PROJECT NAME :
PROJECT OWNER :
PROJECT LOCATION :
MATERIALS
1.0 CEILING
a. CeilingFraming
-Full Thead
-Threaded Bolt
-Threaded Hanger Clip
-Double Furring Channel
-W-Clip
-Carrying Channel
-Wall Angle
-Job Screw
b. Ceiling Enclosure
-Gypsum Board
-Plywood
2.0 DRYWALLS
a. Drywall Framing
-Metal Tracks
-Metal Studs
-Job Screw
b. Drywall Board
-Gypsum Board
-Plywood
3.0 CHB WALLS
a. Hallow Blocks
b. Bistay Sand
c. Cement
d. 10mm Ø Rebar
4.0 FLOORING - Floor topping
a. Cement
b. Bistay Sand
5.0 FORMWORKS
a. Plywood
b. Common Nail
6.0 CARPENTRY WORKS
a. Plywood
b. Black Screw
TOOLS
1.0 Power Tools
a. Grinder
b. Electric Drill
c. Spray Paint
d. Sander
2.0 Handy Tools
a. Level Bar
b. Tansi
c. Iskwala
d. Kartilya
e. Shovels
Page 1 of 2
Requeasted 1st Delivery 2nd Delivery 3rd Delivery
# DESCRIPTION
Date QTY Date QTY Date QTY Date QTY
f. Lay-out Tools
g. Level Hose
h. Hammer
3.0 Cleaning Tools
a. Broom
b. Dustpan
c. Vaccum Cleaner
d. Mop
e. Cleaning Rags
4.0 Machine
a. Welding Machine
b. Air Compressor
OTHERS
1.0 ToolBox
2.0 Concrete Mixer
3.0 Wheelbarrow
4.0 Push Cart
5.0 Drum
6.0 Ladder
7.0 Scaffoldings
8.0 Temporary Lights
9.0 Temporary Plumbing
10.0 Cleaning Tools
11.0 Water Container (for drinking water)
12.0 Jack hammer
Prepared by:
Site Engineer/Architect
Page 2 of 2