Professional Documents
Culture Documents
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Internal Works
Bathrooms
Total 6,600.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Internal Works
3 Ceiling
a Touch up plaster ceiling at ground floor and 1st floor L/S 500.00
4 Brickwall
a Paint basement, ground and 1st floor internal walls and ceilings L/S 5,600.00
5 Electrical works
Total 7,500.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
5 Balcony
a New R.C. Foundation, Columns, Roof Beams and Gutter. L/S 32,000.00
f Hack carporch slab for rain water down pipe outlet L/S 500.00
g Hack existing balcony floor tiles and cement screeding. L/S 800.00
Total 60,700.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
External work
6 Carporch
7 Kitchen
Total 18,800.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
External work
1 Painting Works
Total 3,300.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
RENODECOR DESIGN & FURNISHING Confirmed and Acceptted by,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Ground Floor
1st Floor
Total 10,600.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
2nd Floor
3rd Floor
Total 4,900.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Ground Floor
b Construct r.c. pad footings, stumps, ground beams, columns, roof beams, roof 70,000.00
slab and plastered brickwall.
c Construct R.C. columns, roof beams, roof slabs and plastered brickwall. 39,000.00
b Lay floor tiles. (Labour only for normal size 600x600mm) 8,500.00
c Lay power room wall and floor tiles. (Labour only for normal size 1,800.00
300x600mm)
Laundry and Wet Kitchen Extention
a Construct r.c. pad footings, stumps, ground beams, columns, roof beams, roof 70,000.00
slab and plastered brickwall.
c Wet Kitchen Floor and wall tiles (Labour only for normal 300x600mm) 6,200.00
Total 216,200.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
1st Floor
Masterbathroom
a Construct R.C. columns, roof beams, roof slabs and plastered brickwall. 39,000.00
b Construct plastered brickwall at shoe cabinet area and conceal door opening. 5,000.00
d Lay floor and wall tiles at masterbathrooms. (Labour only for normal 5,600.00
300x600mm)
2nd Floor
a Construct R.C. columns, beams, balcony slabs and plastered brickwall. 18,000.00
c Lay balcony floor tiles. (Labour only for normal size 300x600mm) 1,500.00
d Lay bathroom 4 floor and wall tiles. (Labour only for normal size 300x600mm) 3,800.00
Total 79,800.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
c Install aluminium sliding door between dining and wet kitchen area.(6x8) 1 set
Total -
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Total -
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
Dear Sir/Madam,
Further to our discussion, I am pleased to forward the following quotation for your kind perusal:
Summary
1 Page 1 10,600.00
2 Page 2 4,900.00
3 Page 3 216,200.00
4 Page 4 79,800.00
5 Page 5 -
6 Page 6 -
(Note: Include 50 light points and 20 power point for electrical works)
Total 311,500.00
Discount
Total after Discount 311,500.00
Should you need any further information and clarification, please do not hesitate to contact the undersigned immediately.
Thank you.
Best regards,
;.
Pantry
Bath 1
Bath 2
Reception Area
Automation
Area
Director Room
Pantry
Discussion Room
Bath
Bath 2 Store
20-Jul
VO2, SUNWAY VELOCITY (revised)
MELAMINE BOARD
OPEN OFFICE
Total 23,910.00
GST 6% 1,434.60
Total 25,344.60
VO2, SUNWAY VELOCITY
MELAMINE BOARD
OPEN OFFICE
Total 28,850.00
GST 6% 1,731.00
Total 30,581.00