Trip Report
Trip Report
Target
Date Project Location Location Chainage Activity Shift Excavator Model Excavator Dumper Model Dumper Lead Target Trips Volume(CUM)/ Actual Trips Actual Volume Subcontractor Subcontractor Engaged
Quantity Quantity (CUM)/MT Trips Volume(CUM) Staff
MT
SECTION -2
Crusher-2
Borrow Area Section - TATA 2825 &
5/25/2023 SATARA
2
From Ch 707 to 4 Murrum Day Excavator 220 1
TATA3525
km
Crusher-2
Borrow Area Section - TATA 2825 &
5/25/2023 SATARA 2 From Ch 707 to 4 Murrum Night Excavator 220 1 TATA3525 12 26/24/20 120 1440 27 324 14
km
Sabalwadi
Borrow Area Section - Murrum Excavator 220 TATA 2825 &
5/25/2023 SATARA
2
From Ch 699 to 7 Day 1
TATA3525
14 26/22/28/20 140 1680 49 588 16
km
Sabalwadi
Borrow Area Section - TATA 2825 &
5/25/2023 SATARA 2 From Ch 699 to 7 Murrum Night Excavator 220 1 TATA3525 0 0 0
km
KONJAURE
Borrow Area Section -
5/25/2023 SATARA
2
From Ch 711 to 14 Murrum Day 0
km
KONJAURE
Borrow Area Section -
5/25/2023 SATARA
2 From Ch 711 to 14 Murrum Night 0
km
TOTAL 3120 76 912 0
5/25/2023 SATARA Camp-2 Camp-2 WMM Day TATA 2825 & 6 24 10 507 10 506.98
TATA3525
trip 17/7/3(705/704/696)
trip 25/12/8/2
(705/703/692/696)
CAMP2
CY
CH.680+500