MATERIAL TAKE OFF CHECKLIST

PROJECT NAME :
PROJECT OWNER :
PROJECT LOCATION :

Requeasted 1st Delivery 2nd Delivery 3rd Delivery


# DESCRIPTION
Date QTY Date QTY Date QTY Date QTY

MATERIALS
1.0 CEILING
a. CeilingFraming
-Full Thead
-Threaded Bolt
-Threaded Hanger Clip
-Double Furring Channel
-W-Clip
-Carrying Channel
-Wall Angle
-Job Screw
b. Ceiling Enclosure
-Gypsum Board
-Plywood
2.0 DRYWALLS
a. Drywall Framing
-Metal Tracks
-Metal Studs
-Job Screw
b. Drywall Board
-Gypsum Board
-Plywood
3.0 CHB WALLS
a. Hallow Blocks
b. Bistay Sand
c. Cement
d. 10mm Ø Rebar
4.0 FLOORING - Floor topping
a. Cement
b. Bistay Sand
5.0 FORMWORKS
a. Plywood
b. Common Nail
6.0 CARPENTRY WORKS
a. Plywood
b. Black Screw

TOOLS
1.0 Power Tools
a. Grinder
b. Electric Drill
c. Spray Paint
d. Sander
2.0 Handy Tools
a. Level Bar
b. Tansi
c. Iskwala
d. Kartilya
e. Shovels

Page 1 of 2
Requeasted 1st Delivery 2nd Delivery 3rd Delivery
# DESCRIPTION
Date QTY Date QTY Date QTY Date QTY

f. Lay-out Tools
g. Level Hose
h. Hammer
3.0 Cleaning Tools
a. Broom
b. Dustpan
c. Vaccum Cleaner
d. Mop
e. Cleaning Rags
4.0 Machine
a. Welding Machine
b. Air Compressor

OTHERS
1.0 ToolBox
2.0 Concrete Mixer
3.0 Wheelbarrow
4.0 Push Cart
5.0 Drum
6.0 Ladder
7.0 Scaffoldings
8.0 Temporary Lights
9.0 Temporary Plumbing
10.0 Cleaning Tools
11.0 Water Container (for drinking water)
12.0 Jack hammer

OTHERS (Please Specify)


1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0

Prepared by:

Site Engineer/Architect

Page 2 of 2