A reciever
capacity is added in the scope c) Connected piping
d)Associated Instruments

1) Instrumentation
2) piping Mechanical/reviewed
8 Process Instrument Air All Old ISO not available
3) Mechanical by all
4) Civil

In Feed the boiler capacity was 10 ton/hr In detail engineering client ask to reduce the capacity from 10 ton/hr to 5 ton/hr Boiler size decreased Negative impact in cost 1) Mechanical
9 Process Boiler Mechnical
2) Civil

In Feed only cooling water flux & chiller duty was given by client by In reply of RFI-14, client responded on 7th of Oct 2022. In addition to that in reply of Positive impact in cost
specifying the outlet water requirement which is <35 0­C. No PID or RFI-19 on 26-Oct-22, SGSI sent further details related to chiller package.
other information was available.

Items including
a) 1 Heat exchanger
b) 2 water circulation Pumps from main pond to exchanger of 800 m³/hr
Chiller Mechanical
11 Process c) 20” Inlet & outlet connection, pipe and fittings from pumps to main pond to heat Civil
1) Mechanical
exchanger.
2) Civil
d) 2 pumps at chiller end of 530 m³/hr
e) VFD drive chiller considered as per email 26-Oct-22

In Feed, no information was available related to chiller scheme In reply of RFI-14, client responded on 7th of Oct 2022. In addition to that in reply of Items Added: Positive impact in cost
RFI-19 on 26-Oct-22, SGSI sent further details related to chiller package. Further in a) One 100% working capacity chiller
email 24-Feb-23 SGSI recommended 3 chillers units (2 working 100% + 1 standby b) One 50 % capacity
50 %)

Chiller Mechanical
12 Process Civil
1) Mechanical
2) Civil

In Feed only RO water capacity was mentioned along with As per email 24-Feb-23 SGSI recommended to consider some HE to save RO a) Pipe and fittings are added fromRO water supply Positive impact in cost
necessary RO water system components. No PID or other water membrane as water supply temperature from SPARK could be raised upto 40 b) Portable water tank size increased from 2000 m³ to 2500 m³ to accommodate
information was available. . In other meeting with SGSI it was suggested to take water connection from RO plant capacity.
portable water tank

Water Supply to RO unit 1) piping


13 Process All
2)Civil

Additiona connection from portable water In Feed there is no such provision was available or required In One meeting SGSI demanded one 2" connection from portable water tank to Pipe and fittings are added Positive impact in cost Piping
14 Process tank to main pond main pond 1) piping
Civil
a) 2 PSVs Positive impact in cost.
b) one PIT and fittings are added
c) Some pipe and fittings

NITROGEN SKID AND DISTRIBUTION


1) Instrumentation
15 Process Instrument All
2) piping