GUARANTEE
1 General
This document sets out the functional guarantees required to be provided by the Bidder for
assessing the performance of the Works. These guarantees shall be used by the Employer
to evaluate Bidder’s satisfactory performance during the Tests after Completion, and also
throughout the Operation and Maintenance Period.
The Bidder shall complete the following sections and provide values for the electrical
energy usage and chemical usage for the Works covered under the contract, based
on the raw sewage flows and characteristics and specified effluent and sludge quality
requirements as given in Part - 2 of Volume 3A of bid document.
The Guaranteed power consumption for all the units in the STPs shall be justified as per Electrical load list provided below.
11 Flash Mixer
12 Flocculator
13 Clarifier Mechanism
15 Backwash Pumps
1.2.2 Dewatering Polymer Usage per Unit Volume of Plant Effluent for Biological Sludge
Mehsana Total Guaranteed
STP Name Polymer
Consumption for all
STP Capacity 23.18 MLD 18.46 MLD STPs in the
(cum/day) (Nagalpur) (Kasba) Contract
(Kg/day)
Not more than: Not more than:
The consumption of ……………kg per ……………kg per cubic
dewatering Polymer cubic meter (cum) meter (cum) of
(polyelectrolyte) of plant plant effluent
during the Tests after effluent
Completion is
guaranteed to be:
1.2.3 Dewatering Polymer Usage per Unit Volume of Plant Effluent for Chemical Sludge (if Required)
1.2.4 Coagulant Usage per Unit Volume of Plant Effluent (if required)
Mehsana Total Guaranteed
STP Name Coagulant
Consumption for all
STP Capacity 23.18 MLD 18.46 MLD(Kasba) STPs in the
(cum/day) (Nagalpur) Contract
(Kg/day)
Not more than: Not more than:
The consumption of ……………kg per ……………kg per
Coagulant during the cubic meter (cum) of cubic meter (cum)
Tests after Completion plant effluent
is guaranteed to be:
of plant
effluent