The document is a checklist for a company's environmental quality management records control plan. It contains 11 items evaluating whether the control plan was developed according to methodology, includes all controls from the PFMEA, special product/process characteristics, and engineering performance tests. It also checks that required measuring instruments are available, the customer approved the plan, measurements meet customer requirements, and sample sizes are statistically valid.
The document is a checklist for a company's environmental quality management records control plan. It contains 11 items evaluating whether the control plan was developed according to methodology, includes all controls from the PFMEA, special product/process characteristics, and engineering performance tests. It also checks that required measuring instruments are available, the customer approved the plan, measurements meet customer requirements, and sample sizes are statistically valid.
The document is a checklist for a company's environmental quality management records control plan. It contains 11 items evaluating whether the control plan was developed according to methodology, includes all controls from the PFMEA, special product/process characteristics, and engineering performance tests. It also checks that required measuring instruments are available, the customer approved the plan, measurements meet customer requirements, and sample sizes are statistically valid.
Customer or Internal Part No: Evaluation Level: Completion Issues Yes NO N/A Measures of Evaluation/Requirement Principal Date
1 Is the control plan developed according to the
methodology in the APQP manual?
2 Are all controls identified in the PFMEA
included in the control plan?
Are all special product/process characteristics
3 included in the control plan?
4 Is PFMEA used to develop control plans?
Are all the material specifications required for
5 inspection identified? Has the control plan implemented a range of 6 processes from incoming(material/spare parts) to process/assembly(including packaging)? Are engineering performance tests and dimension 7 requirements identified?
Whether according to the requirements of the
8 control plan , measuring instruments and test equipment are available?
9 If required, did the customer approve the
control plan?
10 Does the measurement method and consistency meet
customer requirements?
11 Has the measurement system analysis been
completed according to customer requirements?
Are sample sizes based on industry standards,
statistical sampling schedules, or other 12 statistical process control methods or techniques?
FM-C0801-S02-02-04 Retention period: 20 years after the product is discontinued