WASTE WATER) RSTDIP/MDW/03

(vi) Units for post-treatment by chlorination as well as for mechanical sludge dewatering/drying
etc shall also be included in scope of work and as per CPHEEO manual. Chlorine tonners of
minimum storage capacity to satisfy needs of minimum 15 days shall be provided on
standby.
Contractor shall also provide all ancillaries that are required for proper working of the STPs. Minimum
requirement of treatment plant units, ancillaries, equipment, instrumentation etc shall be strictly as per the latest
CPHEEO Manual. SBR tanks shall have minimum side water depth as 5.5 m. Freeboard in all the units shall be
minimum 0.5 m. Minimum requirements of processing units and equipment are given in subsequent sections.
Plant and ancillaries shall be designed to achieve desired treated water quality with easy, cost-effective and
normal operation of plant and least utilization of consumable chemicals. The Decanter shall be moving weir
type and made of SS 316.
Table 19: SEQUENCE BATCH REACTOR
Sr.No. Description Requirements
A SBR Basins
Recycle + Average flow with provision to
a) Design Flow
accommodate peak flow
b) Nos of reactors 2 Nos (Minimum)
c) Material of Construction RCC M35 in Sulphate Resistant Cement
d) Number of Cycles/day/basin 8.0 (maximum)
e) MLSS As per technology provider
f) F/M Ratio (BOD) 0.15 (Maximum) or as per technology provider.
Kg. Of Oxygen required/kg of BOD
g) 1.2 Kg. (minimum)
removed
Hydraulic Retention time of SBR
h) 14 hours (minimum)
(Aerobic) tanks
i) Aerobic SRT 10 days (minimum) or as per technology provider.
j) Specific Sludge Yield 1.1 kg / Kg BOD
k) Liquid Depth 5.5 m (maximum)
l) Free Board 0.5 m (Minimum)
B Aeration Requirements
a) BOD Oxidation Oxygen Requirement 1.2 x Inlet BOD Load
b) Nitrification Oxygen Requirement 4.5 x TKN Nitrification
c) Total Requirement BOD Oxidation + Nitrification Oxygen Requirement
No credit to be considered while designing the
d) Oxygen Credit (from De- Nitrification)
capacity Air Blowers
e) Net Oxygen Requirement Total Requirement Oxygen Credit
f) Oxygen Demand Safety Factor 10%
Alpha value for Submerged Diffuser
g) 0.6
Shall not be higher than
Beta value for Submerged Diffuser
h) 0.95
Shall not be higher than
i) Fouling Factor for Diffuser 0.8
j) Maximum Sewage Temperature 320C
k) Elevation above MSL As per approved HFD.
Min. Dissolved oxygen to be maintained
l) 2.0 mg/l
in the Aeration tank
m) Oxygen content in Air (by weight) 23%
Minimum hours of Aeration per
n) 12 hours (minimum)
day/basin
Fine bubble diffused aeration tubular/disk type.
o) Type of aeration retrievable type diffuse installation for easy
maintenance
EPDM / PU/Silicon Rubber with Anti-Microbial
p) Diffuser membrane MOC
Coating based fine bubble diffusers
q) Specific air flow rate of Diffuser(L=1.0m) 6.0 Nm3/h/unit
r) No. of diffuser As per process design

Rajasthan Urban Infrastructure Development Project P a g e | 42 of81


WASTE WATER) RSTDIP/MDW/03

Sr.No. Description Requirements


Standard Oxygen transfer efficiency
s) (SOTE) of Diffuser per meter depth of 5% / meter depth of submergence
submergence - %/meter
-
t) Nos. of Process Air Blowers
By(minimum)
Positive Displacement Root Blower/ Centrifugal
u) Type
Blowers.
v) Air Blower Capacity
w) Discharge Pressure 0.70 Kg/cm2 (minimum)
x) Air Blower Motor Rating
Variable Frequency Drives for Air Blower Motors
(PLC controlled by Dissolved Oxygen Sensors in all
y) Accessories Aeration Tanks and Electrically Actuated Butterfly
Valves at Inlet of Air Distribution Grid to all Aeration
Tanks) as per vendor design.
On-line measurement with data logging facility and
communication to main PLC of following process
parameters shall be provided at each basins:
Dissolved oxygen in oxic tank (1 1.5m below
z) Instruments water level); ORP in aeration tank; MLSS in
aeration tank; Decanting level indicating
instruments. All other necessary instruments
required for the completeness of the system and as
per the technology provider.
C Decanting Device
Recycle + Average flow with provision to
a) Design Flow
accommodate peak flow
Floating decanters (or) any other form of
b) Type mechanical decanters as per the technology

c) Quantity Minimum 1 decanter per basin


d) MOC SS 316 completely
1/3 of the tank liquid depth or as per technology
e) Decanting Depth
provider
f) Decanter travel rate 60 mm/min (Maximum)
g) Other Technical details As per technical specifications

Note: Due consideration must be given in the design to the need for emptying tanks for maintenance
and repair of the aeration equipment. Intermediate wall shall be designed for empty conditions on either
side.

6.3.24.18 CHLORINATION ROOM


A chlorine cylinder store and chlorination room shall be provided at suitable location to facilitate dosing of
chlorine for post-treatment in the STP. Chlorinator room and chlorine cylinder store shall be RCC frame
structure. Chlorine store will have walls on three sides up to 1000 mm height. Chlorinator room shall have full-
height walls.
Location of chlorine cylinder store shall be suitable for easy loading and unloading of drums from the lorry.
Appropriate saddle shall be provided for safekeeping of tonners. Working and standby tonners shall be placed
on rollers.
Provision for electrically operated hoist shall be made for loading and unloading of cylinder form the lorry as
well as for handling of drums in the chlorine store. Provision for an alkali pit shall be made so that any leaking
cylinder can be dumped into it by lifting and moving by hoist provided for handling of the cylinder.
Floor of drum store shall be provided with ironite top finish.
Chlorinator room shall be suitable for locating two nos., vacuum type chlorinators and ancillary equipment.
Room shall be provided with Exhaust fan at bottom wall for venting out contaminated air.
Contractor will have to obtain
office and all other statutory approvals required for handling, storage and use of chlorine gas in pressurized
cylinder.