Professional Documents
Culture Documents
QUALIFICATION
2016 VMA Meeting
New Orleans, LA
Presented to:
VC Summer
March, 2016
Verification of Operational
Readiness & Test Interval
DataSheet
Valve Data
Actuator Data Validation of Verification of Tracking &
KVAP Design Basis Test Acceptance
System Data Test Acceptance Functional Trending of Key
Calculation & Set-up Criteria
Risk Ranking Criteria Margin Data
JOG Class
Adjustments
KVAP Calculation Engine KVAP Tracking & Trending
DiaCom
Valve Data
Actuator Data Validation of Verification of Tracking &
Design Basis Test Acceptance
System Data Test Acceptance Functional Trending of Key
Calculation & Set-up Criteria
Risk Ranking Criteria Margin Data
JOG Class
Adjustments
KVAP Calculation Engine KVAP Tracking & Trending
DiaCom
Appendix III
Functional Margin Projection
from: http://earthquake.usgs.gov/hazards/products/conterminous/
2016 VMA Conference 12
Background
• US Nuclear Regulatory Commission in Regulatory Guide
1.60 (Rev. 2, 2014) concludes that high frequency
motions at central and eastern United States (CEUS) rock
sites may be significantly greater than motions recorded
at western United States (WUS) rock sites.
Design Response Spectra for various damping levels from NRC RG 1.60
For 1g PGA (Peak Ground Acceleration), need to be scaled for other PGA
2016 VMA Conference 14
RIM (required input motion) for Line Mounted
Equipment (IEEE-382)