Professional Documents
Culture Documents
Current as of Wednesday, May 15, 2023 | Subject to change | Final program will be available in Attendee Hub App.
Task Group 692, Compressor Dry Gas Seals 8:00 AM – 5:00 PM TBD
SOME Joint Review on API 610, Centrifugal Pumps 8:00 AM - 5:00 PM TBD
Task Group 682, Pumps - Shaft Sealing Systems for 8:00 AM - 5:00 PM TBD
Centrifugal and Rotary Pumps
Task Group 682, Pumps - Shaft Sealing Systems for 8:00 AM - 5:00 PM TBD
Centrifugal and Rotary Pumps
SOME Joint Review on API 610, Centrifugal Pumps 8:30 AM – 11:00 AM TBD
Orientation for New Committee Members and New 8:30 AM – 9:30 PM TBD
Attendees
Task Group on Corrosion and Materials Research 8:30 AM – 9:30 AM TBD
Task Group on Std. 661, Air Cooled Heat Exchangers 8:30 AM - 5:30 PM TBD
API 12D - Specification for Field-Welded Tanks for 9:00 AM - 10:00 AM TBD
Storage of Production Liquids
SOME Joint Review on Std. 692, Dry Gas Seals 9:00 AM - 10:00 AM TBD
API 934-A 2.25 &3.0 CrMov Materials and Fabrication, 1:00 PM - 4:30 PM TBD
API 934-B/D, API RP 934-C 1.25 CrMo for >825F
Materials&Fabrication
Program
Afternoon Coffee Service 2:00 PM - 2:30 PM TBD
Task Force API 608, Metal Ball Valves--Flanged, 2:00 PM – 4:00 PM TBD
Threaded and Butt-Welding Ends
Specification 12F, Shop Welded Tanks for Production 3:00 PM - 4:30 PM TBD
Liquids
API RP 651, Cathodic Protection of Aboveground 3:00 PM - 4:30 PM TBD
Petroleum Storage Tanks
Task Force API 591, Process Valve Qualification 3:30 PM - 5:00 PM TBD
Procedure
API RP 583 Corrision Under Insulation and Fireproofing 3:30 PM - 5:30 PM TBD
Task Force 599, Metal Plug Valves-- Flanged and 4:00 PM - 5:00 PM TBD
Welding Ends
SCHTE Fired Consensus Group 4:00 PM - 5:30 PM TBD
API 934-G & J Coke Drum Design and Fabrication 8:00 AM - 10:00 AM TBD
API RP 586, NDE Methods for Equipment Damage 8:00 AM - 12:00 PM TBD
Mechanisms
Piping - Joint Meeting 8:00 AM - 12:00 PM TBD
SOME Joint Review on Std. 673, Centrifugal Fans 1:00 PM - 4:30 PM TBD
API RP 575 Inspection Practices for Atmospheric and 8:00 AM - 9:00 AM TBD
Low-pressure Storage Tanks
HF Alky Valve 8:00 AM - 9:00 AM TBD
Task Group on Std. 526/527, Flanged Steel Pressure 8:00 AM - 10:00 AM TBD
Relief Valves and Seat Tightness of Relief Valves
Safety and Fire Protection Group 8:00 AM - 12:00 PM TBD
API RP 573 Inspection of Fired Boilers and Heaters 9:00 AM – 10:00 AM TBD
SOME Joint Review on Std. 670 - Machinery Protection 10:00 AM - 12:00 PM TBD
Systems
Task Group on Biofuels Materials and Corrosion 10:00 AM - 12:00 PM TBD
API RP 582 Welding Guidelines for the Chemical,Oil, 1:00 Pm – 3:00 PM TBD
and Gas Industries
SCPRS Joint Session 1:00 PM – 5:00 PM TBD
Task Group on Std. 670, Machinery Protection Systems 8:00 AM - 5:00 PM TBD
API 942C SMR and Pyrolysis Furnace Tube Metallurgy 9:30 AM - 10:30 AM TBD